| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-AOC | ₹2.5 Cr Quoted ₹2.6 Cr | L1 | Accepted-AOC AS PER LOA |
| 2 | L2₹2.6 CrRejected-Finance 25A CHAK HARINANDAN NAIN PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | ₹2.6 Cr | L2 | Rejected-Finance AS PER RATE |
| 3 | L3₹2.7 CrRejected-Finance | ₹2.7 Cr | L3 | Rejected-Finance AS PER RATE |
| 4 | L4₹2.9 CrRejected-Finance MIRZAPUR UTTAR PRADESH UP | ₹2.9 Cr | L4 | Rejected-Finance AS PER RATE |
| 5 | L5₹2.9 CrRejected-Finance CHHIBAIYA JHUNSI PRAYAGRAJ | JHUNSI | PRAYAGRAJ | UTTAR PRADESH | ₹2.9 Cr | L5 | Rejected-Finance AS PER RATE |
Tender Value
₹4.3 Cr
EMD Value
₹23.3 L
Closing Date
23 Mar 2026, 3:00 pmClosed
S.E. PRYAGRAJ CIRCLE, PWD, PRAYAGRAJ
S.E. PRYAGRAJ CIRCLE, PWD, PRAYAGRAJ
CONSTRUCTION WORK OF NAINI VIDYA NAGAR ALL INTERNAL ROADS
2026_CEALD_1121938_51
962/10Com(P)-PRJ.CIRCLE/2026 DATED 07.02.2026
Open Tender
Civil Works - Roads
365 days
PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹23.3 L
23 May 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Granular Sub-Base with Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401
Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Cement Concrete Pavement Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,
Providing and Laying Interlocking Concret Block Pavement having thickness 80 mm as per drawing and Technical Specifiaction Clause 1500 of MORD Specification.
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
R.C.C. grade M 20 Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M20 using batching plant transit mixer & Concrete pump
Reinforcement work(Substructure) Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_2100183.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid