Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | ₹1.9 L | L1 | Admitted-Finance |
| 2 | L2₹1.9 LAdmitted-Finance | ₹1.9 L | L2 | Admitted-Finance |
| 3 | L3₹5.5 LAdmitted-Finance | ₹5.5 L | L3 | Admitted-Finance |
| 4 | L4₹17.5 LAdmitted-Finance | ₹17.5 L | L4 | Admitted-Finance |
| 5 | L5₹33.4 LAdmitted-Finance | ₹33.4 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ABSOLUTE ENGINEERING SOLUTIONS L5 | Nav Technologies and Services L3 | Aaditech Solutions L4 | J.D.ELECTRONICS L2 | Cyber Communications L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00One-time Development Cost | ||||||||
| 1.01 | Generation of specifications and design development | 1 | Nos | - | 10,000 ₹10,000 | 2,50,000 ₹2,50,000 | 6,000 ₹6,000 Lowest | 6,500 ₹6,500 |
| 1.02 | Cost of tooling/dies/fixtures and such other one time investment | 1 | Nos | - | 20,000 ₹20,000 | 1,20,000 ₹1,20,000 | 10,000 ₹10,000 | 2,000 ₹2,000 Lowest |
| 1.03 | Cost of qualification acceptance/life cycle testing | 1 | Nos | - | 40,000 ₹40,000 | 50,000 ₹50,000 | 4,000 ₹4,000 | 2,500 ₹2,500 Lowest |
| 2.00Cost of Prototype, per Unit/Piece | ||||||||
| 2.01 | Cost of Labor (per Unit/Piece)
(Tech & Non-tech) | 1 | Nos | 25,000 ₹25,000 | 10,000 ₹10,000 | 15,500 ₹15,500 | 2,000 ₹2,000 | 1,000 ₹1,000 Lowest |
| 2.02 | Cost of Material (per Unit/Piece) | 1 | Nos | 25,000 ₹25,000 | 6,000 ₹6,000 | 18,000 ₹18,000 | 1,500 ₹1,500 Lowest | 1,800 ₹1,800 |
| 2.03 | Overhead Expenditure | 1 | Nos | 10,000 ₹10,000 | 3,000 ₹3,000 | 5,000 ₹5,000 | - | 800 ₹800 Lowest |
| 2.04 | Any other factor please specify | 1 | Nos | - | - | 5,000 ₹5,000 | - | 300 ₹300 Lowest |
| 2.05 | Profit Margin | 1 | Nos | 17,776 ₹17,776 | 2,000 ₹2,000 | 50,000 ₹50,000 | 500 ₹500 Lowest | 1,500 ₹1,500 |
Tender Value
Refer Docs
Closing Date
29 Jun 2026, 11:00 amClosed
SPE ISC
SPE ISC 7BRD, AF STATION TUGHLAKABAD
Indigenous Development of Hose
2026_IAF_771404_1
7BRD/INDG/RFP/04/2026-27
Open Tender
Mechanical Maintenance Services
Supply
180 days
AIR FORCE STATION TUGHLAKAKABD
PLEASE REFER TENDER DOCUMENT.
2 documents required · 2 mandatory
₹0
Exempted
C PLAN OFFICE, 7BRD
20 Aug 2026
11 Jun 2026
30 Jun 2026
11 Jun 2026
29 Jun 2026
12 Jun 2026
11 Jun 2026 - 29 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1One-time Development Cost | |||||
| 1.01 | Generation of specifications and design development | - | Nos | - | - |
| 1.02 | Cost of tooling/dies/fixtures and such other one time investment | - | Nos | - | - |
| 1.03 | Cost of qualification acceptance/life cycle testing | - | Nos | - | - |
| 2Cost of Prototype, per Unit/Piece | |||||
| 2.01 | Cost of Labor (per Unit/Piece)
(Tech & Non-tech) | - | Nos | - | - |
| 2.02 | Cost of Material (per Unit/Piece) | - | Nos | - | - |
| 2.03 | Overhead Expenditure | - | Nos | - | - |
| 2.04 | Any other factor please specify | - | Nos | - | - |
| 2.05 | Profit Margin | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
RFPHOSE1.pdf
Tender Documents • 0.63 MB
BOQ_863847.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].