Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 CrAccepted-Finance HEAD OFFICE 414 RAJIV VIAHR NEAR VASANT VIHAR BILASPUR BILASPUR CHHATTISGARH 495006 | BILASPUR | CHHATTISGARH | 495006 | ₹7.2 Cr | L1 | Accepted-Finance LOWEST |
| 2 | L2₹7.2 Cr+₹4.9 L (0.68%)Rejected-Finance | ₹7.2 Cr+₹4.9 L (0.68%) | L2 | Rejected-Finance SECOND LOWEST |
| 3 | L3₹7.3 Cr+₹18.7 L (2.62%)Rejected-Finance 55 ARCHANABAD NAVEEN NAGAR ASHIBAAAG SIKANDRI SARAI BHOPAL DISTT BHOPAL | BHOPAL | BHOPAL | MADHYA PRADESH | ₹7.3 Cr+₹18.7 L (2.62%) | L3 | Rejected-Finance THIRD LOWEST |
| 4 | L4₹7.5 Cr+₹30.1 L (4.21%)Rejected-Finance | ₹7.5 Cr+₹30.1 L (4.21%) | L4 | Rejected-Finance FOURTH LOWEST |
| 5 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹7.5 Cr
EMD Value
₹3.8 L
Closing Date
5 Sept 2024, 5:30 pmClosed
CMO
NAGAR PARISHAD ARON
Interception AND Diversion of Nallahs with STP works ProjectofARON town under SBM 2.0
2024_UAD_362181_1
NIT NO 1895 DATED 06/08/2024
Open Tender
Civil Works - Others
Lump-sum
365 days
ARON
Please refer Tender documents.
8 documents required · 8 mandatory
₹20,000
₹3.8 L
17 Dec 2024
6 Aug 2024
6 Sept 2024
6 Aug 2024
5 Sept 2024
6 Aug 2024
Amount
INTERCEPTION & DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR ARON TOWN 1. Design and build sewage treatment plant of installed capacity 1.5,0.5 MLD and all appurtenant structures and allied works 2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 1.549 Km length including survey, design, construction of 2 No. of Pumping stations and all appurtenant structures and allied works 3. Operation & maintenance of the complete works of sewage treatment plant, Intercepting sewer and/or interception & diversion works of Nallahs and pumping stations for a period of 05 years after completion of works, including defect liability period (DLP) of 5 year, starting from the date of commission of the project
INTERCEPTION & DIVERSION WORK FOR TAPPING NALLAH AND SETUP SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR ARON TOWN 1. Design and build sewage treatment plant of installed capacity 1.5,0.5 MLD and all appurtenant structures and allied works 2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 1.549 Km length including survey, design, construction of 2 No. of Pumping stations and all appurtenant structures and allied works 3. Operation & maintenance of the complete works of sewage treatment plant, Intercepting sewer and/or interception & diversion works of Nallahs and pumping stations for a period of 05 years after completion of works, including defect liability period (DLP) of 5 year, starting from the date of commission of the project
MAHAVEER CHEM (BID ID -1092488)
sagar construction (BID ID -1091742)
M/s Sourabh Constructions Pvt. Ltd. (BID ID -1092268)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .