| 1 | L1₹5.0 LAccepted-Finance | ₹5.0 L | L1 | Accepted-Finance Approved |
| 2 | L2₹5.1 LRejected-Finance | ₹5.1 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | K Rajendhiran L2 | KALIYAPERUMAL KASINATHAN L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary
soil complete | 32.1 | M3 | 285.1 ₹9,151.71 | 263.78 ₹8,467.34 |
| 2.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15
cm thick well watered, rammed and consolidated etc. complete complying with standard specification
and as directed by the departmental officers | 3 | M3 | 2,133.1 ₹6,399.30 | 2,133.1 ₹6,399.30 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm
gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and | 3 | M3 | 5,901.75 ₹17,705.25 | 5,901.75 ₹17,705.25 |
| 4.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:3 (One cement and
three M.Sand) including curing neat finishing, etc., complete complying with standard specifictione | 2.35 | M3 | 6,241.24 ₹14,666.91 | 6,241.24 ₹14,666.91 |
| 5.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:3 (One cement and
three M.Sand) including curing neat finishing, etc., complete complying with standard specifiction | 4.28 | M3 | 6,334.11 ₹27,109.99 | 6,334.11 ₹27,109.99 |
| 6.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard
broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works
excluding cost of reinforcement grill and fabricating charges centering and shuttering but including
laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan
clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc.
shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper | 10.48 | SQM | 9,660 ₹1.0 L | 9,660 ₹1.0 L |
| 7.00 | Sand and filling in to the basement including cost and conveyance to
the site and all labour charges for filling as per standard specifications | 1.03 | M3 | 9,801.23 ₹10,095.27 | 9,801.23 ₹10,095.27 |
| 8.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing,
laying and curing etc complete | 29.98 | M3 | 564.1 ₹16,911.72 | 547.5 ₹16,414.05 |
| 9.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto
3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild
Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x
25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm
centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm
centre to centre etc. complete complying | 17.94 | M3 | 1,095 ₹19,644.30 | 1,095 ₹19,644.30 |
| 10.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works
as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying
with standard specification. (Contractor has to make his own arrangements for the supply of steel
and binding wire) | 0.76 | M3 | 91,995.1 ₹69,916.28 | 91,995.1 ₹69,916.28 |
Tender Value
₹64,500
EMD Value
₹6,450
Closing Date
2 Mar 2026, 10:00 amClosed
BDO (VP)
Block Development office Cuddalore
Construction of compound wall with gate arrangement. Name board (SS Lettering) and providing paver block road in existing Panchayat Union Middle School Edayarkuppam in C.N.PalayamPanchayat
2026_RDTN_668448_2
B2/0420/2026-Mince
Open Tender
Civil Works - Others
30 days
Block Development office Cuddalore
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,450
Yes
5 Jun 2026
28 Feb 2026
2 Mar 2026
28 Feb 2026
2 Mar 2026
28 Feb 2026
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:3 (One cement and three M.Sand) including curing neat finishing, etc., complete complying with standard specifictione
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:3 (One cement and three M.Sand) including curing neat finishing, etc., complete complying with standard specifiction
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper
Sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying
Name Board(S.S. Lettering)
Gate Arrangement
Paver Block
Provision for cartoon Drawing
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_803219.xls
BOQ • 0.35 MB
2CNpalayamdoc.pdf
Tender Documents • 0.08 MB
Download all tender documents and submit your bid