Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-Finance | ₹6.5 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹6.5 L+₹9,500.19 (1.47%)Accepted-Finance GOVT CONTRACTOR TEYLERABAD SRI VIJAYA PURAM PIN 744105 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744105 | ₹6.5 L+₹9,500.19 (1.47%) | L2 | Accepted-Finance Accepted |
| 3 | L3₹6.7 L+₹27,708.87 (4.29%)Accepted-Finance | ₹6.7 L+₹27,708.87 (4.29%) | L3 | Accepted-Finance Accepted |
| 4 | L4₹7.1 L+₹66,342.95 (10.3%)Accepted-Finance | ₹7.1 L+₹66,342.95 (10.3%) | L4 | Accepted-Finance Accepted |
| 5 | L5₹7.2 L+₹79,168.20 (12.3%)Accepted-Finance | ₹7.2 L+₹79,168.20 (12.3%) | L5 | Accepted-Finance Accepted |
Tender Value
₹7.9 L
EMD Value
₹15,834
Closing Date
1 Jun 2026, 3:00 pmClosed
EE, SVPND, APWD, Sri Vijaya Puram
EE, SVPND, APWD, Sri Vijaya Puram
A/R and M/O Residential building under SVPND, APWD, Sri Vijaya Puram during 2026-27. SW_ Repair and maintenance work of Type-IV Qtr bearing No. JG-53 under Junglighat Sub Division No-I, SVPND, APWD, Sri Vijaya Puram.
2026_APWD_23112_1
NIT No. 18/EE/SVPND/2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Sri Vijaya Puram
Please refer tender documents
7 documents required · 7 mandatory
₹0
₹15,834
4 Jun 2026
22 May 2026
2 Jun 2026
22 May 2026
1 Jun 2026
23 May 2026
22 May 2026 - 29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | |||||
| 1.1 | Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | - | cum | - | - |
| 2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 2.1 | All kinds of soil. | 1 | cum | - | - |
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 3.1 | 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | 1 | - |
| 3.2 | 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 1 | - |
| 4Centering and shuttering including strutting, propping etc. and removal of form for | |||||
| 4.1 | Foundations, footings, bases of columns, etc. for mass concrete | 1 | sqm | 1 | ₹1 |
| 5 | Providing and fixing bolts including nuts and washers complete. | 1 | kg | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
TenderDocNIT18.pdf
Tender Documents • 1.34 MB
Instructions-to-bidders.pdf
Other Documents • 0.33 MB
BOQ_24501.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .