Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.6 LAdmitted-Finance | -7.25% | ₹18.6 L | L1 | Admitted-Finance |
| 2 | L2₹19.0 LAdmitted-Finance | -5.11% | ₹19.0 L | L2 | Admitted-Finance |
| 3 | L3₹19.4 LAdmitted-Finance | -3.03% | ₹19.4 L | L3 | Admitted-Finance |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
26 Feb 2026, 6:00 pmClosed
DPC
OFFICE OF THE DPC SMSA UDAIPUR
CONSTRUCTION OF DINING HALL AT KGBV SEMARI BLOCK- SEMARI DISTRICT- SALUMBER
2026_RCSCE_537999_399
NIT 06/CIVIL/2025-26/SMSA UDAIPUR
Open Tender
Civil Works - Buildings
Percentage
SALUMBER
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
ADPC SAMAGRA SHIKSHA/MD RISL
₹40,000
19 Mar 2026
17 Feb 2026
27 Feb 2026
17 Feb 2026
26 Feb 2026
17 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BASED ON PWD INTEGRATED BSR 2022 | |||||
| 1.01 | Earth work in excavation/ by mechanical means (Hydraulic Excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50 m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed:Ordinary rock | - | cum | 251 | - |
| 1.02 | Earth Work in excavation in foundation trench or drains including dressing of sides and ramming of bottoms, lift upto 1.5 m including tacking out the excavated soil and depositing and refilling of Jhiri with watering and remming and disposal surplus excavated soil as directed with in a lead of 50 m. all kind of soil. | 0.4 | cum | 178 | ₹71.2 |
| 1.03 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1 | cum | 3,302 | ₹3,298.7 |
| 1.04 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.
M20 grade Nominal Mix / Design Mix | - | cum | 4,934 | - |
| 1.05 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 1 | cum | 2,838 | ₹2,835.16 |
| 1.06 | Supplying and Filling in plinth with blown sand under floors including watering ramming consolidating and dressing complete including cost of sand. | 1 | cum | 450 | ₹449.55 |
| 1.07 | Anti termite treatment of floor using Imidacloprid 30.5% EC non repellent, odorless, low dose, environmentally safe terniticide with rapid action non corrosive stain free, by drilling 12mm diameter holes 300mm apart injecting the emulsion as per specification and plugging with cement mortar 1:2 ( 1 cement : 2 coarse sand) in the whole floor area DPE 12mm dia termitube system with required number of junction boxes are to be installed. The termitube will run all along the perimeter wall both inside and outside. In the middle area the termitube to be installed at an interval of 1.00 Mtr. or less both ways as required with sufficient number of junction boxes to pump the emulsion. After successful testing of termitube, pesticide emulsion of imidacloprid 30.5% EC mixed with water in the ration of 1:474 will be pumped by a motorized spray pump from the junction box in specified manner. The plinth area of the area treated will be measured for payment. | 0.4 | sqm | 216 | ₹86.18 |
| 1.08 | Brick work with clay flyash F.P.S. brick (IS 13757- 1993 ) of class designation 75 in superstructure above plinth level upto floor five level in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | - | cum | 4,832 | - |
| 1.09 | Random Rubble dry stone kharanja under floor | - | cum | 932 | - |
stage.html
html • 0.03 MB
techsummary_962109.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
Tendernotice_2.pdf
PDF • 18.78 MB
BOQ_962109.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].