Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.0 L+₹21,220.43 (7.69%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.2 L+₹41,167.64 (14.9%)Admitted-Fee/PreQual/Technical/Finance PLOT NO 5 E BLOCK 203 HARMONEY BLUE MOON ARUL MURUGAN NAGAR ZAMIN PALLAVARAM CHENNAI 600 117 | CHENGALPATTU | TAMIL NADU | 600117 | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹3.2 L+₹42,440.86 (15.4%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹3.3 L+₹50,929.04 (18.5%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.2 L
EMD Value
₹4,300
Closing Date
23 Nov 2026, 5:45 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
o/o the Executive Engineer PWD Buildings C and M Division Pudukkottai
Special Repairs to Leaky Roof, Flooring, Toilet and Painting in HSC at Kalamavur in Pudukkottai District
2026_PWD_723240_1
07-1/2026-27
Open Tender
Civil Works - Buildings
Lump-sum
60 days
Kalamavur Pudukkottai
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹4,300
24 Nov 2026
6 Nov 2026
24 Nov 2026
6 Nov 2026
23 Nov 2026
6 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Pressed tiles & weathering course etc., Complete. | 77.65 | M2 | 49.2 | ₹3,820.38 |
| 2 | Dismantling Clean removal of Cement plaster from walls etc., Complete. | 50 | M2 | 9.06 | ₹453 |
| 3Finishing the top of roof with one course of machine pressed tiles of following size of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers | |||||
| 3.01 | New Tiles 70% | 54.35 | M2 | 1,347.15 | ₹73,217.6 |
| 3.02 | Old Tiles 30% | 23.3 | M2 | 1,036 | ₹24,138.8 |
| 4 | Providing Polymer Coating (Water Proof Coating) for sunken Portion of toilet with following specification and the surface shall be cleaned to remove all dust, foreign, matters lose materials or any other deposits of contamination by rubbing with wire brush.Slurry: Dry blend and polymer liquid blend shall be mixed into the desired ratio as per recommendation of the supplier. The mix shall be stirred throughly until no bubbles remain in the mix. Any lumps found in mix shall be removed.Apply first coat of polymer modified cementitious slurry by brush on wet cleaned surface. After drying, second coat shall be applied on the first coat as directed by the departmental officers etc. The rate inclusive of cost of materials and labour, etc., complete. | 77.65 | M2 | 329 | ₹25,546.85 |
| 5 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including mortar plasticizer at 200ml per 50Kg of cement used , hacking the surfaces and curing, etc., in all floors complying with standard specification and as directed by the departmental officers | 44 | M2 | 331.3 | ₹14,577.2 |
| 6 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 6 | M2 | 288.9 | ₹1,733.4 |
| 7 | Supplying , fabricating and fixing in position Aluminium Anodised natural colour matt finish Two track sliding window in all floors with Aluminium sections of outer Frame bottom 62x37mmx1.50mm at 1.218 kg/m,the Side & Top 62x31.50x1.50mm at 0.778 kg/m,Shutter Top 40x18x1.5 at 0.38 kg/m,Bottom 40x18x1.5 at 0.38kg/m, Side Vertical 40x18x1.50mm at 0.493 kg/m, Vertical locking section 40x29x1.5mm at 0.632 kg/m, with necessary accessories such as rubber beadings, special hinges, lock, handle including supplying and fixing 4mm thick plain glass including cost of all materials, labours, power consumption required for fabrication , drilling holes in RCC colunm, slab, masonry walls wherever necessary with power drills to the required extent and make good to the original condition after fixing etc... complete complying with standard specification and as directed by the deparmental officers.The aluminium sections are to be anodised with matt finish under electrically controlled in accordance with IS 1868 / 1962 for an average anodic film thickness 15 microns etc., complete. | 5.68 | M2 | 3,983.25 | ₹22,624.86 |
| 8 | Supplying , fabricating and fixing in position Aluminium Anodised natural colour matt finish Three track sliding window in all floors with Aluminium sections of Outer Frame bottom [email protected] kg/m,Top & vertical 92.34x29.70x1.50 at 1.066 kg/m, Shutter vertical 39x20x1.50 at 0.493 kg/m,Top & Bottom 18x36.6x1.50 at 0.439 kg/m,Vertical locking arrangement 28.94x39x1.50at0.632 kg/m, the follwing sizes with necessary accessories such as rubber beadings, special hinges, lock, handle including supplying and fixing 4mm thick plain glass including cost of all materials , labours, power consumption required for fabrication , drilling holes in RCC colunm, slab, masonry walls wherever necessary with power drills to the required extent and make good to the original condition after fixing etc... complete complying with standard specification and as directed by the deparmental officers.The aluminium sections are to be anodised with matt finish under electrically controlled in accordance with IS 1868 / 1962 for an average anodic film thickness 15 microns etc., complete. | 5.22 | M2 | 4,004.35 | ₹20,902.71 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
TenderconditionskalamavurHSC.pdf
Tender Documents • 1.17 MB
BOQ_868349.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .