| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr | L1 | Accepted-AOC Work Order Allotted |
| 2 | L1₹1.5 CrRejected-Finance BISHNU RABHA NAGAR NOONMATI GUWAHATI 20 | ₹1.5 Cr | L1 | Rejected-Finance Work order not Allotted |
| 3 | L1₹1.5 CrRejected-Finance | ₹1.5 Cr | L1 | Rejected-Finance Work order not Allotted |
| 4 | Rejected-Technical 5TH FLOOR BASISTHA CHARIALI GHY 29 | - | - | Rejected-Technical documents not found in order |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
21 Feb 2023, 12:00 pmClosed
CHD, Irrigation, BTC
CHD, Irrigation, BTC, Kokrajhar
Oubari Balabari FIS (Canal system) under PMKSY-HKKP for the year 2021-22
2023_BoTC_29046_10
CHDI/ET/2022-23/8
Open Tender
Civil Works
Works
365 days
Sukla
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,500
₹3.4 L
Yes
23 Aug 2023
30 Jan 2023
21 Feb 2023
30 Jan 2023
21 Feb 2023
1 Feb 2023
Amount
Construction of Slab Culvert Earth work in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15cm layers on both the banks as necessary including clearing light jungles, removing trees up to 15cm, uprooting roots, stumps from the seat of embankment and canal bed and free from all vegetation including breaking clods not more than 10mm cube ramming, dressing and roughening the seat of embankment with lead up to 30m and lift up to 1.5m complete as directed. B.(i)Hard soil (Soil mixed with gravel or morum up to 50mm size)
Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)A) River Singles (i)Without shuttering & without Dewatering
Cement Concrete work in proportion 1: 2: 4 with aggregate of size 6mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)A) River Singles (i)Without shuttering & without Dewatering
Cement Concrete work in proportion 1: 1 ½: 3 with aggregate of size 6 mmto 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed.(Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)(A) Hard river broken stone 6 mm to 20 mm size (i)Without shuttering & without Dewatering
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
Centering and shuttering including propping etc. where necessary and removal of forms after completion of C.C. and R.C.C. works complete as directed. (Measurement will be taken on the face area of timber) (a) Shuttering column , pier etc (Fitting and dismantling)
Centering and shuttering including propping etc. where necessary and removal of forms after completion of C.C. and R.C.C. works complete as directed. (Measurement will be taken on the face area of timber)(a) Shuttering Slab (Fitting and dismantling)
12mm thick cement plastering including clearing surfaces and curing etc. complete as directed.
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
Construction of Slab Culvert (12m) Earth work in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15cm layers on both the banks as necessary including clearing light jungles, removing trees up to 15cm, uprooting roots, stumps from the seat of embankment and canal bed and free from all vegetation including breaking clods not more than 10mm cube ramming, dressing and roughening the seat of embankment with lead up to 30m and lift up to 1.5m complete as directed. B.(i)Hard soil (Soil mixed with gravel or morum up to 50mm size)
Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)A) River Singles (i)Without shuttering & without Dewatering
Cement Concrete work in proportion 1: 2: 4 with aggregate of size 6mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)A) River Singles (i)Without shuttering & without Dewatering
Cement Concrete work in proportion 1: 1 ½: 3 with aggregate of size 6 mmto 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed.(Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)A) River Singles (i)Without shuttering & without Dewatering
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
Centering and shuttering including propping etc. where necessary and removal of forms after completion of C.C. and R.C.C. works complete as directed. (Measurement will be taken on the face area of timber)
Centering and shuttering including propping etc. where necessary and removal of forms after completion of C.C. and R.C.C. works complete as directed. (Measurement will be taken on the face area of timber)
12mm thick cement plastering including clearing surfaces and curing etc. complete as directed. (i) In proportion 1:3
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
Main Canal From Chainage 0 m To 200m:- Earth work in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15cm layers on both the banks as necessary including clearing light jungles, removing trees up to B.(i)Hard soil (Soil mixed with gravel or morum up to 50mm size)
Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measura (i)Distance of work site from quarry @ 25 Km
Carriage of boulder, gravels, metals, screening sand etc. by truck including loading, unloading and stacking in measurable stacks at site as directed complete.
Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete incl
Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materia A) River Singles (i)Without shuttering & without Dewatering
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as direc
Reinforced Cement Concrete work in proportion 1: 2: 4 with aggregate of size 6 mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying A) River Singles (i)Without shuttering & without Dewatering
Centering and shuttering including propping etc. where necessary and removal of forms after completion of C.C. and R.C.C. works complete as directed. (Measurement will be taken on the face area of timber) (a) Shuttering column , pier etc (Fitting and dismantling)
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1
Main Canal From Chainage 200 m To 600m:- Earth work in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15cm layers on both the banks as necessary including clearing light jungles, removing trees up to B.(i)Hard soil (Soil mixed with gravel or morum up to 50mm size)
Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measura (i)Distance of work site from quarry @ 25 Km
Carriage of boulder, gravels, metals, screening sand etc. by truck including loading, unloading and stacking in measurable stacks at site as directed complete.
Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete incl
Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materia A) River Singles (i)Without shuttering & without Dewatering
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as direc
Reinforced Cement Concrete work in proportion 1: 2: 4 with aggregate of size 6 mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying A) River Singles (i)Without shuttering & without Dewatering
Centering and shuttering including propping etc. where necessary and removal of forms after completion of C.C. and R.C.C. works complete as directed. (Measurement will be taken on the face area of timber) (a) Shuttering column , pier etc (Fitting and dismantling)
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1
Approach Road Earth work in filling in marginal bund/ Guide bund/ Afflux bund/ Canal embankment etc. in the design section and grade by obtaining earth from outside borrow pits and filling in uniform layers not exceeding 15 cm thick including clearing light jungles, removing trees up to 15cm dia and uprooting roots and stumps from the seat of the embankment and borrow pit area, breaking clods not more than 10mm cube, ramming, dressing, watering and roughening the seat of the embankment before throwing earth, profiling etc., paying compensation of earth borrowed from private land or forest land if any, lead up to 30m and lift up to 1.5m, complete as directed. B.(i)Hard soil (Soil mixed with gravel or morum up to 50mm size)
Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed by the department (Including paying of forest royalty and sales tax etc.) (i)Distance of work site from quarry @ 25 Km
Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc.
Kamrup Enterprise
PANIRAM BARO
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .