Tender Value
₹14.5 Cr
EMD Value
₹8.7 L
Closing Date
23 Feb 2026, 11:00 amClosed
MAS-AJJ section :Construction for rebuilding of bridge no.14 UP and DN fast lines by Pile foundation with RCC precast boxes and duly diverting of traffic in new bridge adjacent to existing by pile foundation and launching of RCC boxes and Increasing the barrel length of existing Bridge No.13A of Pipe culvert of span 4x1.6m- Bridge and other work
MAS05OF26023C~SR
MAS05OF26023C
Open
Works - General
10 Months
Chennai, Tamil Nadu
₹0
₹8.7 L
23 Feb 2026
30 Jan 2026
9 Feb 2026
A-List of items of work that are covered under Southern Railway Unified
B-List of items of work that are not covered under Southern Railway
Under Non-LineBlock - Providing and installing of Hot rolled sheet pile to line level and 1 alignment including making reformedsheet piles at required positions at corners, junctions wedged portion etc., installing vertically along the alignmentwith the help of equipment's like hydraulic excavators, mounted vibro hammer or silent piler based on site requirement and as directed by Engineer- in-charge through the groove sto interlock together sheet pile to suit the grooves of existing sheet pile. Providing sheet piles of AU25 type or equivalent installing the sameto an average depthof 4.50m to 5.00m below the excavation level. Providing additional support for sheet piles erection of ISMB of size 300mm to a depth of 12.0 m driving the same using auger boring up to a an chorage depth of 4.5 to 5.0 m below excavated level atinterval of 1.20mc/c and min. space between raft slaband sheet pile should be 1.00 m also to the line and level and vertically and providing horizontal braces 2nos of ISMB 250mm fixing with the vertical post along the perimeter of pile, it includes providing additional struts at 2.4m c/cwith vertical supports, sheet pileto bedismantled/ removed after intended purpose as directed by the Engineer- incharge including cost of all conveyance of all materials, hirecharges of equipment's and mobilization and demobilization including fuel, lubricant charges etc., complete till the completion of retaining wall up to ground level Note : Unit to be read as"Horizontal Metre" Above/
Trucking out of RCC boxes and slabs from near by location to the bridge site without causing damage to the RCC boxes including loading, leading, unloading with lead and lift, etc. Complete and as directed by the Engineer- in-charge, (All labour,machinery, tools & plant and consumables will be arrange by the contractor at his own cost) Above/
"Transporting of Steel cribs for staging purposes at site from the stores/ depot of 3 SSE/Bridges or available any where over chennai division by road or any other means to the site of work in MAS - GDR section and hand over the steel cribs to the stores of SSE/Bridges or any other location a ordered after completion of work using contractor's own tractor/trailor including loading leading, and unloading at nominated location with all leads and lifts etc. complete as directed by theEngineer in charge. (a) Initial lead upto 20 Km (All labour, tools, materials, road vehicles consumable stores, crew etc., are to be supplied by the contractor only at his own cost.)" Above/
"(b) For every addll.Km (or) part there of beyond the initial lead of 20 km (All labour, tools, materials, road vehicles, consumable stores,crew etc., are to be supplied by the contractor only at his own cost.)" Note : Each unit denotes 'KM/ MT ' Above/
Lifting and laying in position and erection of RCC Box manufactures at sites in the location to corrected alignment by using contractor's road crane of required capactity or by any 5 other approved means including shoring , strutting and other related safety works for embankment cutting during LB/PB works and as directed by the engineer in charge with all lead and lift etc complete. (All labour, materials, tools and plants,etc., are to be supplied by the contractors only) (Rate inclues the hire charges of required capactity of road crane with crawler wheel type or similar type including standby). Note: To handle the launching and erection of Boxes minimum 2 no's of crawler crane with 220 - 250 MT capacity is required. This aspect should be taken in to account while quoting the rates. Above/
Removing the Railway's steel girder from already erected steel crib staging and stacking the same at the work site without infringements with alll leads and lifts etc., complete and as directed by the engineer-in- charge. Note: Per unit denote as {Per arrangement) Above/ Per Track
Linking permanent way after removal temporary girder and ensuring the filling and consolidation of earth up to cess level using available PSC track sleepers with M+7 density and Rails 7 under line block duly dumbing require ballast with one round of katcha packing under line block with contractor's labour, tools etc., complete and as directed by the engineer in Charge (All alabour and tools including other consumable stores are to be supplied by the tenderer/contractor only at his own cost). Above/
"Providing lighting arrangement on hiring basis with contractor's supply of genset and and other fixing materials at particular location of work includes fixing of 4x500 W halogen 8 lights with necessary fittings for night time working as per stipulated norms and lighting the same by means of contractor's supply of 2.5 KVA or higher capacity portable genset, including all luminaries, cables, fuel and tripods. The lights along with genset and necessary fittings either be deposited with SSE/Bridges in charge or can be taken to the stores by the contractor after successful completion of night block on a daily basis. One genset operator and 3 helpers are to be made available for transporting and fixing the lights from the SSE/Bridges depot. (All labour, tools, materials, , are to be supplied by the contractor only at his own cost.) (Note:Unit-Each donotes per gen set) " Above/
"Dismantling of existing stagging arrangements including bottom shutters, cross channels, I girders and steel cribs using crane leading and stacking away from the site " Above/
Dismantling the existing RCCBox /RCC Bed Block of piers and abutments to required 10 portion before taking up mega block in order to reduce the block period for launching and fixing of new precast RCC Bed block using mechanised Diamond wire sewing & core cutting / wall sewing method to Correct shape and size including clearing of debris without affecting the train traffic movement with contractor men, Materials, machineries etc., as directed by Engr-in-charge.The rate shall include the cost of working platform scaffolding arrangements required for keeping the machineries at site of work. Above/
Transporting of 60 kg new PSC track sleepers, from Tiruvalam/ Ambattur or any other 11 concrete sleeper depot/nominated location in MAS division to the site of work duly collecting the same from depot, leading by contractor's own road vehicle such as tractor/trailor by road to site of work, unloading along side of track and distributing the same along cess using road crane etc.as directed by the Engineer-in-charge without infringing tracks with all lead and lift etc. including crossing the track wherever required. (a) Initial lead upto 20 km (All labour, tools, materials, road vehicles, consumable stores, crew etc., are to be supplied by the contractor only at his own cost.)" Above/
(b) For every addll. Km (or) part there of beyond the initial lead of 20 km (All labour, tools, materials, road vehicles, consumable stores, crew etc., are to be supplied by the contractor only at his own cost.) All materials ,labour tools, plants and any other incidental work arise at site if necessary at the time of construction of working plat form /cofferdam etc., complete to be borne by the tenderer/ contractor and as directed by the Engineer-in charge" Above/
Description: "Transporting of 90R/52kg/60 kg rails from the the stores /depot of SSE/Bridge/P.way available in chennai division or from anywhere over Chennai Division by road to 13 the site of work and hand over realeased Rails, Channel sleepers and other released materials to the nearest station/LC/stores of SSE/Bridge/P.way as ordered after completion of work using contractor's own tractor/trailor including loading, leading, and unloading at nominated locations with all leads and lifts etc. complete as directed by the Engineer in charge. (a) Initial lead upto 20 Km (All labour, tools, materials, road vehicles, consumable stores, crew etc., are to be supplied by the contractor only at his own cost.) Above/
Hiring of earthwork hydraulic excavator of 0.70 t0 1.20 cum bucket capacity (TATA Hitachi Ex 200/JCB 200/KOMATSU's 200) for removal of earth, boulders, heavy materials, clearing of bushes/vent way of bridges, moving and levelling of Railway earth/boulders to a safe distanc without damaging the railway property. The contractor must arrange road permit for vehicle for all states of operation as per the instructions of Engineer- in- charge. All the costs of arranging the crew, fuel as well as maintenance cost of the machinery including transportation to site should be borne by the contractor. Note : Each unit denotes 'Hours' Above/
(b) For every addll. Km (or) part there of beyond the initial lead of 20 km (All labour, tools, materials, road vehicles, consumable stores, crew etc., are to be supplied by the contractor only at his own cost. Above/
Bailing out the water from the river bed duly providing bund around and keep dry the surface including making good the surface" Above/
Erection of steel crib staging for a height upto 6m level at bearing locations of PSC U girder for supporting at both ends. Above/
Dismantling of existing stagging arrangements including bottom shutters cross channels I girders and steel cribs using crane leading and stacking away from the site
C-List of items of work that are covered under DSR 2021
A1-List of items of work that are covered under Southern Railway
Supply and using Cement at Worksite Ordinary Portland Cement 53 grade of approved brands/makes
A2-List of items of work that are covered under Southern Railway
Supply of steel reinforcement of approved brands/makes for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars of grade Fe-500D or more of approved brands/makes.
Schedule of Rates 2021 (Formation Works, Bridge Work and P.Way Works)
SW.I MAS-AJJ section :Construction for rebuilding of bridge no.14 UP and DN fast lines by Pile
foundation with RCC precast boxes and duly diverting of traffic in new bridge adjacent to existing
by pile foundation and launching of RCC boxes and Increasing the barrel length of existing Bridge
No.13A of Pipe culvert of span 4x1.6m- Bridge and other work
S No. Item No Description of Item Unit Qty Rate Amount
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Earthwork in filling in embankment,
guide bunds, around buried type
abutments, bridge gaps, trolley
refuges, platforms etc. with
contractor's own earth conforming to
Soil Quality Class SQ1/SQ2/SQ3, after
preparation of foundations as
applicable, benching in existing banks
wherever required, spreading in
layers with motor grader, bringing the
moisture content to OMC, mechanical
compaction to specified density and
dressing of bank to final profile as per
R DSO Specifications: RDSO/2020/GE:
IRS-0004 with latest correction slips.
Note: 1) Foundation preparation,
Benching including additional
earthwork on account of this,
wherever required, shall be paid extra
under relevant schedule item for
benching. 2) Payment for Earthwork
under this item shall be made based
on the cross section measurements
calculated (i) with original ground
profile of existing bank based on
initial ground levels before doing
benching and (ii) final profile of the
bank worked out with final levels as
per prevailing guidelines.
blanketing material by using only
hard and durable stone crushed in
mechanical crusher to different
gradations, wet mixing of the same in
designed proportion in Pug mill or wet
mix plant to have uniform gradation
including all incidental transportation,
laying over finished formation in
uniform layer(s) with motor grader,
compaction with suitable vibratory
roller to specified density and
finishing to correct profile, complete
as per RDSO Specification No.
RDSO/2020/GE: IRS-0004 with latest
correction slips. Note: This item shall
be used only when entire constituent
of blanketing material is mechanically
manufactured by crushing of hard
and durable stone into desired
gradation of designed proportion.
3 013080 Shoring with 'Z' section MS sheet piles Sqm 998.58 1010.15 1008715.59
side by side in all kinds of soil
mechanically or manually as per
approved drawing with contractor's
own arrangement complete in all
respects and removal of sheet piles
after completion of the work as
directed by engineer in-charge Note:
Payment will be made as per actual
driven length of pile.
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Exploratory drilling of boreholes down
to required depth, drilling of 150mm
dia. boreholes in all type of soils
except hard rock & large boulders
(boulder core more than 30cm)
including refilling, reinstating surface
and disposing off surplus material
including use of mechanical rigs with
power operated winches as well as
percussion/chiselling tool for
advancing through occasional seams
of hard strata to be employed, where
necessary in Dry area.
disturbed samples of soil from bore
holes, including provision of air tight
containers for packing, labeling and
transporting the samples to
laboratory. Samples shall be collected
as per IS:2720.
8 021130 Conducting standard penetration test Each 100.00 735.87 73587.00
as per IS:2131 at approximate1.5m
intervals in bore holes, as directed by
the Engineer in charge
Conducting laboratory Tests on
collected soil samples as per relevant
Hydrometer analysis
Earthwork in excavation by
mechanical means (Hydraulic
Excavator)/Manual Means for
foundations and floors of the bridges,
retaining walls etc. including setting
out, dressing of sides, ramming of
bottom, getting out the excavated
material, back filling in layers with
approved material and consolidation
of the layers by ramming and
watering etc. including all lift, disposal
of surplus soil up to a lead of 300m,
all types of shoring and strutting with
all labour and material complete as
per drawing and technical
specification as directed by Engineer
in charge. Note: This item will be used
for excavation work in connection with
other miscellaneous works also like
side drains, foundation for OHE masts
and other miscellaneous structures in
connection with Gauge Conversion,
Doubling, New lines.
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Providing and laying in position Plain
cement concrete of specified Nominal
Mix for miscellaneous works like side
drains, foundation for OHE masts and
other miscellaneous structures
excluding the cost of Cement,
centering and shuttering - All work up
to plinth level :
(zone-III) : 6 graded stone aggregate
20 mm nominal size)
(zone-III): 6 graded stone aggregate
40 mm nominal size).
P r o v i d i n g and laying in position
machine batched, machine mixed and
machine vibrated Cement Concrete of
specified grade as per approved
Design Mix (mixed in Mobile Concrete
Batching/Mixing Plant at site or RMC
from approved plants) using 20mm
graded crushed stone aggregate and
coarse sand of approved quality for
the following Reinforced cement
concrete structural elements up to
height of 9.0 m from foundation top
level, including finishing, using
Plasticiser in approved proportions (as
per IS:9103), to modify workability
without impairing strength and
durability complete as per
specifications and direction of the
Engineer in charge. Note: 1. Payment
for cement, reinforcement and
shuttering shall be made extra under
relevant item. 2. Plasticiser shall
invariably be used in approved
proportion to increase workability with
minimum possible quantity of cement
for all grade of Design Mix Concrete
unless it is specifically approved
citing reasons for not using plasticiser
at the stage of Mix Design and in that
case deduction shall be made as per
Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc.
Abutments, Wing walls and Return
walls etc., of new bridges with 110mm
dia UPVC pipe Type A ISI marked with
all contractor's men, material,
transportation, all taxes as per
specifications and as directed by
Engineer-in-Charge.
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Boring, providing and installation of
bored cast in-situ Reinforced Cement
Concrete piles using Hydraulic piling
Rig of specified diameter and length
below pile cap of specified grade with
Design Mix Cement Concrete, using
20mm graded crushed stone
aggregate and coarse sand of
approved quality, to carry a safe
working load not less than specified,
concreting by machine batching,
machine mixing, scaffolding, using
Admixture in approved proportion (as
per IS:9103), placing with tremie pipe,
chipping off of pile top to remove
laitance concrete above cut off level
etc., pumping and bailing out water
complete in all respect as per
approved drawing, specification and
direction of the Engineer in charge.
Note: 1. Payment for only cement,
reinforcement shall be made extra. 2.
Length of the pile for payment shall
be measured up to the bottom of RCC
pile Cap. 3. Plasticiser shall invariably
be used in approved proportion to
increase workability with minimum
possible quantity of cement for all
grade of Design Mix Concrete unless
it is specifically approved citing
reasons for not using plasticiser at the
stage of Mix Design and in that case
deduction shall be made as per
24 022100 Providing, fabricating and installing MT 30.00 123864.05 3715921.50
permanent casing pipe for bored piles
for all diameters with specified
thickness of steel plate including all
labour, materials, tools & complete as
per approved drawing & specifications
complete in all respect as per the
direction of Engineer in charge. Note:
Payment shall be made as per the
weight of circular plate of casing pipe
E x t r a for chiselling in addition to
boring of piles, if chiselling is required
to be resorted to in hard rock or big
stone boulders larger than 30cm,
manually or by any other means.
Conducting load test of a single pile
up to specified capacity in accordance
with IS:2911 (Part-IV) including
installation of loading platform and
preparation of pile head or
construction of test cap and
dismantling of test cap after test etc.
with all labour, material, tool & plants,
equipment, machinery, etc. complete
as per drawing and specification, as
directed by the Engineer.
26 022121 Initial load test up to 50 ton capacity Each 2.00 67014.84 134029.68
to 100 T capacity pile
to 250 T capacity pile
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
pile capacity or part thereof over 250
Lateral load testing of single pile in
accordance with "IS Code of practice
IS:2911 (Part-IV) for determining safe
allowable lateral load of pile" with all
labour, material, tool & plants,
equipment, machinery, etc complete
as per drawing and specification as
directed by the Engineer.
30 022131 Piles with lateral load capacity of up to Each 10.00 19329.45 193294.50
31 022132 Piles with lateral load capacity of Each 10.00 20506.84 205068.40
above 50 ton and up to 100 ton
Providing and constructing Temporary
Earthen Island / coffer dam for
construction of well foundations of
dia. up to 10m (longest dimension) ,
including bailing and pumping out of
water, provision of sand bags, wooden
ballies, sheet piling, earth, sand or
any other suitable material, as
required with all labour and material
service road to reach island location
from one pier location to another pier
batched, machine mixed and machine
vibrated Cement Concrete of specified
grade as per approved Design Mix,
mixed in Mobile Concrete
Batching/Mixing Plant at site or RMC
from approved plants, (Cast in-
Situ/Pre-cast) in bottom/top slab, side
walls, toe wall and sumps haunch
filling head walls, thrust bed or any
other component using 20mm graded
crushed stone aggregate and coarse
sand of approved quality of RCC box
of any size including finishing,
Plasticiser in approved proportions (as
per IS:9103), to modify workability
without impairing strength and
durability, complete as per drawings
and technical specifications as
directed by Engineer in charge. Note:
1. Payment for cement, reinforcement
and shuttering shall be made extra
under relevant item. 2. Plasticiser
shall invariably be used in approved
proportion to increase workability with
minimum possible quantity of cement
for all grade of Design Mix Concrete
unless it is specifically approved
citing reasons at the stage of Mix
Design and in that case deduction
shall be made as per relevant item.
Centering and shuttering including
strutting, propping etc. and removal
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
34 025031 All types of bridge sub-structures, e.g. Sqm 800.00 765.08 612064.00
pier, abutment, wing wall, retaining
wall, RCC box type foundations,
Abutment cap, Pier Cap, Inspection
Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc. up to
5m above ground level
35 025032 All types of bridge super-structures, Sqm 100.00 989.92 98992.00
e.g. slabs, I-girders, T-girders, Box
girders etc. up to 5m above ground
36 025033 Extra for additional height over item Sqm 50.00 121.09 6054.50
no. 025031 & 025032 wherever
required with adequate bracing,
propping etc. over initial height of 5
metres for every additional height of
1 metre or part thereof.
abutments and piers, made by 20mm
thick 1:4 cement plaster for a width of
not less than 300mm, duly engraving
markings & figures in metres, divided
into 10 parts commencing from
under-side of girders towards bed,
painting markings & figures with black
enamel paint in three coats on white
background including painting HFL
Mark in white by side of gauge with
year of occurrence with all
Contractor's materials, labour, tools,
scaffolding and supports, lead & lifts,
curing etc. complete as per approved
drawing and as directed by the
Engineer in- charge excluding cost of
cement which shall be paid extra.
Providing and fixing in position GI
Drainage Spouts of required length
with Grating in RCC slab and filling
bitumen along kerb as shown in
drawing with contractor's pipes,
bitumen, tools, equipment, lead, lifts
etc. complete as per specifications
and as directed by Engineer in-
access ladders, inspection platforms,
Trolley refuges etc., on bridges with
structural steel conforming to IS:2062
including welding / bolting, priming
painting with one coat of ready mixed
paint of Zinc Chromate (IS:104) with
DFT of 25-30 microns followed by one
coat of Zinc Chrome Red Oxide
(IS:2074) with DFT of 25 microns with
all material, labour, T&P as a
complete job. Note: Painting shall be
paid separately under relevant item.
Providing road crane of specified
lifting capacity with specified jib
length revolving type for material
handling, assembly & erection of
girders/slab/RCC Box etc.
capacity over Item 041209 for every
additional 1 MT capacity or part there
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Removing of existing bed plate from
existing bed block, supply, fabrication
and erection of new bed plate of
approved sizes in exact position over
bed block of pier/abutments by giving
full and even bearing, setting them on
the layer of free flow non-shrinkable
grouting compound, scrapping or
chipping of bed block, if required,
fabrication and fixing of holding down
HTS bolts of suitable sizes along with
nuts, washers etc., drilling holes of
required size, grouting of holes by
epoxy mortar after fixing holding
down bolts. Total work to be done
during traffic block. Cost of holding
down HTS bolts shall be paid extra
under relevant item for supply of HTS
holding down bolts.
nuts, washer etc.
Delaunching of all types of Steel
girders, PSC girders/Slabs and
stacking away from river stream or
passage as directed by Engineer in
charge with all labour, tools and plant,
equipment etc., complete.
welded and/or bolted and/or riveted
steel work in built up sections, trusses
and framed work, staging, racks,
Height Gauge etc. for Steel Structures
other than bridge girders, using RSJ,
tees, angles and channels/flats,
plates, gussets, round or square bars,
cleats, bolts etc., with contractors
own steel including cutting, bending,
straightening, drilling, riveting,
hoisting, fixing, erecting, welding,
bolting etc., with Providing stiffeners
wherever required as per approved
drawing including applying a priming
coat of a approved steel primer with
all contractor's materials, labour, tools
& plants, lead & lift including crossing
of tracks if required etc., complete as
per specification and as directed by
E n g i n e e r- i n - c h a r g e . Note: The
payment shall be made on the
theoretical weight of main
components and gusset plates only.
46 051010 Providing and laying boulders apron cum 50.00 2549.00 127450.00
on river bed for protection against
scour with stone boulders weighing
not less than 35 kg each with voids
filled with spalls complete as per
drawing and Technical Specification.
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
47 051070 Providing and laying Pitching with cum 100.00 4623.36 462336.00
Stone Boulders, weighing not less
than 35kg each with voids filled with
cement sand mortar 1:4 on slopes
laid over prepared filter media
including boulder apron laid dry in
front of toe of embankment complete
as per drawing and Technical
Specifications (filter media to be paid
separately under the relevant item).
Rate is excluding cost of cement
which shall be paid extra under
48 051080 Providing and laying Filter Material as cum 100.00 3517.49 351749.00
per RDSO Specifications underneath
pitching in slopes complete as per
drawing and Technical Specification.
49 052060 Providing and inserting nipples of size Each 100.00 101.48 10148.00
12 to 20 mm dia. with approved fixing
compound after drilling holes for
grouting as per Technical
Specifications including subsequent
cutting/removal and sealing of the
hole as necessary after completion of
Grouting of masonry/concrete by
injection process duly Sealing of
cracks, through nipples complete as
per Technical Specification and
procedure given in IRBM Para No 209
including necessary admixture.
Payment shall be as per use of
cement by weight in case of neat
cement/cement mortar grouting and
weight of Epoxy in case of Epoxy
Grouting. (Cement will be paid extra).
shrinkage compound w.r.t. cement.
52 052080 Applying epoxy mortar over leached, Sqm 50.00 13885.17 694258.50
honey combed and spalled concrete
surface and exposed steel
reinforcement complete as per
Technical Specification with average
thickness of 10mm including priming
coat, mortar plaster and seal coat of
polymer mortar of strength 45 Mpa
(28 days) for replacement of spalled
concrete with average thickness of
10mm as per manufacturer's
specification and approved procedure.
54 052150 Providing and laying of filter media cum 60.00 3072.74 184364.40
consisting of granular materials of
GW, GP, SW groups as per IS:1498
(latest) in required profile behind
boulder filling of abutments, wing
walls / return walls etc. above bed
level with all labour and material
complete job as per drawing and
technical specification of RDSO
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Removing all loose concrete, cleaning
rust with dusting compound & water
jet, drying, replacing worn out
reinforcements by welding new
reinforcement for making up lost steel
section, applying approved anti-
corrosive polymer coating over the
damaged area to proper profile,
providing polymer mortar (up to
20mm thickness) or polymer concrete
(more than 20mm thickness)
consisting of cement, sand, 6mm
down chips where required and
polymer as per manufacturers'
specification. The rate includes curing
for 14 days, all materials,
consumables, labours, tools and
plants, scaffolding/staging with all
lead and lift. Note: Cost of
reinforcement, if used, to be paid
level mark, year of HFL on bridge
abutments and piers with ready
mixed paint as per standard in two
coats over one coat of primer with all
materials, labour, tools, scaffolding,
all lead and lift etc. including writing
57 052210 Providing cast in situ bridge number Each 8.00 1001.17 8009.36
plaques as per Railway drawing in
cement concrete 1:2:4 mix using
20mm hard stone aggregate
embedded in 30mm notch in Bridge
parapet coping duly engraving the
letter and figures and an arrow
indicating the direction of flow and
finishing the top exposed surface with
cement mortar 1:3, painting letters
and figures with two coats of black
enamel paint on two coats of white
background with all labour, tools,
cement, paint etc. with all leads and
58 052220 Providing cast in-situ plaques for Each 4.00 1369.34 5477.36
bridge foundations details of size
45cmx45cmx5cm in cement concrete
1:2:4 mix using 20mm hard stone
aggregate embedded in 30mm deep
notch over abutment & piers,
engraving the letters & figures with
CM 1:3 and finished smooth including
painting letters and figures with 2
coats of black enamel and plaque
with white enamel with all labour,
tools, cement, paint, curing etc. as a
Providing & laying non pressure NP-4
Class RCC pipe with collars, jointing
with 1:2 cement and ordinary sand
mortar including testing of joints, but
excluding earthwork with all labour
and material as a complete job.
Cement for mortar will be paid
separately.(Pipes of 600mm dia and
above will be laid using crane/hydra).
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
coarse sand (no cohesive materials to
be used) of approved quality including
watering and ramming in foundation,
behind the abutment, wing wall,
retaining wall in layers not exceeding
150mm thick including its compaction
as per direction of Engineer-in-
charge. The rate includes all lead, lift,
ascent, descent, crossing of Railway
line etc. complete with contractor's
labour, materials, tools and plant.
62 052250 Providing Boulder Backing behind cum 50.00 427.31 21365.50
wing wall, return wall, retaining wall
with hand packed boulders & cobbles
with smaller size boulders toward the
back including all lead, lift, labour &
other incidental charges as complete
work in all respect. Payment for
boulder/cobbles will be done extra.
63 052260 Dewatering of natural or accumulated HP 1200.00 74.78 89736.00
water from any location. Payment to Hour
be done for Horse power of pump
multiplied by pumping hours.
Designing and developing Detailed
structural and working Drawings for
following items for ROB/RUB/Bridge
based on Railway's approved GADs,
duly collecting necessary data from
Railways and R&B authorities, duly
designing members and submission
of check plot duly getting proof-
checked by Railway approved
institutes, submitting for Railway's
verification and approval, making
corrections duly incorporating
suggestions in drawings/designs,
further submission of original in
transparent film paper and soft copy
(CD) for Railways approval etc. with
contractor's technical expertise and
instruments, labour, consumables,
repeatedly attending till final
approval etc., complete as directed by
Engineer in-charge.
piers/abutments
synthetic Polyester triangular
synthetic fibre in specified ratio (@
0.25% of cement by weight), 6 to
18mm in length, designed for melting
point 240°C to 260°C and specific
gravity of 1.33 to 1.40 in all types of
work CC/RCC/plaster etc., This item
shall only be used on specific
instructions of Engineer-in-Charge.
Gas cutting of rail of various sections
with contractor's tools & plants, as
directed by engineer in-charge :
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Recoupment of ballast in running line
with railway's stone ballast from
existing stacks available along
alignment either on top of cutting or
on cess or at toe of bank by head
leads or by any other means and
spreading to make up deficiency in
the required profile with contractor's
labour, tools & plants, as directed by
Engineer-in-charge. Note: Payment
shall be made based on ballast stack
68 083010 Lifting and packing for regrading the TRM 1000.00 198.96 198960.00
existing PSC sleeper track to required
height / level in stages not exceeding
75mm or part thereof at a time,
providing permissible ramp for the
track, insertion of moorum / sand /
stone ballast uniformly under the
existing track and placing the same to
safe approved gradient, gauge,
cushion including levelling and one
round of through packing to allow
train movement at restricted speed of
30 kmph for a specified length with all
leads & lifts and fixing, marking,
painting rail level pegs at every 30m
interval. Note: Lifting of track shall be
done in stages as per procedure
prescribed in latest edition of IRPWM
to get the proposed final level as per
approved working profile, as directed
by Engineer in-charge.
69 083011 Extra for additional lift over 75mm for TRM 1000.00 30.88 30880.00
every 50mm lift or part thereof up to
275mm for item nos. 083010 for each
70 084010 Loading Railway's ballast, collected at cum 2000.00 45.30 90600.00
yard / depot into Railway's BOB / BKH
/ any other type of open wagon, using
Mechanical Loader or any other
method with all lead and lifts, as
directed by Engineer in-charge.
Unloading of Ballast from Railway's
wagons other than Hopper wagons by
opening the doors of boxes and
pulling & pushing down ballast with
rake irons / phowrahs and distributing
unloaded ballast uniformly over the
track as required, clearing
infringements/jammed ballast,
profiling and boxing following all
prescribed safety norms.
71 084052 Under Conditions not requiring Traffic cum 2000.00 108.71 217420.00
Drilling holes of 16 mm to 32 mm dia.
with Rail Drilling machine including
chamfering with appropriate
chamfering tools in all types of rail
section with contractor's tools &
plants, equipment, consumable with
all lead & lift etc. complete, as
directed by Engineer in-charge. Rail
Drilling Machine will be as per RDSO
Specification No. TM/SM/3, dated
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Loading, leading and unloading of
52Kg / 60Kg rail up to 13 metre length
by Railway's Rail Dolly / Dip Lorry to
the nominated location under traffic
with line protection in case road
carriage is not possible with different
lead with a lift up to 5 metre during
Dismantling existing track on girder
bridges including guard rails and foot
path etc., cutting existing SW panels /
LWR, if required into free rails of not
less than 12 metre length and leading
all released materials to nominated
place within 50m of bridge
approaches and stacking the released
materials clear of infringements, as
per direction of Engineer-in-Charge.
Note: Rail cutting and drilling shall be
paid separately.
74 191012 Under Conditions not requiring Traffic TRM 500.00 398.53 199265.00
75 195070 Fabrication, supplying and fixing Each 2.00 3878.99 7757.98
600mm x 450mm Bridge Board made
from 16 SWG MS Sheet duly welded
or riveted to back support of two
600mm long horizontal angles of size
25mm x 25mm x 3mm & two
numbers 2.5 metre long vertical
support of MS Angle of size 50mm x
50mm x 5mm, welded / rivetted to
board. Vertical supports shall have
split ends for proper fixing in ground.
Vertical supports of board shall be
embedded in ground in M 20 Cement
Concrete blocks of size 300mm x
300mm x 300mm, complete job
including painting & writing of subject
matter on bridge board, as directed
by Engineer - In charge Note:
Excavation & concrete work will be
paid separately.
Hiring of machinery for minor
miscellaneous works for short
duration including operator/driver,
fuel, lubricants and consumable. The
contractor shall arrange all statutory
permits as required by rules and
regulations prevailing in the area of
work. Payment shall be made for
actual working hours at site.
similar with minimum 1.10 cum
bucket capacity
77 211202 Hydra or similar tyre mounted Pick-n- Hour 500.00 1459.19 729595.00
Carry crane of 12T capacity for misc.
works of handling of material
transportation or other misc. works.
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
required by the Engineer in charge,
for various works under SSE/P.Way,
w i t h contractor's T&P, equipments,
hand signal flags, etc. as per
specifications, special conditions and
detailed scope of work as furnished in
the tender and as directed by the
Engineer in charge. Note: Item shall
be operated with prior approval of
concerned Sr. DEN / DEN in charge.
80 211220 Supplying and filling 50 kg size empty Each 10000.00 17.90 179000.00
cement polythene bags with Rly.
Ballast/moorum/earth/Sand/quarry
dust etc. placing the filled bags on the
high banks /bridge
approaches/nominated place etc.
dumping and spreading at the
nominated locations to profile under
block period with all contractor's
labour, tools, plants, loading,
unloading, filling, spreading including
all lead/lift etc. complete and as
directed by the Engineer in charge at
site including crossing of track where
Earthwork in excavation by
mechanical means (Hydraulic
Excavator)/Manual Means for
foundations and floors of the bridges,
retaining walls etc. including setting
out, dressing of sides, ramming of
bottom, getting out the excavated
material, back filling in layers with
approved material and consolidation
of the layers by ramming and
watering etc. including all lift, disposal
of surplus soil up to a lead of 300m,
all types of shoring and strutting with
all labour and material complete as
per drawing and technical
specification as directed by Engineer
in charge. Note: This item will be used
for excavation work in connection with
other miscellaneous works also like
side drains, foundation for OHE masts
and other miscellaneous structures in
connection with Gauge Conversion,
Doubling, New lines.
022014 for executing the work under
water and/or liquid mud to
compensate all additional
arrangements including pumping out
water as required. Note: The extra
percentage rate is applicable only for
the quantity of work executed under
water. [RATE = 20%]
022014 for executing the work under
water and/or liquid mud to
compensate all additional
arrangements including pumping out
water as required. Note: The extra
percentage rate is applicable only for
the quantity of work executed under
water. [RATE = 20%]
Schedule Schedule C-List of items of work that are covered under DSR 2021
Item- 1 List of items of work that are covered under DSR 2021
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
S No. Item No Description of Item Unit Qty Rate Amount
1.0 CARRIAGE OF MATERIALS
By Mechanical Transport including
loading,unloading and stacking
1.1.4 Excavated rock
2.0 EARTH WORK
Earth work in excavation by
mechanical means (Hydraulic
excavator)/manual means over areas
(exceeding 30 cm in depth, 1.5 m in
2.6 width as well as 10 sqm on plan)
including getting out and disposal of
excavated earth lead upto 50 m and
lift upto 1.5 m, as directed by
Engineer-in-charge.
Open timbering in trenches including
strutting and shoring complete
(measurements to be taken of the
face area timbered):
2.27 Supplying and filling in plinth with cum 90 2161.2 194508
sand under floors, including watering,
ramming, consolidating and dressing
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position
cement concrete of specified grade
4.1 excluding the cost of centering and
shuttering - All work up to plinth level
(zone-III) derived from natural sources
7 : 4 graded stone aggregate 20 mm
nominal size derived from natural
Centering and shuttering including
4.3 strutting, propping etc. and removal
of form work for :
4.14S MISCELLANEOUS
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Providing and laying in position ready
mixed or site batched design mix
cement concrete for plain cement
concrete work; using coarse
aggregate and fine aggregate derived
from natural sources, Portland
Pozzolana/Ordinary Portland /Portland
Slag cement, admixtures in
recommended proportions as per IS:
9103 to accelerate / retard setting of
concrete, to improve durability and
workability without impairing
s t r e n g t h ; including pumping of
concrete to site of laying, curing,
carriage for all leads; but excluding
the cost of centering, shuttering and
finishing as per direction of the
engineer-in-charge; for the following
grades of concrete. Note: Extra
cement up to 10% of the minimum
specified cement content in design
mix shall be payable separately. In
case the cement content in design
mix is more than 110% of the
minimum specified cement content,
the contractor shall have discretion to
either re-design the mix or bear the
cost of extra cement.
4.20.1 All works upto plinth level :
4.20.1.3 Concrete of M20 grade with minimum cum 50 8387.15 419357.5
cement content of 270 kg /cum
5.0 REINFORCED CEMENT CONCRETE
5.9S FORM WORK
Centering and shuttering including
5.9 strutting, propping etc. and removal
columns, etc. for mass concrete
5.12S PRE-CAST RCC
5.12 Providing, hoisting and fixing above cum 150 9673.5 1451025
plinth level up to floor five level
precast reinforced cement concrete
work in string courses, bands,
copings, bed plates, anchor blocks,
plain window sills and the like,
including the cost of required
centering, shuttering but , excluding
cost of reinforcement with 1:1.5:3 (1
cement : 1.5 coarse sand(zone-III)
derived from natural sources : 3
graded stone aggregate 20 mm
nominal size derived from natural
5.23S MISCELLANEOUS
5.26 Providing and filling in position, blown cum 12.62 63877.35 806132.16
bitumen in expansion joints.
5.33S DESIGN MIX CONCRETE
Supplying and applying pre tested
and approved water based concrete
curing compound to concrete/
masonry surface, all as per
manufacturer's specification and
direction of Engineer-in-charge.
6.0 MASONRY WORK
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Brick work with common burnt clay
F.P.S. (non modular) bricks of class
designation 7.5 in foundation and
Brick work with common burnt clay
6.2 modular bricks of class designation
7.5 in foundation and plinth in:
10.0 STEEL WORK
10.1 Structural steel work in single section, Kg 1000 93.05 93050
fixed with or without connecting
plate, including cutting, hoisting,
fixing in position and applying a
priming coat of approved steel primer
11.0 FLOORING
11.16S TILE FLOORING
Chequerred precast cement concrete
tiles 22 mm thick in footpath &
courtyard, jointed with neat cement
slurry mixed with pigment to match
the shade of tiles, including rubbing
and cleaning etc. complete, on 20
mm thick bed of cement mortar 1:4 (1
cement: 4 coarse sand).
white cement 50% Grey cement
13.0 FINISHING
13.1S CEMENT PLASTER (IN FINE SAND)
13.1 12 mm cement plaster of mix :
13.11S CEMENT PLASTER IN TWO COATS
under layer 12 mm thick cement
plaster 1:5 (1 cement : 5 coarse sand)
finished with a top layer 6 mm thick
cement plaster 1:6 (1 cement : 6 fine
13.44S EXTERIOR FINISHING
Finishing walls with water proofing
cement paint of required shade :
13.44.1 New work (Two or more coats applied Sqm 740 97.6 72224
15.0 DISMANTLING AND DEMOLISHING
Demolishing cement concrete
manually/ by mechanical means
15.2 including disposal of material within
50 metres lead as per direction of
Engineer - in - charge.
15.2.1 Nominal concrete 1:3:6 or richer mix cum 50 2007.1 100355
(i/c equivalent design mix)
15.2.2 Nominal concrete 1:4:8 or leaner mix cum 40 1239.6 49584
(i/c equivalent design mix)
Demolishing brick work manually/ by
mechanical means including stacking
of serviceable material and disposal
of unserviceable material within 50
metres lead as per direction of
Engineer-in-charge.
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
Demolishing stone rubble masonry
manually/ by mechanical means
including stacking of serviceable
15.9 material and disposal of
unserviceable material within 50
metres lead as per direction of
Engineer-in-charge :
16.0 ROAD WORK
16.49S MISCELLANEOUS
16.75 Providing and laying C.C. pavement of cum 75 8277.55 620816.25
mix M-25 with ready mixed concrete
from batching plant. The ready mixed
concrete shall be laid and finished
with screed board vibrator , vacuum
dewatering process and finally
finished by floating, brooming with
wire brush etc. complete as per
specifications and directions of
Engineer-in-charge. (The panel
shuttering work shall be paid for
separately). (Note:- Cement content
considered in this item is @ 330
kg/cum. Excess/less cement used as
per design mix is payable/
recoverable separately).
18.0 WATER SUPPLY
18.7S C.P.V.C. PIPES
Providing and fixing Chlorinated
Polyvinyl Chloride (CPVC) pipes,
having thermal stability for hot & cold
water supply, including all CPVC plain
& brass threaded fittings, including
fixing the pipe with clamps at 1.00 m
spacing. This includes jointing of pipes
& fittings with one step CPVC solvent
cement and testing of joints complete
as per direction of Engineer in
Charge.-Internal work - Exposed on
22.0 WATER PROOFING
CHENNAI DIVISION-ENGINEERING/SOUTHERN RLY
crystalline admixture for water
proofing treatment to RCC structures
like basement raft, retaining walls,
reservior, sewage & water treatment
plant, tunnels / subway and bridge
deck etc. at the time of transporting
of concrete into the drum of the
ready-mix truck , using integral
crystalline admixture @0.80%
(minimum) to the weight of cement
content per cubic meter of concrete)
or higher as recommended by the
manufacturer's specification in
reinforced cement concrete at site of
work. The material shall meet the
requirements as specified in ACI-212-
3R-2010 i.e. by reducing permeability
of concrete by more than 90%,
compared with control concrete as
per DIN 1048 and resistant to 16 bar
hydrostatic pressure. The crystalline
admixture shall be capable of self-
healing of cracks up to a width of
0.50mm. The work shall be carried
out all complete as per specification
and the direction of the Engineer-in-
charge. The product performance
shall carry guarantee for 10 years
against any leakage.
Providing and applying crystalline
mortar by mixing in the ratio of 4.5 : 1
(4.5 parts crystalline mortar : 1 part
water) for the treatment of faulty
construction joints, cracks, tie rod
holes and spalled & honeycombed
surface of RCC underground
structures like basement, water tanks,
bridge deck etc. to ensure water
tightness. The crystallie mortar shall
22.25 conform to the EN 1504-3 having
compressive strength Class R4
greater than or equal to 45 MPa and
adhesive bond strength Class R3
greater than or equal to 1.5 MPa. The
work shall be carried out all complete
as per specification and the direction
of the engineer-in-charge. The
product performance shall carry
guarantee for 10 years against any
22.25.1 For sealing cracks and faulty Metre 200 469.65 93930
construction joints, routed out/making
U-shape groove size 25x25mm and
then primed the area with integral
crystalline slurry @0.05kg/running
metre and while the surface is tacky
filled the groove upto surface with
crystalline mortar @1.50kg/running
metre. Once crystalline mortar is
touch dry then finally applied two
coats of integral crystalline slurry
@0.05kg/running metre per coat.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
BR14MODIFIEDGAD_compressed1.pdf
ATTACHMENT
STRDRGFORPILEBR13A.pdf
ATTACHMENT
STRDRGFORPILEBR14_compressed.pdf
ATTACHMENT
eTenderformApril2022.pdf
ATTACHMENT
IRGCCACS1to10_compressed.pdf
ATTACHMENT
FORMATIONBUILDINGBRIDGEPWAYWORKSJULY2024_1.pdf
ATTACHMENT
MOVEMENTOFVEHICLESNEARRAILWAYTRACK.pdf
ATTACHMENT
GCCApril2022_compressed.pdf
ATTACHMENT
ProcedureforLCModeofPayment.pdf
ATTACHMENT
NEFTForm.pdf
ATTACHMENT
SNWmasterlistason09012026.pdf
ATTACHMENT
ProcedureforMeasurementofworksbytheContractor.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .