| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.1 LAccepted-Finance | L1 | Accepted-Finance Being L1 | |
| 2 | L2₹95.0 L+₹90,921.28 (0.97%)Rejected-Finance VILLAGE SILLU P O TEHSIL THEOG DISTT SHIMLA H P | SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | L2 | Rejected-Finance Being higher rates | |
| 3 | Rejected-Technical | - | Rejected-Technical Technically non responsive as he has failed to upload the undertaking/affidavit that this was his first bid and that he waned relexation regarding the work exerience and tournover equirement under the enlistment rule 2021 | |
| 4 | Rejected-Technical VILLAGE PAPAHAN PO JHOUNKA RATIAL TEHSIL JAWALI DISTT KANGRA H P | - | Rejected-Technical Technically non responisve as he has express in writing his inability to execute the work in stiulated period due to his domestic emergency |
Tender Value
₹90.9 L
EMD Value
₹1.8 L
Closing Date
2 Apr 2026, 5:00 pmClosed
Executive Engineer
Theog Division, HP.PWD., Theog
C/O extension of slab culvert at RD 2/750, 3/330 , 5/615
2026_PWD_132229_1
THD/CB-tender/2025-26-16747-57
Open Tender
Civil Works - Roads
Percentage
90 days
HPPWD
As per GCC
15 documents required · 15 mandatory
₹2,000
₹1.8 L
18 Apr 2026
23 Mar 2026
4 Apr 2026
23 Mar 2026
2 Apr 2026
23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation for structure as per drawing & technical specification clause 305.1 including setting out construction of shoring and bracing removal of slips and other deleterious material and disposal upto a lead of 50 m dressing of sides and bottom and back filling in trenches with excavated suitable material 1. ordinary soil (1) upto 3 meter depth including all leads and lifts or as per the direction of Engineer - in Charge | 825.93 | Per cubic meter | - | - |
| - | P/L Cement concrete 1:6:12 (one cement : six sand : twelve graded stone aggregate forty millimeter nominl size ) for plain / reinforced concrete work in open foundation complete as per drawing and technical specification Clauses 802, 803, 1202 & 1203. | - | Per cubic meter | - | - |
| - | Providing concrete for plan/reinforced concrete in open foundation complete as per drawing and technical specification clause 802 , 803 , 1202 and 1203 P.C.C grade M-10 (i) Nominal mix 1:3:6 (one cement : three sand : six graded stone aggregate) including carriage of material , with in all leads and lifts or as per the direction of Engineer - in Charge | 292.38 | Per cubic meter | - | - |
| - | Providing concrete for plan/reinforced concrete in sub structure complete as per drawing and technical specification clause 802 , 804 , 805,806, 807, 1202 and 1203 P.C.C grade M-10 (i) Nominal mix RCC/ PCC (C.C. 1:2:4) | - | Per cubic meter | 6,321.4 | - |
| - | Providing and laying reinforced cement concrete M 25 in sub structure complete as per drawing and technical specification clause 800 , 1205.4 and 1205.5 | - | Per cubic meter | - | - |
| - | Providing and laying cement concrete wearing M 30 grade including reinforcement complete as per drawing and technical specification clause 800 , 1205.4 and 1205.5 | - | Per cubic meter | - | - |
| - | plan/reinforced cement concrete in sub -structure as per drawing and technical specification clause 802 , 804 , 805,806, 807, 1202 and 1204 P.C.C grade M-15 (1:2.5:50 upto 5 metre height | - | Per cubic meter | - | - |
| - | Supplying fitting and placing HYSD bar reinforcement in super structure complete as per clause 1002, 1010 & 1202. | - | Per Tonne | 95,000 | - |
| - | Providing weepholes in brick masonry/ stone masonry , plain/ reinforcement concrete abutment , wing wall return wall wih 100 mm dia PVC pipe extended through the full width of the structure with slope of 1( V ) : 20 ( H ) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7 including all lifts and carriage of material | - | Each | - | - |
| - | Drainage spout complete as per drawing and technical specification clause 1209 | - | Each | - | - |
stage.html
html • 0.04 MB
technical_195531.pdf
techsummary_195531.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
GCCJob-1.pdf
Tender Documents • 4.77 MB
BOQ_195531.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .