Loading…
Loading…
Tender Value
₹34.0 L
EMD Value
₹68,000
Closing Date
19 Sept 2026, 6:00 pm4d left
GE Alwar
Alwar
SPECIAL REPAIR/REPLACEMENT OF OLD UNSERVICEABLE/RUSTED PVC PIPELINE AND ASSOCIATED WORKS AT ENVIRONMENT PARK, MILITARY STATION ALWAR UNDER GE ALWAR
2026_MES_786333_2
8555/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Alwar
As per NIT
6 documents required · 6 mandatory
₹500
GE Alwar
₹68,000
Yes
28 Aug 2026
28 Aug 2026
26 Sept 2026
28 Aug 2026
19 Sept 2026
12 Sept 2026
28 Aug 2026 - 11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating in trenches not exceeding 1.5 metre in width and not exceeding 1.5 metre in depth for foundations, laying of water supply pipes, cables and other associated services, including setting out, excavation in soft/loose soil, dressing of sides and bottom, getting out excavated soil and all incidental operations, complete all as specified and directed. | 820.13 | Cum | - | - |
| 2 | Returning, filling in excavated trenches, including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in soft/loose soil, complete all as specified and directed. | 697.11 | Cum | - | - |
| 3 | Removal of excavated soil/material to a distance not exceeding 50 metre and depositing where directed at a level not exceeding 1.50 metre above the starting point, including loading, unloading, spreading and leveling, complete all as specified and directed. | 123.02 | Cum | - | - |
| 4 | Taking up/down PVC tubing and connections of 25 mm bore, fixed in walls, ceilings, floors, trenches and other locations, including dismantling of supports/fittings, handling and stacking of recovered material as directed, complete all as specified and directed.
Note: Excavation and earthwork shall be measured and paid for separately under relevant items of this Schedule. | 350 | RM | - | - |
| 5 | Taking up/down PVC tubing and connections of 40 mm bore, fixed in walls, ceilings, floors, trenches and other locations, including dismantling of supports/fittings, handling and stacking of recovered material as directed, complete all as specified and directed.
Note: Excavation and earthwork shall be measured and paid for separately under relevant items of this Schedule. | 700 | RM | - | - |
| 6 | Taking up/down PVC tubing and connections of 50 mm bore, fixed in walls, ceilings, floors, trenches and other locations, including dismantling of supports/fittings, handling and stacking of recovered material as directed, complete all as specified and directed.
Note: Excavation and earthwork shall be measured and paid for separately under relevant items of this Schedule. | 1,800 | RM | - | - |
| 7 | Taking up/down PVC tubing and connections of 80 mm bore, fixed in walls, ceilings, floors, trenches and other locations, including dismantling of supports/fittings, handling and stacking of recovered material as directed, complete all as specified and directed.
Note: Excavation and earthwork shall be measured and paid for separately under relevant items of this Schedule. | 1,200 | RM | - | - |
| 8 | M&L for galvanized steel water tubing, medium grade, 25 mm bore, conforming to relevant IS requirements, including all necessary fittings, sockets, elbows, tees, unions, reducers and other accessories, complete laid in trenches, properly aligned, jointed and tested, complete all as specified and directed.
Note: Excavation and earthwork shall be measured and paid for separately under relevant items of this Schedule. | 350 | RM | - | - |
| 9 | M&L for galvanized steel water tubing, medium grade, 40 mm bore, conforming to relevant IS requirements, including all necessary fittings, sockets, elbows, tees, unions, reducers and other accessories, complete laid in trenches, properly aligned, jointed and tested, complete all as specified and directed.
Note: Excavation and earthwork shall be measured and paid for separately under relevant items of this Schedule. | 700 | RM | - | - |
| 10 | M&L for galvanized steel water tubing, medium grade, 50 mm bore, conforming to relevant IS requirements, including all necessary fittings, sockets, elbows, tees, unions, reducers and other accessories, complete laid in trenches, properly aligned, jointed and tested, complete all as specified and directed.
Note: Excavation and earthwork shall be measured and paid for separately under relevant items of this Schedule. | 1,800 | RM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_881631.xls
BOQ • 1.35 MB
Tender8555.pdf
Tender Documents • 0.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .