Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹50.5 L
EMD Value
₹50,500
Closing Date
26 May 2022, 2:00 pmClosed
Superintending Engineer TEDC Tuticorin
131,132, Ettayapuram Road, Tuticorin.
Execution of works under RDSS scheme for Agriculture Feeder Segregation (FY 2022 -2023) in 11KV Ittamozhi feeder of 110/33-11KV Sathankulam SS in Rural / Sathankulam section of Tiruchendur division of Tuticorin Electricity Distribution Circle
2022_EB_233147_1
WC-005/2022-2023 ITTAMOZHI FEEDER R/STKM
Open Tender
Electrical Works
Item Rate
120 days
Tuticorin
Refer Tender Document
2 documents required · 2 mandatory
₹0
₹50,500
Yes
4 Jun 2022
20 May 2022
27 May 2022
20 May 2022
26 May 2022
20 May 2022
20 May 2022 - 26 May 2022
Amount
Excavation & Erection of Stay pit 4.5' to 5' depth by using JCB or manual in Rocky ground
Excavation of pole pit upto 9.14 mtr Pole by using JCB or manual in Rocky ground
Excavation of pole pit upto 9.14 mtr Pole by using JCB or manual in normal ground
Excavation of RSJ pole pit above 36' by using JCB or manual
Erection of 9 mtr PSC poles by using JCB or maual
Erection of RSJ Rail, fabricated poles above 36'-0' by using JCB or maual
Fixing of 3.6" "V" cross arms(all types) / channel cross arms/ guarding Cross arms
Fixing of LT Single phase cross arms
Fixing of HT/LT TI Fittings
Fixing of pin Insulators with Pin 11 KV
Fixing of 11 KV strain disc.
Fixing of LT pin Insulator with pin
Numbering of poles including base painting and with cost of paint
Earthing of pole with pin including burying looping and binding
Paving of Conductor, stringing, binding Jumpering etc., complete with 7/4.09ACSR for both HT/LT lines with LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with 7/4.09ACSR for both HT/LT lines without LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with 7/3.35 ACSR for both HT/LT lines with LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with 7/3.35 ACSR for both HT/LT lines without LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with7/2.59 mm ACSR for both HT/LT lines with LC work.
Sleeve Concrete for poles on the line ( All Materials including cement Ratio 1:2:4) ( 1 Loc ( 0.202 ) (0.5*0.45*0.9M)
Erection of Single Pole Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with tubs including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (Except erection of Transformer)
Erection of Single Pole Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with tubs including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (Except erection of Transformer)
Flat guarding arrangement 4wire
Transport of /Materials/ conductors and other materials from store to site ( for Hired Vehicle) upto 20KM
Loading/Unloading of poles upto 9 mtr PSC poles & RCC Square Pole from store road site
Loading/Unloading of poles upto 36 "RSJ poles from store road site
Transporting of 9.0mt poles & 9.0mt RCC Square Pole from road site to pole pit including loading and unloading of poles by using JCB or manual
Transporting of poles above 36'' RSJ polefrom road site to pole pit including loading and unloading of poles by using JCB or manual
Loading or unloading of Transformer upto 63 KVA for each
Loading or unloading of Transformer upto 25 KVA for each
Transporting of Distribtion Transformer upto 20 KM
Erection of 63 KVA New Transformer
Erection of New Transformer upto 25 KVA
Erection of D.P. structure with AB switch top channel, cross bracing, HG fuse set, earthing, painting, providing stay and pole concreting as per field Engineer's instructions.
Alteration of Back clamp
Aluminium painting including labour,materials,lead,lift etc., for all types of x arm/channel/clamps/Bolt & Nut Etc., for above works
Tree Clearance
11KV BAY EXTENSION WORKS INCLUDING MATERIALS
VCB PLINTH ERECTION WORKS
Earthwork excavating, depositing on bank with an initial lead of 10 m and lift of 2 m in medium rock and dense medium rock not requiring blasting
PCC 1:3:6 using 40 mm HBS jelly including cost of all materials, lead, lift, etc., complete without form work.
PCC 1:2:4 using 20 mm HBS jelly including cost of all materials, lead, lift, etc., complete with form work.
Plastering with CM 1:5, 12 mm thick including cost of all materials, lead, lift, curing etc., complete
Labour charges for painting the plinths Providing two coats of ready mixed Exterior Emulsion painting of approved colour & quality on outer walls over one coat of white cement primer,including cost of all materials, scaffolding charges, labours, lead, lift, etc. complete.- to be done by contractor)
Labour Charges for providing grouting pocket, placing the template for breaker foundation as per the drawing, grouting the foundation bolt as per the instruction of the site engineer including the cost of curing, T&Ps etc., complete
Labour for Erection of 33/22/11 KV breaker with own crane arrangement and connecting link rod, SF6 gas filling and other consumables including support poles cutting, jointing, providing holes and bending of pipes whereever required and as directed by the field engineer
Labour for erection of 11KV/33KV AB switches including the cost of consumables, lubricant, wiring and alignment, checking of operation and commissioning and as directed by the field engineer.
Labour for erection of LAS Distribution type single pole stack 33 KV /11KV including fabrication of base if required
Labour for erection of 33/22/11 KV Measurement Transformer using manual labour or crane own arrangement (one S Ph or 3 Ph unit ) including providing holes wherever required as directed by the field engineer.
Labour for erection of droppers and jumpers including fabrication and any modification of end clamps wherever necessary and as directed by the field engineer.
Labour for erection of Busbar including fabrication and any modification of end clamp wherever necessary and as directed by the field engineer. Using 50mm bus bar of length (without making bends)
Erection of Simplex Panel including alignment and earthing as directed by field engineer
Labour for laying of cable in duct/trunch including the cost of Alu.tag for identification.Upto 8 core
Brick work with CM 1:6 using second class brick 9”*43/8”*23/4” including cost of all materials labour, lead, lift, curing etc; complete.
Labour machinery consumable for the fabrication for steel structuresHeavy section (above 14 kg/m)
Labour machinery consumable for the fabrication for steel structuresLight section (below 14 kg/m)
Labour for the Erection of the Fabricated Steel StructuresHeavy section abovekg/m)
Labour for the Erection of the Fabricated Steel StructuresLight section(below14kg/m)
Labour, machinery, consumables for fabrication, erection of earthmat, earth connection, earth electrode, earthspike (including sharpening of earth spike). As directed by the field engineer.
Labour,consumables for first primer coat using red oxide Paint and first finish coat of Painting using Aluminium Paint of all Steel Sections as directed by the field engineer after proper surface preparation using appropriate machinery to remove rust/scales etc.
Labour, consumables fo the second Finish coat using Aluminium paint of all steel section as directed by the field Engineerrfirst primer coat using red oxide paint and first finish coat of painting using Aluminium paint of all steel section as directed by the field engineer
Fabrication supply and fixing of CT /PT junction bos size 400X 300X150 mm of 16 SWG 1.6 mm MS Sheet with primer coat paint supply fabrication and erection of box fixing flats using 50X 8 MSF supply and fixing of 25 X mm2 braided flexiable copper loops to be earth two coat of enemal paint provision for fixing terminal block MCB including consumables VAT fright etc
SUPPLY OF MATERIALS
2" Free end clamp
Switch end clamp for Zebra
Switch end clamp for Mink
Sypply of Gi bolt Nut(various size)
supply of GI washer (various sixe)
Aluminium paint
Red oxide paint
Erection of UG Cable
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .