Loading…
Loading…
Tender Value
₹2.5 L
EMD Value
₹4,915
Closing Date
13 Oct 2026, 5:00 pm
Executive Officer
nagar palika parishad shamli
Ward 25 Construction of rcc drain from kishan vatika wali gali
2026_DOLBU_1187726_101
330/E-T/PWC/2026-27
Open Tender
Civil Works
Percentage
Ward 25 Construction of rcc drain from kishan vati
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Officer
₹4,915
22 Sept 2026
22 Sept 2026
14 Oct 2026
22 Sept 2026
13 Oct 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Reinforced Cement Concrete by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in 1 volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 4.05 | Cum | 1,032 | ₹4,179.6 |
| 2 | Cartage of Ballast, Kankar, Coal, Grit or Sand 1 etc. including loading and unloading but excluding stackings on pucca roads. Upto 8 Km. | 4.14 | Cum | 112.5 | ₹465.75 |
| 3 | Dismantling of Dismantling Brick existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. | 6.76 | cum | 409 | ₹2,764.84 |
| 4 | Deduct the cost of old bricks class-100 | 467 | nos | 4.5 | ₹2,101.5 |
| 5 | Ded the cost of old bricks/bats M-75 | 1.01 | cum | 900 | ₹909 |
| 6 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side | 12.42 | cum | 177.2 | ₹2,200.82 |
| 7 | Cartage of Ballast, Kankar, Coal, Grit or Sand 1 etc. including loading and unloading but excluding stackings on pucca roads. Upto 8 Km. | 11.18 | cum | 230.1 | ₹2,572.52 |
| 8 | providing & supply gunny bags inluding cost of sand and stitching of bags and laying in position. | 5 | each bag | 18 | ₹90 |
| 9 | Dewatering/Diversion of water by diesal engine pump including opretor fuel required length of flexible pipe for proper disposal of water etc all. | 40 | Hrs | 600 | ₹24,000 |
| 10 | Plain/reinforced cement concrete (P.C.C grade M 20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. I/c all cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST | 13.85 | Cum | 7,245.99 | ₹1,00,356.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
technicaldocument.pdf
Tender Documents • 1.52 MB
BOQ_2237980.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .