Tender Value
₹17.5 Cr
EMD Value
₹10.2 L
Closing Date
24 Feb 2026, 3:00 pmClosed
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
WA SECTION
22 conditions · 7 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Advance Correction Slip No.1(Rly. Board letter No.2022/CE-I/CT/GCC-2022/Policy date 14.07.2022.) PLEASE ATTACH COPY OF AUDITED BALANCE SHEET.
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Advance Correction Slip No.1(Rly. Board letter No.2022/CE-I/CT/GCC-2022/Policy date 14.07.2022.) PLEASE ATTACH COPY OF ANNEXURE VI-B.(Proforma is available in document).
1.1 Definition Of Similar Work: -For Works involving Track works (Sch-A+B) = Rs.2,94,40,454.19 Similar nature of Work: Any Track work i.e The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.)
1.2 Definition Of Similar Work: -For Works involving Building works (Sch-C+F) = Rs.5,42,31,154.62 Similar nature of Work: Construction of buildings work i.e The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.)
1.3 Definition Of Similar Work: -Works involving Bridge works (Sch-D+E) = Rs.8,49,64,894.57 Similar nature of Work: Any Rail/Road Bridge work of opening more than 3.0 m. Note: In case of works to be done under running line, the tenderer should have the experience of carrying out work under running traffic i.e The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.)
1.4 Works involving Electrical works (Sch-F) - Rs. 60,27,022.63 Similar nature of Work: Wiring/ Rewiring in buildings with associated electrical works like control gear and protection arrangements in residential buildings or service buildings or railway stations /yards or colony/highway lightings. OR Lighting arrangement in buildings, circulating area, yard, street etc. with associated electrical works. OR Wiring/Rewiring, Lighting arrangement in buildings with associated electrical w o r k s i.e The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.)
71 conditions · 7 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
CPWD DSR-2021 (Delhi Schedule of Rates) and CPWD Specifications- 2019 (or latest) shall be used for all works related to Building Works, Road Works and Horticulture works and other Miscellaneous works with effect from 16.01.2023 with latest Correction Slips issued from time to time by CPWD.
Signature on Receipts for Amount.
Every receipt for money which may become payable or for any security which may become transferable to the Contractors under these presents, shall, if signed in the partnership name by anyone of the partners of a Contractor's firm be a good and sufficient discharge to the Railway in respect of the moneys or security purported to be acknowledged thereby and in the event of death of any of the Contractor, partners during the pendency of the contract, it is hereby expressly agreed that every receipt by anyone of the surviving Contractor partners shall if so signed as aforesaid be good and sufficient discharge as aforesaid provided that nothing in this Clause contained shall be deemed to prejudice or effect any claim which the Railway may hereafter have against the legal representative of any Contractor partner so dying for or in respect to any breach of any of the conditions of the contract, provided also that nothing in this clause contained shall be deemed to prejudice or effect the respective rights or obligations of the Contractor partners and of the legal representatives of any deceased contractor partners interse. (GCC April 2022 para 53.)
Applicability of rules for this tender
GCC-April 2022 with upto date correction slip.
CPWD DSR-2018 (Delhi Schedule of Rates) and CPWD Specifications- 2019 (or latest) shall be used for all works related to Building Works, Road Works and Horticulture works and other Miscellaneous works with effect from 01.06.2021 with latest Correction Slips issued from time to time by CPWD.
Relevant IS-CODES AND RAILWAY CODES AND MANUALS.
In these Special Conditions of Contract the following terms shall have the meaning hereby assigned to them except where the context otherwise requires.
(a)"General Condition of Contract" shall mean General Conditions of Contract-April 2022 as contained in Western Railway, Engineering Department "Indian Railways Unified standard specifications (works and materials)Vol-I &II".
"Specifications" shall mean the Specifications for Materials and Works of the Railway as specified under the authority of the Ministry of Railways or Chief Engineer or as amplified, added to or superseded by special specifications if any, appended to the Tender Forms. (GCC April 2022 Part I para I Instructions to tenderers (ITT).)
Standard Schedule of Rates (SSOR) shall mean the schedule of Rates adopted by the Railway, which includes- 1."Unified Standard Schedule of Rates of the Railway (USSOR)" i.e. the Standard Schedule of Rates of the Railway issued under the authority of the Chief Engineer from time to time, updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents; 2. "Delhi Schedule Of Rates (DSR)" i.e. the Standard Schedule of Rates published by Director General/ Central Public Works Department, Government of India, New Delhi, as adopted and modified by the Railway under the authority of the Chief Engineer from time to time, updated with correction slips issued up to date of inviting tender or as otherwise specified in the tender documents.
"If any dispute arises between the parties with respect to this agreement any application or suit shall be instituted only in the; court with the local limits or whose Jurisdiction, the Western Railway's Divisional Headquarters office is situated and both the parties shall be bound by this clause. (Head quarters letter no. CE-Circular No. 11/No. W/623/5/ARB/1 dt. 26.04.04)
1.Rajendra Nagar - Provision of stabling line at in connection with SIMHASTHA 2028 & 2.Lekoda-Upgradation of existing "D" class to "B" class in connection with Simhastha 2028 including electrical work
RTM-2025-26-179
RTM-2025-26-179
Open
Works - General
18 Months
Ratlam, Madhya Pradesh
₹0
₹10.2 L
24 Feb 2026
29 Jan 2026
403 items across 7 schedules · ₹24,93,80,004.51 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density a n d dressing bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile existing bank based on initial ground levels before doing benching and (ii) final profile of bank worked out with final levels as per prevailing guidelines. | as of of the | — | — | — | |
| 1 | Using Soil Class SQ3 | cum | 38350.00 | 553.17 | 2,12,14,069.5 |
| Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive of labour, materials, plant & machinery, leading cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge of the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing pumping out water, if required, clearance of site and all other works incidental thereto completing the work as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be led into bank formation and Unusable spoils shall be dumped stacked away from toe of embankment. (ii) hard rock /and boulders not fit for filling will stacked by the contractor and will be property the Railways. (iii)Cut trees shall be property Railways and to be deposited in the railway godown unless specified otherwise in Conditions of Contract. | all all & for the / All be of of the | — | — | — | |
| 2 | In all conditions and classifications of soil except rock | cum | 7922.00 | 112.71 | 8,92,888.62 |
| 3 | Soft rock not requiring blasting | cum | 1811.00 | 259.59 | 4,70,117.49 |
| 4 | Mechanical manufacturing of blanketing material by using only hard and durable stone crushed mechanical crusher to different gradations, wet mixing of the same in designed proportion in mill or wet mix plant to have uniform gradation including all incidental transportation, laying over finished formation in uniform layer(s) with motor grader, compaction with suitable vibratory roller to specified density and finishing to correct profile, complete as per RDSO Specification RDSO/2020/GE: IRS-0004 with latest correction slips. Note: This item shall be used only when entire constituent of blanketing material mechanically manufactured by crushing of hard and durable stone into desired gradation designed proportion. | cum in Pug No. is of | 5556.00 | 2,162.18 | 1,20,13,072.08 |
| Schedule total | ₹3,45,90,147.69 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
LETTEROFCREDITASMODEOFPAYMENT062018.pdf
Safetyrules.pdf
ProcedureforpaymentofContractorbillasperGSTImplementation_GST_290617.pdf
PROCEDUREORDERFORENSURINGSAFETYATWORKSITE.pdf
NOrelativecertificate.pdf
certificateforrailwayemployeereengagement_1.pdf
TERMINATIONCONTRACT.pdf
ACS5GCC2022.pdf
07.08.23ACS4.pdf
07.08.23LAUNCHEMB.pdf
BidCapacity-AnnexureVI.pdf
OffloadingPartSofworkRBLetterNo2022-CE-I-CT-GCC-2020-Polociydt27Apr2022.pdf
BidsecurityAnnexure-VIA.pdf
FormatforAnnualcontractualturnoverAnnexure-VIB.pdf
GCCAPRIL2022.pdf
MOUFORJVGCCAPRIL22WITHALLACS.pdf
AnnexureVasperACS4dt07.08.2023.pdf
AnnexureVA.pdf
ACS6GCC2022.pdf
ACS2dt13Dec22.pdf
ACS1GCCAPR2022.pdf
ACS3dt26APR23.pdf
LetterNo.2017-CE-I-CT-9date31May2023.pdf
GCC2022CorrectionSlipNo9.pdf
GCC2022CorrectionSlipNo7.pdf
PBGPerformaforTenderdocument30Aug2025.pdf
GCC2022CorrectionSlipNo10.pdf
GCC2022CorrectionSlipNo8.pdf
WRProcurementofLEDlightfittingsSpecification.pdf
TS762ElectricalTechnicalSchedule-Lekoda.pdf
PCELetterforCessrepairwork-SpecialCondition.pdf
Bridgespecialconditioncastinsitu.pdf
Recommendedmakermanufacturerofcivilmaterials3.pdf
3PCECircular88forQualityofWorks1.pdf
4corrigendumforsafetyatworkssites2.pdf
SpecialConditionTrack.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .