Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.2 CrAccepted-Finance DADRA AND NAGAR HAVELI DN | DADRA AND NAGAR HAVELI | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396193 | L1 | Accepted-Finance Lowest rate found. | |
| 2 | L2₹40.6 Cr+₹1.5 Cr (3.75%)Accepted-Finance | L2 | Accepted-Finance High rate found. |
Tender Value
₹31.4 Cr
EMD Value
₹41.4 L
Closing Date
4 Apr 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Exe., Engg., PWD, WD-I, Daman.
The Multi Office Complex, PWD, 2nd Floor, Near Moti Daman Market, Moti Daman.
Construction of Block -IV at Government Hospital, Marwad in Daman District.
2024_DAMAN_3511_1
Tender Notice NO. 186/2023-24
Open Tender
Civil Works
Works
450 days
Daman
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
The Exe., Engg., PWD, WD-I, Daman.
₹41.4 L
The Exe., Engg., PWD, WD-I, Daman.
30 Jul 2024
15 Mar 2024
4 Apr 2024
15 Mar 2024
4 Apr 2024
15 Mar 2024
21 Mar 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Items : | |||||
| 1.01 | 01-CIVIL WORKS
Sec.1.0 Earth work
Providing material and labour, machinery for Excavation of foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff with in the campus for all lead, all lift/ depth and back filling foundations, the trenches, plot filling, plinth filling with excavted material (excluding hard rock and black cotton soil) anywhere from the site/ campus etc complete as directed by Engineer in charge. - Any type of soil or rock not requiring Blasting. | 4,896 | Cum | - | - |
| 1.02 | Providing material and labour for Excavation of foundation from 1.5 mt to 3.0 mt depth including sorting out and stacking of useful materials and disposing off the excavated stuff with in the campus for all lead, all lift/ depth and back filling foundations, the trenches, plot filling, plinth filling with excavted material (excluding hard rock and black cotton soil) anywhere from the site/ campus etc complete as directed by Engineer in charge.
- Any type of soil or rock not requiring Blasting. | 4,896 | Cum | - | - |
| 1.03 | Providing material and labour for Excavation of foundation from 3.0 mt to 5.0 mt depth including sorting out and stacking of useful materials and disposing off the excavated stuff with in the campus for all lead, all lift/ depth and back filling foundations, the trenches, plot filling, plinth filling with excavted material (excluding hard rock and black cotton soil) anywhere from the site/ campus etc complete as directed by engineer in charge.
- Any type of soil or rock not requiring Blasting. | 4,798 | Cum | - | - |
| 1.04 | Providing material and labour for Excavation of foundation from 5.0 mt to 7.0 mt depth including sorting out and stacking of useful materials and disposing off the excavated stuff with in the campus for all lead, all lift/ depth and back filling foundations, the trenches, plot filling, plinth filling with excavted material (excluding hard rock and black cotton soil) anywhere from the site/ campus etc complete as directed by Engineer in charge.
- Any type of soil or rock not requiring Blasting. | 50 | Cum | - | - |
| 1.05 | Providing material and labour for Disposing off the un-used excavated earth (black cotton soil), debris, malba, dismantled materials for all lead and lift/ depth out side the campus at non objectional place as directed by Engineer in charge. | 50 | Cum | - | - |
| 1.06 | Providing material and labour for Filling in plinth with sand under floors or base of foundation including watering ramming, consolidating and dressing etc complete as directed by Engineer in charge. | 225 | Cum | - | - |
| 1.07 | Providing material and labour for Filling in foundation, plinth and plot filling with murrum (brought from out side) in layers of 20cm. thickness including watering, ramming and consolidating etc complete as directed by Engineer in charge. | 843 | Cum | - | - |
| 1.08 | Providing material and labour for injecting Chemical emulsion for PRE - CONSTRUCTIONAL anti-termite treatment and creating a chemical barrier on the top surface of plinth filling, inside junction of wall and floor, on top of damp proof course (DPC) or on masonry at level of plinth filling as per IS 6313 (Part-2)-1981 using chemical like chloropyripos emulsifiable, Biflex TC, lindane (IS 8944-1978) 20EC mixed with water in 1:19 ratio (1 liter chemical : 19 liters of water). The emulsion shall mentioned below, all as per specification and directions of Engineer-in-charge. Plinth area in plan at GF shall only be measured (for akk below specified steps) and paid. A guarantee bond of 10 years shall be furnished.
A1) Bottom surface and the sides of the excavation made for masonry foundations at the rate of 4 liters/sqm (wherever applicable)
A2) At the rate of 7.5 liter/ sqm to the backfill at the depth of 500mm below the original ground level. The soil in the immediate contact with the vertical surface of RCC column/ Masonry shall be treated.
B) Top surface of the plinth filling including damp proof courses at the rate of 5 liter/sqm of internal plinth area etc. complete.
C) At the rate of 7.5 liter/ sqm to the internal vertical surface from original Ground level to top of the earth filled in the plinth.
D) At the rate of 7.5 liter/ sqm to the external vertical surface below finished Ground level to the full depth of the filling complete.
E) 1 liter / linear meter along the junction of wall and floor at all stages. | 2,635 | Sqm | - | - |
| 1.09 | Sec: 2.0 PCC & RCC works
Providing material and labour for laying Autoclave Aerated Concrete Block chips/ bats cement concrete in 1:4:8 (1 Cement : 4 Coarse Sand : 8 graded Autoclave Aerated Concrete Block chips/ bats) for sunk filling grade including compacting, finishing, curing etc. complete as directed by engineer in charge. | 63 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_3638.xls
BOQ • 7.02 MB
142111944.pdf
Tender Documents • 3.87 MB
142111947.html
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .