| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance | -21.51% | ₹2.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.6 Cr+₹4.3 L (1.71%)Admitted-Finance | -20.17% | ₹2.6 Cr+₹4.3 L (1.71%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 Cr+₹8.1 L (3.21%)Admitted-Finance | -18.99% | ₹2.6 Cr+₹8.1 L (3.21%) | L3 | Admitted-Finance |
| 4 | L4₹2.7 Cr+₹15.9 L (6.33%)Admitted-Finance | -16.54% | ₹2.7 Cr+₹15.9 L (6.33%) | L4 | Admitted-Finance |
| 5 | L5₹2.7 Cr+₹16.2 L (6.46%)Admitted-Finance | -16.44% | ₹2.7 Cr+₹16.2 L (6.46%) | L5 | Admitted-Finance |
Tender Value
₹3.2 Cr
EMD Value
₹6.4 L
Closing Date
10 Mar 2025, 6:00 pmClosed
Superintending Engineer
PWD Circle Balotra
Construction of Various BT road of Package No. RJ-43-01/Rural Road/SF/2024-25 in District Balotra
2025_CEPWD_449134_1
NIT No. 04/2024-25 SE BLT
Open Tender
Civil Works
Percentage
180 days
Balotra
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,000
office ID 12603
₹6.4 L
Yes
15 Apr 2025
21 Feb 2025
11 Mar 2025
21 Feb 2025
10 Mar 2025
21 Feb 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of New BT Road for Nagana Temple Parikarma KM 0/0 to 2/500
Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) By Mechanical Means In area of light jungle | 1.25 | Hect. | 13,745 | ₹17,181.25 |
| 2 | Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) | 3,105 | Cum | 69 | ₹2,14,245 |
| 3 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) | 2,244 | Cum | 146 | ₹3,27,624 |
| 4 | Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2) | 3,375 | Cum | 80 | ₹2,70,000 |
| 5 | Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2) | 4,500 | Cum | 130 | ₹5,85,000 |
| 6 | Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) (incl. lead upto 1000M & all lifts).for grading- I Material | 3,137.9 | Cum | 326 | ₹10,22,955.4 |
| 7 | Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) | 854.58 | Cum | 1,126 | ₹9,62,257.08 |
| 8 | Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) | 709.73 | cum | 1,208 | ₹8,57,353.84 |
| 9 | Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.) additional 0.1 Kg. Per Sqm emulsion (8.5Kg./10m2) | - | Sqm. | 45 | - |
| 10 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. additional 0.1 Kg. Per Sqm emulsion | - | Sqm. | 14.75 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.99 MB
Tendernotice_2.pdf
PDF • 1.69 MB
Tendernotice_3.pdf
PDF • 9.48 MB
Tendernotice_4.pdf
PDF • 8.07 MB
Tendernotice_5.pdf
PDF • 0.19 MB
BOQ_806734.xls
BOQ • 0.34 MB
PA_01RuralRoad.pdf
Tender Documents • 2.68 MB
BOQ.xls
BOQ • 0.34 MB
Tenderdocument.pdf
Tender Documents • 2.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .