Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.0 LAccepted-AOC RZ 17B STREET NO 30 INDIRA PARK PALAM COLONY NEW DELHI 110045 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110045 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹48.6 L+₹11.6 L (31.4%)Rejected-Finance 87 248 ACHARYA NAGAR KANPUR 03 UP | KANPUR | KANPUR | UTTAR PRADESH | 208003 | L2 | Rejected-Finance Being other than lowest |
| Sl No | Description | Qty | Unit | M/s R.V. Constructions L2 | sumit associates L1 |
|---|---|---|---|---|---|
| 1.00 | Design, fabrication, supply, erection, testing & commissioning of single-stage Venturi wet-scrubber line fume extraction system of capacity 9000 CMH, ready for operation and fully compliant with CPCB “Emission Regulations – Part II” and IS 11255-2 with all components
a)Venturi scrubber bodies – vinyl-ester FRP shell 6 mm with PP-lined throat (300 mm), integral 300 mm PP demister, 300 mm manway, 40 mm PP drain & overflow, three PP/PVDF full-cone spray nozzles per unit.
b)Chemical-resistant centrifugal blowers – FRP casing & backward-curved wheel, ANSI 150 PP-lined flanges; duty 9 000 m³ h⁻¹ @ 200 mm WC; 15 kW IE2 TEFC motors, star-delta starters; inlet flexible sleeves, dynamic balance ISO 1940 Gr 6.3.
c)Self-supported FRP exhaust stacks – Ø 400 mm × 12 m, 6 mm FRP shell with UV gelcoat, first 1 m PP-lined, base flange drilled to IS 1537, earthing lug included. | 4 | Each | 6,30,000 ₹25,20,000 | 5,60,000 ₹22,40,000 Lowest |
| 1.01d)Recirculation system –HDPE tanks 1 000 L (8 mm wall) with vented manways, PP bottom outlets & overflow; two horizontal PP pumps 2 m³/h @ 12 m head, 1.5 kW TEFC IP55 motors, SiC/Carbon seals; 40 mm PP piping with quick-release unions. e)Skids & supports – ISMC-100 hot-dip-galvanised MS frames, neoprene vibration pads, anchor bolts; SS 304 fasteners and PTFE gaskets throughout. f)Basic instrumentation – one Magnehelic DP gauge (0–250 mm WC, IP55) per scrubber; handheld pH meter/strips; 415 V rotary isolators at each blower. g)Factory tests – hydrostatic 1 bar/15 min, blower run test (flow & ΔP ±10 %), laminate visual per ASTM D5163. h)Site works & documentation – assembly, alignment, leak sealing, 4 h trial run (flow/ΔP/pH logging), GA drawing 1:25, single-line utility diagram, laminate & motor certificates, concise O&M manual, 3 times operator training of total 8 hours, spares kit (nozzles, gaskets, pump seal). Note: Drawings are to be submitted for approval of Engineer-in-charge before fabrication. | |||||
| 2.00 | Design, fabrication, supply, erection, testing & commissioning of single-stage Venturi wet-scrubber line fume extraction system of capacity 5000 CMH, ready for operation and fully compliant with CPCB “Emission Regulations – Part II” and IS 11255-2 with all components
a)Venturi scrubber bodies – 6 mm vinyl-ester FRP shell with PP-lined throat (250 mm), 250 mm PP demister pad, 250 mm gasketed manway, 40 mm PP drain & overflow, two PP/PVDF full-cone spray nozzles per scrubber.
b)Chemical-resistant centrifugal blowers – FRP casing & backward-curved wheel, ANSI-150 PP-lined flanges; duty 5 000 m³ h⁻¹ @ 200 mm WC; 7.5 kW IE2 TEFC motors, star-delta starters; inlet flexible sleeves; ISO 1940 Gr 6.3 balance.
c)Self-supported FRP exhaust stacks – Ø 300 mm × 12 m, 6 mm FRP shell with UV gel-coat, first 1 m PP-lined, base flange drilled to IS 1537, earthing lug provided. | 2 | Each | 5,40,000 ₹10,80,000 | 5,10,000 ₹10,20,000 Lowest |
| 2.01d)Recirculation system –HDPE tanks 1 000 L (8 mm wall) with vented manways, PP bottom outlets & overflow; two horizontal PP pumps 1 m³/h @ 12 m head, 1.1 kW TEFC IP55 motors, SiC/Carbon seals; 40 mm PP piping with quick-release unions e)Skids & supports – ISMC-100 hot-dip-galvanised MS frames with neoprene vibration pads; SS 304 fasteners and PTFE gaskets throughout. f)Basic instrumentation – one Magnehelic DP gauge (0–250 mm WC, IP55) per scrubber; handheld pH meter/strips; 415 V rotary isolators at each blower. g)Factory tests – hydrostatic 1 bar/15 min, blower run test (flow & ΔP ± 10 %), laminate visual per ASTM D5163. h)Site works & documentation – assembly, alignment, leak sealing, 4 h trial run (flow/ΔP/pH logging), GA drawing 1:25, single-line utility diagram, laminate & motor certificates, concise O&M manual, 3 times operator training of total 8 hours, spares kit (nozzles, gaskets, pump seal). Note: Drawings are to be submitted for approval of Engineer-in-charge before fabrication.. | |||||
| 3.00 | FRP/PP Ducting system:Supply, fabrication, installation, testing & commissioning of corrosion-resistant FRP duct network for fume-extraction plant as per specifications
a. Standards & duty – Thermoset FRP duct to SMACNA PS-15-69, pressure class ≤ 500 Pa; design velocity 10–15 m s⁻¹; leakage Class B at 1 500 Pa.
b. Laminate & thickness – 4 mm isophthalic-resin FRP (55 % glass) for straight sections; 5 mm for elbows/tees/reducers; UV-stabilised external gel-coat; no PP liner.
c. Joints & gaskets – mould-in 6 mm FRP stub flanges; 3 mm EPDM gaskets; galvanised MS M10 bolts @ 150 mm c/c; butt joints over-laid with two 100 mm FRP bands (hand-lay-up). | 250 | Sqm | 3,600 ₹9,00,000 | 590 ₹1,47,500 Lowest |
| 3.01d. Access & drainage – 250 × 250 mm FRP bolted access doors every 4 m; duct pitched 1 : 100 to low-point PVC drain with ball valve per branch. e. Supports – GI saddle rings with 6 mm neoprene strip @ ≤ 2 m spacing; M12 galvanised suspension rods/cleats; stainless fasteners where outdoors. f. Testing- site smoke-pen leak check during commissioning. g. Inclusions – all anchors, sealants, scaffolding and required sub parts to ensure fitment and sealing, Note: developed surface area of straight runs shall be measured and fittings for bends and turns are deemed included. | |||||
| 4.00 | Design, manufacture, factory testing, supply, installation, inter-cabling, commissioning & handing-over of a floor-mounted IP-54 Motor Control panel for four 15 kW and two 7.5 kW scrubber-blower drives, complete in all respects, inclusive of:
a) 250 A, 4-pole MCCB incomer with rotary operating handle and door interlock; 500 A Cu busbars (40 × 6 mm) with heat-shrink sleeves; dual earth bus.
b)4 Star–Delta starters 15 kW &2 Star–Delta starters 7.5 kW, each comprising MCCB, main/star/delta contactors, timer relay, adjustable thermal overload relay, auxiliary contacts, mechanical & electrical interlocks, phase-failure relay, start/stop/reset PBs, ‘Run’ & ‘Trip’ indication lamps.
c) Metering kit: ammeter + selector + CTs for each feeder; voltmeter + selector on incomer; RYB supply lamps.
d) 2 kVA control transformer, control fuses, 110 V control wiring, clip-on terminals with 20 % spare, engraved labels.
e) CRCA enclosure 2 mm, powder-coated RAL 7035, Form-2b, bottom cable entry plate, lifting lugs, gland plates, neoprene gaskets.
f) Routine tests per IS 8623/IEC 61439. | 1 | Each | 3,60,000 ₹3,60,000 | 2,90,000 ₹2,90,000 Lowest |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
2 Dec 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE(AF) EM Chakeri
GE(AF) EM Chakeri Kanpur
Provn of Force Draught System FDS and Fume Extraction System FES of Building No P 117 at industrial facility at 4BRD at AFS Kanpur
2025_MES_739405_1
8786/E8
Open Tender
Civil Works
Item Rate
270 days
Area under GE(AF) EM Chakeri
As per tender document
8 documents required · 8 mandatory
₹500
GE(AF) EM Chakeri
₹80,000
Yes
31 Dec 2025
12 Nov 2025
6 Dec 2025
13 Nov 2025
2 Dec 2025
26 Nov 2025
Amount
Design, fabrication, supply, erection, testing & commissioning of single-stage Venturi wet-scrubber line fume extraction system of capacity 9000 CMH, ready for operation and fully compliant with CPCB “Emission Regulations – Part II” and IS 11255-2 with all components a)Venturi scrubber bodies – vinyl-ester FRP shell 6 mm with PP-lined throat (300 mm), integral 300 mm PP demister, 300 mm manway, 40 mm PP drain & overflow, three PP/PVDF full-cone spray nozzles per unit. b)Chemical-resistant centrifugal blowers – FRP casing & backward-curved wheel, ANSI 150 PP-lined flanges; duty 9 000 m³ h⁻¹ @ 200 mm WC; 15 kW IE2 TEFC motors, star-delta starters; inlet flexible sleeves, dynamic balance ISO 1940 Gr 6.3. c)Self-supported FRP exhaust stacks – Ø 400 mm × 12 m, 6 mm FRP shell with UV gelcoat, first 1 m PP-lined, base flange drilled to IS 1537, earthing lug included.
d)Recirculation system –HDPE tanks 1 000 L (8 mm wall) with vented manways, PP bottom outlets & overflow; two horizontal PP pumps 2 m³/h @ 12 m head, 1.5 kW TEFC IP55 motors, SiC/Carbon seals; 40 mm PP piping with quick-release unions. e)Skids & supports – ISMC-100 hot-dip-galvanised MS frames, neoprene vibration pads, anchor bolts; SS 304 fasteners and PTFE gaskets throughout. f)Basic instrumentation – one Magnehelic DP gauge (0–250 mm WC, IP55) per scrubber; handheld pH meter/strips; 415 V rotary isolators at each blower. g)Factory tests – hydrostatic 1 bar/15 min, blower run test (flow & ΔP ±10 %), laminate visual per ASTM D5163. h)Site works & documentation – assembly, alignment, leak sealing, 4 h trial run (flow/ΔP/pH logging), GA drawing 1:25, single-line utility diagram, laminate & motor certificates, concise O&M manual, 3 times operator training of total 8 hours, spares kit (nozzles, gaskets, pump seal). Note: Drawings are to be submitted for approval of Engineer-in-charge before fabrication.
Design, fabrication, supply, erection, testing & commissioning of single-stage Venturi wet-scrubber line fume extraction system of capacity 5000 CMH, ready for operation and fully compliant with CPCB “Emission Regulations – Part II” and IS 11255-2 with all components a)Venturi scrubber bodies – 6 mm vinyl-ester FRP shell with PP-lined throat (250 mm), 250 mm PP demister pad, 250 mm gasketed manway, 40 mm PP drain & overflow, two PP/PVDF full-cone spray nozzles per scrubber. b)Chemical-resistant centrifugal blowers – FRP casing & backward-curved wheel, ANSI-150 PP-lined flanges; duty 5 000 m³ h⁻¹ @ 200 mm WC; 7.5 kW IE2 TEFC motors, star-delta starters; inlet flexible sleeves; ISO 1940 Gr 6.3 balance. c)Self-supported FRP exhaust stacks – Ø 300 mm × 12 m, 6 mm FRP shell with UV gel-coat, first 1 m PP-lined, base flange drilled to IS 1537, earthing lug provided.
d)Recirculation system –HDPE tanks 1 000 L (8 mm wall) with vented manways, PP bottom outlets & overflow; two horizontal PP pumps 1 m³/h @ 12 m head, 1.1 kW TEFC IP55 motors, SiC/Carbon seals; 40 mm PP piping with quick-release unions e)Skids & supports – ISMC-100 hot-dip-galvanised MS frames with neoprene vibration pads; SS 304 fasteners and PTFE gaskets throughout. f)Basic instrumentation – one Magnehelic DP gauge (0–250 mm WC, IP55) per scrubber; handheld pH meter/strips; 415 V rotary isolators at each blower. g)Factory tests – hydrostatic 1 bar/15 min, blower run test (flow & ΔP ± 10 %), laminate visual per ASTM D5163. h)Site works & documentation – assembly, alignment, leak sealing, 4 h trial run (flow/ΔP/pH logging), GA drawing 1:25, single-line utility diagram, laminate & motor certificates, concise O&M manual, 3 times operator training of total 8 hours, spares kit (nozzles, gaskets, pump seal). Note: Drawings are to be submitted for approval of Engineer-in-charge before fabrication..
FRP/PP Ducting system:Supply, fabrication, installation, testing & commissioning of corrosion-resistant FRP duct network for fume-extraction plant as per specifications a. Standards & duty – Thermoset FRP duct to SMACNA PS-15-69, pressure class ≤ 500 Pa; design velocity 10–15 m s⁻¹; leakage Class B at 1 500 Pa. b. Laminate & thickness – 4 mm isophthalic-resin FRP (55 % glass) for straight sections; 5 mm for elbows/tees/reducers; UV-stabilised external gel-coat; no PP liner. c. Joints & gaskets – mould-in 6 mm FRP stub flanges; 3 mm EPDM gaskets; galvanised MS M10 bolts @ 150 mm c/c; butt joints over-laid with two 100 mm FRP bands (hand-lay-up).
d. Access & drainage – 250 × 250 mm FRP bolted access doors every 4 m; duct pitched 1 : 100 to low-point PVC drain with ball valve per branch. e. Supports – GI saddle rings with 6 mm neoprene strip @ ≤ 2 m spacing; M12 galvanised suspension rods/cleats; stainless fasteners where outdoors. f. Testing- site smoke-pen leak check during commissioning. g. Inclusions – all anchors, sealants, scaffolding and required sub parts to ensure fitment and sealing, Note: developed surface area of straight runs shall be measured and fittings for bends and turns are deemed included.
M/s R.V. Constructions (BID ID -3491198)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
8786E8_Tender_1.pdf
Tender Documents • 0.75 MB
Tender_Acceptance_Letter.pdf
Additional Documents • 0.08 MB
Workdetails.pdf
Additional Documents • 0.09 MB
BOQ_827939.xls
BOQ • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .