Tender Value
₹22.0 L
EMD Value
₹40,542
Closing Date
28 Nov 2023, 5:00 pmClosed
Executive Engineer Jal Shakti Divn No.1 Una HP
Executive Engineer Jal Shakti Divn No.1 Una HP
Providing Storm water drainage to Una Town under State Disaster Mitigation Fund. (SHSurvey investigation and preparation of DPR for storm water drainage system at Santokhgarh Town and adjoining area)
2023_HPIPH_81644_1
No. JSV-1/TA/ E-tender/23- 16534-63 dt 20-11-2023
Open Tender
Civil Works
Item Rate
30 days
Santokhgarh Town
as per NIT
10 documents required · 10 mandatory
₹400
Yes
Executive Engineer Jal Shakti Divn No.1 Una HP
₹40,542
Yes
4 Dec 2023
20 Nov 2023
29 Nov 2023
20 Nov 2023
28 Nov 2023
20 Nov 2023
20 Nov 2023 - 28 Nov 2023
Amount
Drone Survey
Mobilisation & Demobilisation of Survey team and equipment to and from site.
Marking of TBMs/GCPs with DGPS (reference bench mark approved by the engineer-in-charge) at site/sites under survey by parallel leveling, establishing bench mark, grid and reference points in the field complete as per the directon of the Engineer-in-charge.
To conduct aerial surveys using drone visual camera & software analytics and prepare high definition video reports and 2D/3D maps. Prepare Ortho mosaic map in jpeg format (resolution upto 5 cm), Digital Terrain Model (DTM) and Digital surface model (DSM)in GeoTIFF or ESRI ASCII complete as per the directon of the Engineer-in-charge.
Detailed Project Report
Collection of relevant information for the subject property and surrounding area. This includes site area maps and identification of land-use complete as per the directon of the Engineer-in-charge.
Analysis of rainfall data gathered from nearby gauge station or satellite based TRMM data to ascertain flood conditions at site and nearby area (flow rate, frequency, duration). The intensity, frequency and duration of the extreme rainfall shall be defined in accordance with the applicable standard. If not specified in the applicable standard, a minimum return period of 100 years shall be applied, which could be reduced under justification complete as per the directon of the Engineer-in-charge.
Visual survey of the entire drainage area as identified from the maps and data collected complete as per the directon of the Engineer-in-charge.
A review of readily available records and documents on hydrology of the area, to assist in determining surface water drainage patterns for the subject property and adjacent areas complete as per the directon of the Engineer-in-charge.
To establish catchment characteristics such as run-off and natural stream network as established using leading software such as QGIS, HEC RAS, HEC-HMS and Civil 3D. These characteristics shall be further scrutinised for flood analysis and suitable drainage design complete as per the directon of the Engineer-in-charge.
The hydrology analysis to derive flood peak hydrographs and frequency analysis to identify the magnitude of extreme storm events for the return periods specified complete as per the directon of the Engineer-in-charge.
Based on the parameters such as rainfall intensity, run-off, catchment area, run-off coefficient, existing soil condition, drain out fall location etc. derived from hydrology study, to suggest the plant layout and designs for storm water drains and culverts complete as per the directon of the Engineer-in-charge.
Analyzing the data and submitting an engineering report, furnishing recommendations for the design and construction of internal drainage structures or other preventive measures at the site; calculation notes of the drainage system (flow rates, storage volumes, and dimensions) and Erosion protection measures. All details shall be provided to the client with studies of the areas mentioned in the present document and shown on the KMZ file of the site complete as per the directon of the Engineer-in-charge.
Preperation of Detailed project report from above data and design including proposed strom water drain network with detailed calculations and design. The drawing shall be prepared with AUTOCAD and 06 (six) copies of DPR neatly winded shall be supplied in hard & 01 ( one ) copy in soft format; complete in all respect as per directions of Engineer in Charge
SUBHASH ANITA and ASSOCIATES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .