Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | -42.00% | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹4.2 L (3.62%)Admitted-Finance | -39.90% | ₹1.2 Cr+₹4.2 L (3.62%) | L2 | Admitted-Finance |
| 3 | L3₹1.2 Cr+₹6.0 L (5.16%)Admitted-Finance | -39.01% | ₹1.2 Cr+₹6.0 L (5.16%) | L3 | Admitted-Finance |
| 4 | L4₹1.2 Cr+₹8.0 L (6.90%)Admitted-Finance | -38.00% | ₹1.2 Cr+₹8.0 L (6.90%) | L4 | Admitted-Finance |
| 5 | L5₹1.3 Cr+₹9.0 L (7.76%)Admitted-Finance | -37.50% | ₹1.3 Cr+₹9.0 L (7.76%) | L5 | Admitted-Finance |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
23 Jun 2026, 5:00 pmClosed
Dy. Commandant (Engr.) SHQ(HGI) ITBP Itanagar
Office of the DIG SHQ(HGI) Itanagar
Construction of Boundary wall at 54th Bn ITBP Bhalukpong .Boundary wall at 54th Bn ITBP Bhalukpong .
2026_ITBP_910909_1
305-10 Dtd-29.05.2026
Open Tender
Civil Works
Percentage
365 days
54th BN ITBP Bhalukpong
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4.0 L
31 Jul 2026
1 Jun 2026
24 Jun 2026
1 Jun 2026
23 Jun 2026
1 Jun 2026
1 Jun 2026 - 23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 733.92 | Cum | 340.85 | ₹2,50,156.63 |
| 2.01 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift | 650.6 | Cum | 256.66 | ₹1,66,983 |
| 3.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size) derived from natural sources | 54.11 | Cum | 8,920.07 | ₹4,82,664.99 |
| 4.01 | Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns | 486.54 | Sqm | 513.5 | ₹2,49,838.29 |
| 5.01 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All workup to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural: 3 graded stone aggregate 20 mm nominal size derived from natural) | 105.96 | Cum | 11,845.07 | ₹12,55,103.62 |
| 6.01 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 61.53 | Cum | 14,211.54 | ₹8,74,436.06 |
| 7.01 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 31.05 | Cum | 15,066.03 | ₹4,67,800.23 |
| 8.01 | Centering and shuttering including strutting, propping etc. and removal of form forLintels, beams, plinth beams, girders, bressumers and cantilevers | 937.82 | Sqm | 964.29 | ₹9,04,330.45 |
| 9.01 | Centering and shuttering including strutting, propping etc. and removal of form work for : Columns, Pillars, Piers, Abutments, Posts and Struts | 820.44 | Sqm | 1,258.78 | ₹10,32,753.46 |
| 10.01 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 17,143.93 | Kg | 141.23 | ₹24,21,237.23 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
TFB.pdf
Tender Documents • 2.35 MB
BOQ_957343.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .