Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4509.5 CrAdmitted-Finance S 2 TECHNOCRAT INDUSTRIAL ESTATE BALANAGAR HYDERABAD 500 037 TELANGANA INDIA | HYDERABAD | HYDERABAD | TELANGANA | 500037 | ₹4509.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹4969 CrAdmitted-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹4969 Cr | L2 | Admitted-Finance |
| 3 | L3₹6999.9 CrAdmitted-Finance | ₹6999.9 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MEGHA ENGINEERING AND INFRASTRUCTURES LIMITED L1 | IRCON APCO JV L3 | Larsen and Toubro Limited L2 |
|---|---|---|---|---|---|---|
| 1.00 | Connecting road from Z-Morh Tunnel to Zojila Tunnel as detailed in Schedule-B (Part 1) | 1 | Lump Sum | 18,99,00,00,000 ₹1899 Cr | 19,99,98,00,000 ₹2000.0 Cr | 14,52,09,87,163 ₹1452.1 Cr |
| 2.00 | 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 as detailed in Schedule-B (Part 2)
(Project Length = 14.310 km) | 1 | Lump Sum | 26,10,50,00,000 ₹2610.5 Cr | 49,99,95,00,000 ₹4999.9 Cr | 35,16,90,12,837 ₹3516.9 Cr |
Tender Value
₹4429.8 Cr
Closing Date
30 Jul 2020, 11:00 amClosed
Sanjeev Malik
NHIDCL, 3rd Floor, PTI Building, 4-Parliament Street, New Delhi-110001, India
Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of Jand K and Ladakh
2020_NHIDC_564017_1
NHIDCL/JnK-Ladakh/ Zojila/NH-01/2020
Open Tender
Civil Works
912 days
Jammu and Kashmir and Ladakh
Please refer Tender documents.
4 documents required · 4 mandatory
₹5.2 L
MDNHIDCL
Exempted
NHIDCL HQ
21 Aug 2020
10 Jun 2020
31 Jul 2020
10 Jun 2020
30 Jul 2020
15 Jul 2020
10 Jun 2020 - 3 Jul 2020
3 Jul 2020
Amount
Connecting road from Z-Morh Tunnel to Zojila Tunnel as detailed in Schedule-B (Part 1)
14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 as detailed in Schedule-B (Part 2) (Project Length = 14.310 km)
Larsen and Toubro Limited
IRCON APCO JV
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid