Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | ₹5.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹5.1 L+₹186.09 (0.04%)Rejected-AOC | ₹5.1 L+₹186.09 (0.04%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹5.1 L+₹1,217.34 (0.24%)Rejected-AOC | ₹5.1 L+₹1,217.34 (0.24%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹5.3 L+₹22,080.01 (4.31%)Rejected-AOC | ₹5.3 L+₹22,080.01 (4.31%) | L4 | Rejected-AOC Rejected |
| 5 | L5₹5.5 L+₹37,349.02 (7.29%)Rejected-AOC | ₹5.5 L+₹37,349.02 (7.29%) | L5 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M/S. ABL CONSTRUCTIONS L7 | S D CONSTRUCTION L4 | M/S. DINESH ENTERPRISES L3 | V BHOOPATHI L5 | ranhanathan L2 | SRI RAJALAKSHMI ENTERPRISES L6 | Subramani Kumar L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of Mini CSC Toilet PUES school at Ramalingapuram in Ramapuram Panchayat | ||||||||||
| 2.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 13.17 | m3 | 260 ₹3,424.2 | 201 ₹2,647.17 | 224 ₹2,950.08 | 148 ₹1,949.16 Lowest | 229 ₹3,015.93 | 253 ₹3,332.01 | 263 ₹3,463.71 |
| 3.00 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick | 4.72 | m3 | 40 ₹188.8 Lowest | 42 ₹198.24 | 45 ₹212.4 | 1,984 ₹9,364.48 | 45 ₹212.4 | 2,002 ₹9,449.44 | 45 ₹212.4 |
| 4.00 | Cement concrete 1:4:8(one cement,Four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than | 4.2 | m3 | 5,780 ₹24,276 | 3,980 ₹16,716 Lowest | 5,978 ₹25,107.6 | 6,412 ₹26,930.4 | 4,897 ₹20,567.4 | 5,685 ₹23,877 | 5,300 ₹22,260 |
| 5.00 | Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete. | 0.53 | mt | 91,938 ₹48,727.14 | 82,000 ₹43,460 | 89,754 ₹47,569.62 | 92,145 ₹48,836.85 | 84,000 ₹44,520 | 537.5 ₹284.88 Lowest | 89,000 ₹47,170 |
| 6.00 | Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and p | 6.5 | m3 | 9,690 ₹62,985 | 6,500 ₹42,250 Lowest | 7,415 ₹48,197.5 | 7,451 ₹48,431.5 | 7,757 ₹50,420.5 | 9,415.22 ₹61,198.93 | 8,200 ₹53,300 |
| 7.00 | Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations | 10.46 | m2 | 547 ₹5,721.62 | 869 ₹9,089.74 | 1,053 ₹11,014.38 | 1,050 ₹10,983 | 516 ₹5,397.36 | 7,750.1 ₹81,066.05 | 300 ₹3,138 Lowest |
| 8.00 | Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations | 49.81 | m2 | 1,095 ₹54,541.95 | 890 ₹44,330.9 | 545 ₹27,146.45 | 525 ₹26,150.25 Lowest | 1,033 ₹51,453.73 | 3,070.51 ₹1,52,942.1 | 800 ₹39,848 |
| 9.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 20.13 | m3 | 6,198 ₹1,24,765.74 | 6,502 ₹1,30,885.26 | 5,452 ₹1,09,748.76 | 5,541 ₹1,11,540.33 | 5,700 ₹1,14,741 | 305.85 ₹6,156.76 Lowest | 5,000 ₹1,00,650 |
| 10.00 | Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works) | 15.77 | m2 | 1,613 ₹25,437.01 | 1,180 ₹18,608.6 | 1,145 ₹18,056.65 | 1,200 ₹18,924 | 1,182 ₹18,640.14 | 267.07 ₹4,211.69 Lowest | 1,580 ₹24,916.6 |
Tender Value
₹5.9 L
EMD Value
₹14,800
Closing Date
20 Jul 2026, 3:00 pmClosed
Block Development Officer Tiruvalangadu
Block Development Officer Tiruvalangadu
Construction of Mini CSC Toilet PUES school at Ramalingapuram in Ramapuram Panchayat
2026_RDTN_684181_1
676/2020/A9/Ramapuram
Open Tender
Civil Works
Item Rate
120 days
Block Development Office Tiruvalangadu
Class IV
4 documents required · 4 mandatory
₹0
₹14,800
Yes
10 Sept 2026
6 Jul 2026
20 Jul 2026
6 Jul 2026
20 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Mini CSC Toilet PUES school at Ramalingapuram in Ramapuram Panchayat | - | - | - | - |
| 2 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 13.17 | m3 | 263.78 | ₹3,473.98 |
| 3 | Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick | 4.72 | m3 | 45.85 | ₹216.41 |
| 4 | Cement concrete 1:4:8(one cement,Four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than | 4.2 | m3 | 5,788.96 | ₹24,313.63 |
| 5 | Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete. | 0.53 | mt | 91,938.4 | ₹48,727.35 |
| 6 | Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and p | 6.5 | m3 | 9,694.09 | ₹63,011.59 |
| 7 | Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations | 10.46 | m2 | 547.5 | ₹5,726.85 |
| 8 | Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations | 49.81 | m2 | 1,095 | ₹54,541.95 |
| 9 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 20.13 | m3 | 6,198.01 | ₹1,24,765.94 |
| 10 | Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works) | 15.77 | m2 | 1,613.62 | ₹25,446.79 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_822448.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
ramapuramvillage.pdf
Tender Documents • 1.22 MB
BOQ_822448.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .