| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance 23 24 SHAIKH PARA LANE FLAT 2ND FLOOR SHIBPUR HOWRAH PIN 711104 | HOWRAH | HOWRAH | WEST BENGAL | 711104 | +0.00% | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 L+₹7,518.58 (2.55%)Admitted-Finance | +2.55% | ₹3.0 L+₹7,518.58 (2.55%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 L+₹10,938.80 (3.71%)Admitted-Finance | +3.71% | ₹3.1 L+₹10,938.80 (3.71%) | L3 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹6,000
Closing Date
27 Jun 2026, 1:00 pmClosed
EE/WS/JU/BR-XII
97 98 GARFA MAIN ROAD, KOLKATA-700075
RESTORATION WORK OF LARGE DIA MS PIPELINE ON THE SERVICE ROAD PARALLEL TO EM BYPASS, NEAR SAMADRITA COOPERATIVE HOUSING SOCIETY AND ANCILLARY WORK IN WD NO. 107, BR- XII.
2026_KMC_1028533_1
KMC/WS/BR-XII/107/25- 26/M-12/2nd Call
Open Tender
CIVIL WORKS
Percentage
7 days
KMC WARD NO 107
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,000
11 Jul 2026
17 Jun 2026
30 Jun 2026
18 Jun 2026
27 Jun 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.12 Supplying sign-board made of 25 mm thick sal plank with frame on all side of sal batten 50 mm x 32 mm with nailed on post 3.15m x 100mm x100mm and fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap aroundthe post with cement concrete (1 : 3 : 6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of theEngineer-in-charge. Payment of concrete and painting to be made separately.(ii) 900 mm. x 600 mm. size of board. | 2 | EA | 813 | ₹1,626 |
| 2 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.14 Signalling arrangement at both sides of site to avoid any accident during working period 4 nos. red flags during sunlight at 4 corners and 2 nos light (lamp) in other than sunlight. | 5 | DAY | 202 | ₹1,010 |
| 3 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.8 Hire and labour charges for 75 mm dia bamboo railing on Jhau/Eucalyptusor other approved timber\bamboo posts 1.4 m above G.L and 0.60 m below G.L including tying strongly with coir ropes and boring holes for posts in any soil/ concrete surface/Bituminious surface packing the sides etc including cost of carriage of all materials and labour complete including cost of restoration to the damages of the ground to its original condition as per direction of Engineer in charge after removing the barricade.(Cost of restoration would be paid seperately. a) 75mm. dia bamboo railing & 125mm. Dia Jhau/Eucalyptus/other approved timber posts @ 1.60m apart (ii) Railing with 3 rows. | 56 | MTR | 49 | ₹2,744 |
| 4 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.5 Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge. | 7.2 | M3 | 636 | ₹4,579.2 |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.1 Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto3,000 mm. but not requiring shoring | 0.12 | %M3 | 19,238 | ₹2,308.56 |
| 6 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC.1.6 Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as perdirection of the Engineer-in charge for foundation excavation (verticalsurface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(d) (i) For basement work and Depth upto 1.50 m | 36 | SQM | 532 | ₹19,152 |
| 7 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC.1.6 Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as perdirection of the Engineer-in charge for foundation excavation (verticalsurface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(d) (ii) For basement work and Depth beyond 1.50 mand upto 3.00 m. | 24 | SQM | 590 | ₹14,160 |
| 8 | CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor] | 192 | HPH | 33 | ₹6,336 |
| 9 | STEEL MATERIALS :(V) STEEL PLATES : (E 250 CONFORMS TO IS:2062-2006)(B) 10MM- 20 MM. | 0.99 | MT | 46,500 | ₹45,994.08 |
| 10 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.3.5 Fabricating M.S. pipes of different diameter in shop out of 8mm to12mm thick M.S plates supplied depart-mentally, cutting the plates to exact size & shape by gas cutting device and/or by adopting any other approved type of mechanical means, bending the same in true curvature by template and rolling machine of approved design including proper marking, levelling joints followed by electric arc welding as per relevant I.S. specification - longitudinal and circumferential, as necessary, usiug standard electrodes including edge preparation, electricity charges and hydraulic testing of the fabricated piece all complete as per speci-fication and direction of the Engineer-in-Charge. [The Engineer-in-Charge shall approve the electrodes for arc weldingbefore use.]a) Diameter from 450 mm & upto 600 mm.ii) 10mm thick plate. | 0.99 | MT | 13,721 | ₹13,571.72 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_2526280.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .