Tender Value
₹1.8 L
EMD Value
₹3,500
Closing Date
29 Jul 2026, 6:55 pm3d left
EXECUTIVE ENGINEER PWD RB DIVISION MENDHAR
EXECUTIVE ENGINEER PWD RB DIVISION MENDHAR
Please refer to BOQ
2026_PWDJK_315560_3
e-NIT No 25 of 2026-27 Dated 11-07-2026
Open Tender
Civil Works
Percentage
90 days
MENDHAR
Please refer to Technical Bid as per conditions of e-NIT.
2 documents required · 2 mandatory
₹200
Sub Treasurey Mendhar
₹3,500
29 Jul 2026
11 Jul 2026
30 Jul 2026
11 Jul 2026
29 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 4.8 | Cum | 256.85 | ₹1,232.37 |
| 2 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size). | 0.52 | Cum | 4,826.5 | ₹2,509.78 |
| 3 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). | 3.2 | Cum | 5,733.6 | ₹18,347.52 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in oundation and plinth including curing in :Cement lime mortar 1:1:6 ( 1 cement : 1 lime putty : 6 coarse sand) Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 3.1 | cum | 9,027.2 | ₹27,984.32 |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.02 | Cum | 9,821.85 | ₹10,018.29 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars | 91.8 | kg | 115.35 | ₹10,589.13 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 28.98 | sqm | 286.35 | ₹8,298.42 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platforms. | 5.66 | sqm | 718.2 | ₹4,065.01 |
| 9 | Centering and shuttering including strutting, propping etcEdges of slabs and breaks in floors and walls Under 20 cm wide. | 15.84 | Mtr | 262.2 | ₹4,153.25 |
| 10 | 6MM CEMENT PLASTER
6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand) | 4.83 | sqm | 241.25 | ₹1,165.24 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_1024214.xls
BOQ • 0.28 MB
corri25.pdf
PDF • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].