Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.2 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹45.5 L+₹28,930.07 (0.64%)Rejected-Finance 10TH FLOOR CTC 662 1 A 1003 A WING GUNDECHA MONTEGO MEHTA COMPOUND MOHILI VILLAGE VIJAY PRINT SAKINAKA MUMBAI 400 072 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400072 | L2 | Rejected-Finance Not Qualified | |
| 3 | L3₹48.0 L+₹2.8 L (6.15%)Rejected-Finance | L3 | Rejected-Finance Not Qualified | |
| 4 | L4₹53.1 L+₹7.9 L (17.4%)Rejected-Finance SHOP NO B 11 SHIV SAMARPAN CO OP HSG LTD SHRUSHTI COMPLEX RNP PARK NEAR JEASL PARK BHAYANDER EAST DIST THANE 401105 | PALGHAR | MAHARASHTRA | 401105 | L4 | Rejected-Finance Not Qualified | |
| 5 | L5₹56.5 L+₹11.2 L (24.9%)Rejected-Finance K 11 MAHIPALPUR NEW DELHI 110037 | NEW DELHI | DELHI | 110037 | L5 | Rejected-Finance Not Qualified |
Tender Value
₹65.0 L
EMD Value
₹1.3 L
Closing Date
23 Aug 2023, 6:00 pmClosed
AGM (E-C)
O/o AGM (E-C), AAI, Juhu Airport, Vile Parle (W), Mumbai 400056
Repair and painting of boundary wall at Juhu Airport
2023_AAI_162787_1
AAI/AGM(E-C)/E-NIT/JJ/
Open Tender
Civil Works
Item Rate
120 days
Juhu Airport
As per NIT
10 documents required · 10 mandatory
₹1,180
₹1.3 L
2 May 2024
1 Aug 2023
25 Aug 2023
2 Aug 2023
23 Aug 2023
2 Aug 2023
2 Aug 2023 - 9 Aug 2023
Amount
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand)
15 mm cement plaster on the rough side of single or half brick wall of mix : 1:4 (1 cement: 4 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : Water thinnable cement primer
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): From brick work in cement mortar
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 3.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 3.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per directionof Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately).
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Deduct for using old serviceable bricks obtained from the demolishing of the brickwall as per the direction of EIC.
patwa and co
M K CONSTRUCTION
Mavji shyamji dodiya
BALVIR SINGH AND SONS
Om Sai Associates
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .