| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹97.1 LAccepted-Finance SBI MIRZAPUR SBI MAIN BRANCH 1ST FLOOR DUNKELNGANJ MIRZAPUR 231001 | MIRZAPUR | MIRZAPUR | UTTAR PRADESH | 231001 | ₹97.1 L | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹1.1 CrRejected-Finance | ₹1.1 Cr | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹1.1 CrRejected-Finance | ₹1.1 Cr | L-3 | Rejected-Finance L-3 |
| 4 | Not Admitted-Fee/PreQual/Technical BHADOHI | UTTAR PRADESH | 221301 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S LALMANI MAURYA L2 | M/S RAMPYARE SINGH L3 | MS SHREYA CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Ordianary Jungle Clearance where growth is continous .(Only where the growth continous ) | 3,264 | M2 | 2.5 ₹8,160 | 2 ₹6,528 Lowest | 2.1 ₹6,854.4 |
| 2.00 | Excavating Lime stone, sand stone or other soft rock by pick axe but not required blasting including all lead & lift ,and all cost of material ,labour charges, T&P, required for proper completion of work. As per direction of Engineer-in- charge. | 1,471.2 | M3 | 160 ₹2,35,392 | 150 ₹2,20,680 Lowest | 160 ₹2,35,392 |
| 3.00 | Centering and shuttering for concrete work required for proper completion of work | 1,688.76 | M2 | 150 ₹2,53,314 Lowest | 200 ₹3,37,752 | 160 ₹2,70,201.6 |
| 4.00 | Providing and laying Plain Cement concrete 1:3:6 in foundation with crust stone ballast size 20 to 40 mm and course sand. including all cost of material labour and T&P etc complete. | 399.83 | M3 | 4,110 ₹16,43,301.3 | 4,100 ₹16,39,303 | 3,800 ₹15,19,354 Lowest |
| 5.00 | Providing and laying Coursed/Khanda Stone masonry in cement mortar 1:3 (All faces shall be squared by hammer dressing) in with coarse sand including cost of all material, labour and T&P etc complete. | 1,695.1 | M3 | 3,760 ₹63,73,576 | 3,750 ₹63,56,625 | 3,700 ₹62,71,870 Lowest |
| 6.00 | Providing and Laying cement concrete 1:2:4 (M-15) with cement, coarse sand of F.M. more than 2.00 and crushed hard stone grit size 4.75 mm to 20 mm including cost of material, labour, T&P etc. required for proper completion of work. | 69.65 | M3 | 6,000 ₹4,17,900 | 6,100 ₹4,24,865 | 5,000 ₹3,48,250 Lowest |
| 7.00 | Providing and Laying cement concrete 1:1.5:3 (M-20) with cement, coarse sand of F.M. more than 2.00 and crushed hard stone grit size 4.75 mm to 20 mm including cost of material, labour, T&P etc. required for proper completion of work. | 43.14 | M3 | 6,850 ₹2,95,509 | 6,800 ₹2,93,352 | 5,900 ₹2,54,526 Lowest |
| 8.00 | Deep struck pointing in 1:2 cement on brick with coarse sand including cost of material, labour and T&P etc complete. | 6,034.6 | M² | 180 ₹10,86,228 | 200 ₹12,06,920 | 100 ₹6,03,460 Lowest |
| 9.00 | Earth work in filling in foundation/Embankment with proper compaction including all lead and lift ,labour charges,T&P etc.required and its disposal as per direction of Engineer-in-charge. | 1,304.1 | M3 | 180 ₹2,34,738 | 200 ₹2,60,820 | 150 ₹1,95,615 Lowest |
| 10.00 | Providing and laying sealing compound in groove size (15 x 35 mm) with sealing compound including face painting by sealing primer @ 0.25 ltr./sqm including cost of all materials, labour, T&P etc. required for proper completion of work. | 99.2 | RM | 40 ₹3,968 Lowest | 45 ₹4,464 | 55 ₹5,456 |
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
14 Jul 2026, 2:00 pmClosed
S.E. B.S.C.C.C.-2, Mzp
Office of Superintending Engineer, Bansagar Canal Construction Circle-2 Mirzapur
Construction of Linning of Virohiya Escape in between km 0.00 to km 0.150 situated at km 51.080 of Meja Jirgo Link Canal.
2026_UPIDC_1165786_2
02/SE/2026-27
Open Tender
Civil Works
Item Rate
240 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹2.3 L
17 Aug 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
14 Jul 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ordianary Jungle Clearance where growth is continous .(Only where the growth continous ) | 3,264 | M2 | - | - |
| 2 | Excavating Lime stone, sand stone or other soft rock by pick axe but not required blasting including all lead & lift ,and all cost of material ,labour charges, T&P, required for proper completion of work. As per direction of Engineer-in- charge. | 1,471.2 | M3 | - | - |
| 3 | Centering and shuttering for concrete work required for proper completion of work | 1,688.76 | M2 | - | - |
| 4 | Providing and laying Plain Cement concrete 1:3:6 in foundation with crust stone ballast size 20 to 40 mm and course sand. including all cost of material labour and T&P etc complete. | 399.83 | M3 | - | - |
| 5 | Providing and laying Coursed/Khanda Stone masonry in cement mortar 1:3 (All faces shall be squared by hammer dressing) in with coarse sand including cost of all material, labour and T&P etc complete. | 1,695.1 | M3 | - | - |
| 6 | Providing and Laying cement concrete 1:2:4 (M-15) with cement, coarse sand of F.M. more than 2.00 and crushed hard stone grit size 4.75 mm to 20 mm including cost of material, labour, T&P etc. required for proper completion of work. | 69.65 | M3 | - | - |
| 7 | Providing and Laying cement concrete 1:1.5:3 (M-20) with cement, coarse sand of F.M. more than 2.00 and crushed hard stone grit size 4.75 mm to 20 mm including cost of material, labour, T&P etc. required for proper completion of work. | 43.14 | M3 | - | - |
| 8 | Deep struck pointing in 1:2 cement on brick with coarse sand including cost of material, labour and T&P etc complete. | 6,034.6 | M² | - | - |
| 9 | Earth work in filling in foundation/Embankment with proper compaction including all lead and lift ,labour charges,T&P etc.required and its disposal as per direction of Engineer-in-charge. | 1,304.1 | M3 | - | - |
| 10 | Providing and laying sealing compound in groove size (15 x 35 mm) with sealing compound including face painting by sealing primer @ 0.25 ltr./sqm including cost of all materials, labour, T&P etc. required for proper completion of work. | 99.2 | RM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Tender_Document_02_SE_2026-27_Lot_2.pdf
Tender Documents • 4.34 MB
BOQ_2186491.xls
BOQ • 5.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].