| 1 | L1₹19.9 LAccepted-AOC KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹20.2 L+₹31,518.89 (1.59%)Rejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹21.2 L+₹1.3 L (6.46%)Rejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance TC recommendation |
Tender Value
₹19.9 L
EMD Value
₹24,900
Closing Date
4 Feb 2023, 10:00 amClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation and commissioning of 1 no 1200 mm width X 180 mtr length belt conveyor at 2EL 9D to 2EL/15D belt of Shyamsundarpur colliery under Bankola Area.
2023_ECL_268963_1
ECL/GM/BA/E TENDER/22-23/Enm/118 Dt. 24.01.2023
Open Tender
Electrical and Maintenance Works
Item Rate
90 days
Shyamsundarpur colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹24,900
1 May 2023
25 Jan 2023
6 Feb 2023
25 Jan 2023
4 Feb 2023
25 Jan 2023
25 Jan 2023 - 30 Jan 2023
Amount
Item Description/ Heading
Transportation & installation of complete 1200 mm drive with gear motor& base frame 14MT + discharge unit 2.75 MT + loop take up with tenssion trolley drum 3.6MT + fixed unit with drum 1MT +load table 01 nos =1MT +tailend 1MT +1200 mm wide conveyor structure with top bottom roller & foot stool 180 mtr 80kg /mtr =14.4MT + starter 1.5 MT+Tail end shifting-1MT+ load table shifting-1Mt, total weight =45.85MT
Making load table 02 nos
Fitting of tail end and discharge skapper
Belt laying including transportation of belt jointing tenssioning trail run etc
Providing bolts and nut for fitting of above structure 180mtr 1.5Kg /mtr =270kg load table discharge & bend pulley loop take up 25 kg =295 kg
Foundation bolting for drive unit 38 nos + discharge unit 24 nos + loop take with fixed unit 36 + tail end (8x1)-nos total =106 nos
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding gas cutting etc considering cost of consumbles
Cost of fastner 6 pkts
Cleaning coal and unused materials & laveling the floor before installation of drive unit base discharge unit base loop take up tail end
Fencing of drive & tail end etc
Drive base frame, discharge base & loop take up cement concrete
Total impact of GST for the purpose of CTC
NANDI ENTERPRISE
SABIR CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .