Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.1 LAccepted-AOC | ₹33.1 L | L1 | Accepted-AOC ok |
| 2 | L2₹35.7 L+₹2.6 L (7.85%)Rejected-Finance PATHANKOT | PATHANKOT | PUNJAB | ₹35.7 L+₹2.6 L (7.85%) | L2 | Rejected-Finance L2 |
Tender Value
₹38.0 L
EMD Value
₹76,000
Closing Date
25 May 2026, 5:00 pmClosed
Er. Jaspreet Singh Vermi
Executive Engineer Provincial Division PWD Gurdaspur
Construction of Aam Adami Clinic at Village Babowal Block and District Gurdaspur for the year 2026 27
2026_CEPW_168435_1
Bid No 17 Dated 13.05.2026
Open Tender
Civil Works - Buildings
Percentage
120 days
Gurdaspur
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,000
₹76,000
Yes
19 Jun 2026
15 May 2026
26 May 2026
15 May 2026
25 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with impaction including disposal of all surplus soil as directed within lead of 30 metres | 77.32 | Cum | 191.74 | ₹14,825.34 |
| 2 | Cement concrete 1:6:12 With with With stone aggregates 40mm gauge mixing by mechanical means using concrete mixer volumetric type | 13.95 | Cum | 3,645.18 | ₹50,850.26 |
| 3 | shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 11.35 | Sqm | 221.24 | ₹2,511.07 |
| 4 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 2.18 | Cum | 5,627.82 | ₹12,268.65 |
| 5 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. | - | Cum | 6,416.89 | - |
| 6 | Centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc | 80.18 | Sqm | 560.46 | ₹44,937.68 |
| 7 | Centering and shuttering for sides and soffits of beam, beams, launching girders, bressumers, lintels | 11.82 | Sqm | 400.33 | ₹4,731.9 |
| 8 | First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth | 23.99 | Cum | 5,875.94 | ₹1,40,963.8 |
| 9 | Damp proof course 4cm thick of cement concrete 1:2:4 with water proofing compound as per manufactures guidelines | 11.1 | Sqm | 265.43 | ₹2,946.27 |
| 10 | First class burnt brick work laid in cement sand mortar 1:4 in first storey upto 4 metres above plinth level | 24.8 | Cum | 6,121.4 | ₹1,51,810.72 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.87 MB
Tendernotice_2.pdf
PDF • 3.21 MB
BOQ_343037.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .