| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | Rejected-Technical | - | Rejected-Technical Evaluation Rejected |
| Sl No | Description | Qty | Unit | M. DHANDAPANI L1 |
|---|---|---|---|---|
| 1.00 | Dismantling the damaged Reinforced Cement Concret slab as per the instruction of Departmental officers. Including all initial lead and other labour charges | 9 | M3 | 3,614 ₹32,526 Lowest |
| 2.00 | Desilting in the existing drain as per the direction of departmental officers etc. completed | 59 | M3 | 103 ₹6,077 Lowest |
| 3.00 | Dismantling the damaged Cement Concret work as per the instruction of Departmental officers. Including all initial lead and other labour charges | 74 | M3 | 534 ₹39,516 Lowest |
| 4.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-incharge | 298 | M3 | 181 ₹53,938 Lowest |
| 5.00 | Cement concrete 1:4:8 (one cement, four sand’ and eight aggregate ) using 4Omm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost o reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 40 | M3 | 5,590 ₹2,23,600 Lowest |
| 6.00 | Supplying and erecting Shuttering including necessary supports for plane surfaces such as Drain walls etc, using mild steel sheets of size 90x60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 859 | M2 | 489 ₹4,20,051 Lowest |
| 7.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost oO reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 119 | M3 | 6,319 ₹7,51,961 Lowest |
| 8.00 | Plastering with cement mortar 1:5 mix 12 mm thick (One cement five sand) per direction of departmental officers etc,completed. | 155 | M2 | 292 ₹45,260 Lowest |
| 9.00 | Reinforced Cement Concrete in 1:1.5:3 Mix using. 20 mm size hard broken granite Stone Jelly from approved quarry including Mixing, Laying, Compacting, Finishing, Curing and all Labour Charges as per the Direction of the Departmental officers Etc, Complete. | 29 | M3 | 9,373 ₹2,71,817 Lowest |
| 10.00 | Supplying and fabrication and placing in position steel reinforcement using mild steel/Ribbed for steel rods for all RCC work as per the design given including cost of steel and binding wire in all floors complying with standard specification and drawings etc.. | 29 | Qtl | 9,321 ₹2,70,309 Lowest |
Tender Value
₹29.5 L
EMD Value
₹29,500
Closing Date
13 Oct 2025, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Reconstruction of Storm water drain at MGR Nagar street 1 in Ward No.32 Central Zone.
2025_MAWS_612617_8
e48/2025- Two Cover
Open Tender
Civil Works
Works
150 days
Coimbatore corporation
As Per Tender Document
5 documents required · 5 mandatory
₹0
₹29,500
10 Nov 2025
9 Oct 2025
14 Oct 2025
9 Oct 2025
13 Oct 2025
9 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .