| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹49.4 LAccepted-AOC | ₹49.4 L | L-1 | Accepted-AOC Accepted as L-1 |
| 2 | L-2₹49.5 L+₹15,950.50 (0.32%)Rejected-Finance | ₹49.5 L+₹15,950.50 (0.32%) | L-2 | Rejected-Finance Rejected as L-2 |
| 3 | L-3₹77.8 L+₹28.4 L (57.5%)Rejected-Finance H NO 222 1 GHUTRIDAFAI HALDIBADI CHIRIMIRI KORIYA CHHATTISGARH 497451 | KOREA | CHHATTISGARH | 497451 | ₹77.8 L+₹28.4 L (57.5%) | L-3 | Rejected-Finance Rejected as L-3 |
| 4 | L-4₹83.2 L+₹33.9 L (68.6%)Rejected-Finance WARD NO 06 RANJCET DAFAI AMLAI COLLIERY DISTT ANUPPUR M P | ANUPPUR | ANUPPUR | MADHYA PRADESH | ₹83.2 L+₹33.9 L (68.6%) | L-4 | Rejected-Finance Rejected as L-4 |
| 5 | L-5₹83.4 L+₹34.0 L (68.9%)Rejected-Finance | ₹83.4 L+₹34.0 L (68.9%) | L-5 | Rejected-Finance Rejected as L-5 |
| Sl No | Description | Qty | Unit | VIKASH KUMAR VISHWAKARMA L1 | UDAY RAJ SINGH L4 | MAHENDRA SINGH L2 | SURENDRA KUMAR SINGH L5 | HASDEO TERRATRAVERSE LLP L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00(A) Labour cost | ||||||||
| 1.01 | cleaning/removal of debris/stone from galleries and stacking within 50 mtr. | 166.11 | m3 | 58,593.64 ₹69,140.5 | 98,669.34 ₹1,16,429.82 | 49,833 ₹58,802.94 Lowest | 98,835.45 ₹1,16,625.83 | 91,360.5 ₹1,07,805.39 |
| 1.02 | Groove cutting for stopping and manhole by chisel/pickaxe and hammer
(a )in soft stone | 12.57 | m3 | 44,812.05 ₹52,878.22 | 75,495.42 ₹89,084.6 | 43,995 ₹51,914.1 Lowest | 75,495.42 ₹89,084.6 | 70,392 ₹83,062.56 |
| 1.03 | (b) In soft stone | 12.57 | m3 | 44,812.05 ₹52,878.22 | 75,495.42 ₹89,084.6 | 43,995 ₹51,914.1 Lowest | 75,507.99 ₹89,099.43 | 71,045.64 ₹83,833.86 |
| 1.04 | (c) In Coal | 40.95 | m3 | 40,077.77 ₹47,291.77 Lowest | 67,567.5 ₹79,729.65 | 45,045 ₹53,153.1 | 67,772.25 ₹79,971.26 | 63,063 ₹74,414.34 |
| 1.05 | Reinforced cement concrete(1:2:4) in wall/roof ceiling of air crossing/stopping (any thickness)in u/g (Excluding,shuttering, reinforcement cutting, bending, placing in position and binding etc) | 297.46 | m3 | 9,47,886.04 ₹11,18,505.53 Lowest | 15,97,360.2 ₹18,84,885.04 | 9,81,618 ₹11,58,309.24 | 15,97,360.2 ₹18,84,885.04 | 14,67,965.1 ₹17,32,198.82 |
| 1.06 | Centring, shuttering, finishing and reinforcement including cutting,bending, placing in position and binding and strutting, propping etc complete.
(6.00 x 3.50x 2 x42) = 1764.00 m2 | 1,542.45 | m2 | 9,43,979.4 ₹11,13,895.69 | 15,88,723.5 ₹18,74,693.73 | 6,94,102.5 ₹8,19,040.95 Lowest | 15,88,723.5 ₹18,74,693.73 | 14,65,327.5 ₹17,29,086.45 |
| 1.07 | Cement concrete/PCC (1:2:4) in foundation/plinth/flooring/wall(any thickness)in ug(excluding centring, shuttering and cost of material) | 19.43 | m3 | 50,395.59 ₹59,466.8 Lowest | 84,909.1 ₹1,00,192.74 | 52,461 ₹61,903.98 | 85,006.25 ₹1,00,307.38 | 79,672.72 ₹94,013.81 |
| 1.08 | 6mm thick cement plaster(1:4) to RCC/PCC work in u/g (exclusive material) | 1,542.45 | m2 | 3,43,195.13 ₹4,04,970.25 | 5,78,418.75 ₹6,82,534.13 | 2,77,641 ₹3,27,616.38 Lowest | 5,86,131 ₹6,91,634.58 | 5,36,772.6 ₹6,33,391.67 |
| 1.09 | 12 mm thick cement plaster(1:4) to RCC/PCC work in u/g (exclusive material) | 569.1 | m2 | 1,36,242.54 ₹1,60,766.2 | 2,29,347.3 ₹2,70,629.81 | 1,02,438 ₹1,20,876.84 Lowest | 2,30,485.5 ₹2,71,972.89 | 2,16,258 ₹2,55,184.44 |
Tender Value
₹76.4 L
EMD Value
₹95,500
Closing Date
24 Jun 2026, 5:00 pmClosed
STAFF OFFICER MINING
OFFICE OF THE STAFF OFFICER MINING
Construction of 16 Nos. R.C.C. sectionalization stoppings in Panel T17, T18 T19, in Seam VII and 26 nos RCC Isolation stoppings in Panel B36, B5, B35 and B6 in Seam VIB at Khairaha U. G. Mine.
2026_SECL_360920_1
SECL/SGP/SO(M)/2026-27/NIT-737 dated 08-06-2026
Open Tender
Civil Works - Others
Item Rate
365 days
KHAIRAHA UG
as per NIT
8 documents required · 8 mandatory
₹95,500
1 Aug 2026
8 Jun 2026
26 Jun 2026
8 Jun 2026
24 Jun 2026
9 Jun 2026
8 Jun 2026 - 17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1(A) Labour cost | |||||
| 1.01 | cleaning/removal of debris/stone from galleries and stacking within 50 mtr. | 166.11 | m3 | 545.18 | ₹90,559.85 |
| 1.02 | Groove cutting for stopping and manhole by chisel/pickaxe and hammer
(a )in soft stone | 12.57 | m3 | 5,510.21 | ₹69,263.34 |
| 1.03 | (b) In soft stone | 12.57 | m3 | 5,510.21 | ₹69,263.34 |
| 1.04 | (c) In Coal | 40.95 | m3 | 1,512.61 | ₹61,941.38 |
| 1.05 | Reinforced cement concrete(1:2:4) in wall/roof ceiling of air crossing/stopping (any thickness)in u/g (Excluding,shuttering, reinforcement cutting, bending, placing in position and binding etc) | 297.46 | m3 | 4,925.15 | ₹14,65,035.12 |
| 1.06 | Centring, shuttering, finishing and reinforcement including cutting,bending, placing in position and binding and strutting, propping etc complete.
(6.00 x 3.50x 2 x42) = 1764.00 m2 | 1,542.45 | m2 | 945.21 | ₹14,57,939.16 |
| 1.07 | Cement concrete/PCC (1:2:4) in foundation/plinth/flooring/wall(any thickness)in ug(excluding centring, shuttering and cost of material) | 19.43 | m3 | 4,008.8 | ₹77,890.98 |
| 1.08 | 6mm thick cement plaster(1:4) to RCC/PCC work in u/g (exclusive material) | 1,542.45 | m2 | 343.79 | ₹5,30,278.89 |
| 1.09 | 12 mm thick cement plaster(1:4) to RCC/PCC work in u/g (exclusive material) | 569.1 | m2 | 370 | ₹2,10,567 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 1.48 MB
BOQ_373795.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .