| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC 4 9 2 ETTAYAPURAM ROAD NEAR A P C MAHALAKSHMI COLLEGE TUTICORIN 2 | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.0 LRejected-Finance PLOT NO 39 HIGH STREET VGN TRINITY GARDEN TAMBARAM WEST CHENNAI 600 045 | CHENNAI | CHENNAI | TAMIL NADU | 600045 | ₹5.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹5.7 LRejected-Finance | ₹5.7 L | L3 | Rejected-Finance L3 |
| 4 | L4₹5.8 LRejected-Finance | ₹5.8 L | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | J JAGADESH KUMAR L4 | VEL ENGINEERING L1 | SCAN CONSTRUCTION L3 | Phoenix Engineering L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 23 | M3 | 170 ₹3,910 | 150 ₹3,450 | 100 ₹2,300 Lowest | 200 ₹4,600 |
| 2.00 | Providing and laying Sand filling for foundation including cost of labour, transport, consolidation, lead and lift etc., complete as per standerd specification and as directed by the department at site. | 2 | M3 | 1,020 ₹2,040 | 100 ₹200 Lowest | 2,000 ₹4,000 | 100 ₹200 Lowest |
| 3.00 | Plain Cement Concrete 1:3:6 using 40 mm HBG stone including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site. | 2 | M3 | 5,100 ₹10,200 | 2,000 ₹4,000 Lowest | 6,000 ₹12,000 | 4,000 ₹8,000 |
| 4.00 | R:C:C 1:11/2:3 using 12 to 20mm HBG metal Without form work including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. | 1.5 | M3 | 7,225 ₹10,837.5 Lowest | 10,000 ₹15,000 | 9,000 ₹13,500 | 9,000 ₹13,500 |
| 5.00 | R.C.C. 1:1/2:3 using 12- 20mm metal with form work for Plinths, cable duct, cover slabs & Fire Protection wall using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 2.5 | M3 | 8,925 ₹22,312.5 Lowest | 20,000 ₹50,000 | 10,000 ₹25,000 | 10,000 ₹25,000 |
| 6.00 | Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site | 13 | M3 | 5,100 ₹66,300 | 1,000 ₹13,000 Lowest | 6,000 ₹78,000 | 2,000 ₹26,000 |
| 7.00 | Providing and laying P.C.C 1:2:4 using 12-20mm HBG stone for Plinth with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 17 | M3 | 6,800 ₹1,15,600 | 5,000 ₹85,000 | 8,000 ₹1,36,000 | 4,800 ₹81,600 Lowest |
| 8.00 | Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site . | 68 | M2 | 298 ₹20,264 | 100 ₹6,800 Lowest | 200 ₹13,600 | 300 ₹20,400 |
| 9.00 | Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site. | 0.25 | MT | 80,750 ₹20,187.5 Lowest | 1,00,000 ₹25,000 | 85,000 ₹21,250 | 94,000 ₹23,500 |
| 10.00 | Filling with Well gravel including cost of all labour, transport, materials, leads, lift,etc., complete and as directed by the department engineer at site. | 30 | M3 | 1,360 ₹40,800 | 10 ₹300 Lowest | 400 ₹12,000 | 50 ₹1,500 |
Tender Value
₹6.8 L
EMD Value
₹6,800
Closing Date
30 Jun 2026, 2:00 pmClosed
SE/GCC-I/CNI
230 KV GIS SS COMPLEX, A-10, THIRU-VI-KA INDUSTRIAL ESTATE, GUINDY, CHENNAI-32.
as per NIT
2026_EB_681225_1
OT-002/26-27 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
120 days
SP Koil
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,800
Yes
27 Aug 2026
16 Jun 2026
1 Jul 2026
16 Jun 2026
30 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 23 | M3 | - | - |
| 2 | Providing and laying Sand filling for foundation including cost of labour, transport, consolidation, lead and lift etc., complete as per standerd specification and as directed by the department at site. | 2 | M3 | - | - |
| 3 | Plain Cement Concrete 1:3:6 using 40 mm HBG stone including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site. | 2 | M3 | - | - |
| 4 | R:C:C 1:11/2:3 using 12 to 20mm HBG metal Without form work including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. | 1.5 | M3 | - | - |
| 5 | R.C.C. 1:1/2:3 using 12- 20mm metal with form work for Plinths, cable duct, cover slabs & Fire Protection wall using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 2.5 | M3 | - | - |
| 6 | Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site | 13 | M3 | - | - |
| 7 | Providing and laying P.C.C 1:2:4 using 12-20mm HBG stone for Plinth with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 17 | M3 | - | - |
| 8 | Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site . | 68 | M2 | - | - |
| 9Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift, cutting, bending, typing and binding and placing in position etc., complete as directed by the department engineer at site. | |||||
| 10 | Filling with Well gravel including cost of all labour, transport, materials, leads, lift,etc., complete and as directed by the department engineer at site. | 30 | M3 | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_818646.xls
BOQ • 0.27 MB
OT002.pdf
Tender Documents • 0.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].