| 1 | 1₹8.2 LAccepted-Finance | 1 | Accepted-Finance Satisfied | |
| 2 | 2₹9.0 L+₹82,260 (10.1%)Accepted-Finance M 36 HOUSING UNIT MATHAIYANKUTTAI PO METTUR DAM 636452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 2 | Accepted-Finance Satisfied |
Tender Value
Refer Docs
EMD Value
₹10,300
Closing Date
18 Feb 2021, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM AOH 2021 22 Unit I Complete overhaul of APH B and other related works
2021_EB_195691_1
SE / M-I / MTPS-I / BM / OT. 351 / 2020-21
Open Tender
Power/Energy Projects/Products
Works
25 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹10,300
Yes
24 Feb 2021
12 Feb 2021
19 Feb 2021
12 Feb 2021
18 Feb 2021
12 Feb 2021
Amount
Opening of all manhole doors, and closing manhole doors after completion of work including changing of asbestos ropes and clamps in the doors.
Removal of ash deposit around guide bearing area, and inside the APH
Charges for cutting and removing of rigid stoppers checking and correction of rotor leveling, checking and correction of critical distance between guide bearing housing and housing sleeve and fixing, welding the rigid stoppers and provide shim packing in between guide bearing housing and permanent stoppers
Charges for levelling and aligning of the radial sector plates and axial seal plates with respect to the rotor axis
Charges for removal of worn-out/damaged bypass seals (complete assembly CE & HE) fixing and positioning properly with new seals. (Including transporting of new materials from stores to site and scraps from site to Stores).
Charges for finding the high point in 'T' bar, adjusting the bypass seals to correct clearance and clamping properly in both hot and cold ends of APH
Charges for replacing of rotor post seal at hot end and cutting of sealing ring segments, cutting of tracking rod stuffing boxes, kawool packing and patch up sealing ring segments and leak arresting works around the guide bearing area and fixing of rotor post seals and rectification works on the eroded portions of spool seal assembly.
Overhaul of APH soot blower mechanism including changing the bearings, soot blowers spray nozzles, if necessary and changing of lubrication etc
Inspection of support bearing by removing the cover, drain oil, cleaning and checking level etc.
Charges for removal of worn-out radial seal in both cold end and hot end (complete assembly) and re fixing with new HT bolts & nuts and positioning. (Including transporting of new materials from Stores to site and scraps from site to stores). (Double sealing arrangement)
Charges for removal of worn-out axial seal in both cold end and hot end (complete assembly) and re fixing with new HT bolts & nuts and positioning. (Including transporting of new materials from Stores to site and scraps from site to stores). (Double sealing arrangement)
Charges for fixing up straight edge after finding the low point of sector plate, adjusting the radial seals to correct clearance and clamping the seals in both hot end and cold end of APH. (Double sealing arrangement)
Charges for fixing up straight edge after finding the low point of axial seal plate, adjusting the axial seals to correct clearance and clamping the seals properly. .
Charges for removal of existing 'T' bars, fixing old/ new 'T' bar after adjusting to correct radius and clamping properly.
Charges for removal of bypass seal fixing angle and fixing the same / new angle with correct position after rectification of the center section fixing plate.
Charges for transporting of 6mm M.S. plates from Central Stores Boiler site area, cutting into required size, leading, lifting, positioning on the eroded portions of APH housing and welding the same and transporting of scrap materials to Stores.
Charges for Reconditioning of axial seal plate to sector plate seal, Kawool retainer box, link adjuster box.
Cleaning of steam coil Air pre heater.
Charges for removing the existing eroded duct supports of APH flue gas duct area transporting of new pipes/Angles from Central Stores/MTPS, cutting into required size leading lifting, positioning and welding.
Water washing of Air pre heater.
Removal of cold end baskets from its position, leading to the adjacent area of Air Pre heaters, dry cleaning, high pressure jet water cleaning and then air cleaning of the cold end baskets, putting the heating elements after rectification of cold end diaphragm and cold end gratings.
Charges for Rectification of Hot end stationary Spool and renewing the retainer ring, Packing rings and etc.,
Providing platform and dismantling after completion of work (For renewal / rectification of pipe protection cover & the eroded twin nozzle pipe)
Fixing new protection cover for the soot blower pipe, Renewal of eroded guard pipe and Renewal of new pipe
Charges for Dismantling & cleaning the lub oil lines of Guide bearing & Support Bearings with air & steam and reassembling
Removal of accumulated ash at center section connecting plate area.
Consumables and T&Ps for S.No.1 to 26
MARSSAL ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .