Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹64.8 LAccepted-AOC A CLASS CONTRACTOR P R PETA NEW COLONY WARD NO 09 JEYPORE KORAPUT | JEYPORE | KORAPUT | ODISHA | 1 | Accepted-AOC AS PER TRANPORANCY LOTTERY SYSTEM | |
| 2 | 2₹64.8 LSame as 1Rejected-AOC | 2 | Rejected-AOC AS PER TRANPORANCY LOTTERY SYSTEM | |
| 3 | 3₹70.7 L+₹5.9 L (9.13%)Rejected-Finance ARUNODAYA NAGAR P C SARKAR LANE DIST CUTTACK | CUTTACK | CUTTACK | ODISHA | 3 | Rejected-Finance COTED LOWEST RATE |
Tender Value
₹76.2 L
EMD Value
₹76,226
Closing Date
20 Apr 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHAIRMAN RMC JEYPORE
JEYPORE
Construction of GCI Cover shed, 500 MT Godown and FIC/FRS at Dangarpaunsi Market Yard Under RMC Jeypore
2022_OSAMB_76714_1
02/RMC JEYPORE/21-22
Open Tender
Civil Works - Buildings
Percentage
270 days
JEYPORE
PLEASE REFER TO TENDER DOCUMENTS
3 documents required · 3 mandatory
₹10,000
Yes
₹76,226
Yes
29 Jul 2022
6 Apr 2022
22 Apr 2022
6 Apr 2022
20 Apr 2022
6 Apr 2022
6 Apr 2022 - 11 Apr 2022
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in hard soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders requiring blasting including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site within initial leads and lifts, including shoring, shuttering & dewatering (if required) with cost of labour,cess, hire & running charges of water pumps sundries T & P & all other machineries required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge. | 430.02 | Each cum | 186.39 | ₹80,151.43 |
| 2 | Supplying and filling in foundation and plinth with good river sand well watered and rammed in layers not exceeding 23 cm in each layer including all leads and lifts, cost of all materials, labour,cess, sundries, T&P required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge. | 551.88 | Each cum | 293.11 | ₹1,61,761.55 |
| 3 | Providing and lying plain cement concrete of proportion (1:3:6) in foundation and plinths using approved quality cement , 40 mm. size black hard hand broken granite stone metal and screened, washed sharp sand for mortar of approved quality and from approved quarry, including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, cess, sundries, T&P & all other machineries required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump etc.complete in all respect as per latest specification & direction of the Engineer in charge. | 170.27 | Each cum | 4,444.18 | ₹7,56,710.53 |
| 4 | Flyash Brick masonary in Foundation and plinth in cement mortar (1:6) using the flyash bricks including hoisting to required height placing in position scaffolding, splays cutting, circular moulding, corbelling, chamfering and similar such type of work watering and curing etc. including cost, conveyance, royalty, cess, and taxes of all other materials machineries scaffolding all labour T&P articles required for the work etc. complete in all respect as per the latest specification confirming to relevant IS Specification and direction of the Engineer-in-charge. | 223.12 | Each cum | 4,065.47 | ₹9,07,087.67 |
| 5 | R.C.C. work of M 20 (equivalent to nominal mix of proportion (1:1.5:3) having a minimum compressive strength (in work test) of 200 Kg/cm2 in 15 cm. Cubes at 28 days after mixing and test conducted in accordance with IS 456 & 516 using 6mm to 20 mm (1/4” to 3/4") size (18mm not to exceed 25 percent) hard black broken granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete, watering and curing for four weeks centering and shuttering and finishing the exposed surface smooth to receive painting or white or colour washing providing grooves or beads where necessary cost and conveyance royalties and taxes of all materials and labour required for the work etc. complete with all T & P in all respect but excluding cost of M.S. rods or Tor steel and binding wires of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding etc. of the M.S. Rod and binding wires and tying the grills and placing in proper position in all floors.
a) Column footing,Base. | 30.99 | Each cum | 4,862.95 | ₹1,50,702.82 |
| 6 | b) Plinth band. | 21.75 | Each cum | 5,225 | ₹1,13,643.75 |
| 7 | c) Column & Beam (up to 5m. ) | 30.57 | Each cum | 10,575.56 | ₹3,23,294.87 |
| 8 | d) Column & Beam (Above 5m. ) | 7.82 | Each cum | 11,831.85 | ₹92,525.07 |
| 9 | e) Lintel & wall bond ( Upto 5mt) | 15.2 | Each cum | 8,381.81 | ₹1,27,403.51 |
| 10 | f)Chaja | 4.32 | Each cum | 781.87 | ₹3,377.68 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 0.74 MB
DTCN.pdf
Tender Document • 1.47 MB
BOQ_395382.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .