Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAdmitted-Finance SHIV NIWAS DHANDA P O TOTU DISTT SHIMLA HP 171011 | SHIMLA | SHIMLA | HIMACHAL PRADESH | 171011 | L1 | Admitted-Finance | |
| 2 | L2₹14.8 L+₹4.3 L (40.9%)Admitted-Finance CIVIL LINE MATATILA ROAD TALBEHAT DISTT LALITPUR U P | TALBEHAT | LALITPUR | U P | L2 | Admitted-Finance | |
| 3 | L3₹15.0 L+₹4.5 L (42.5%)Admitted-Finance 1442 1 NANADANPURA BABINA CANTT TEHSIL DISTT JHANSI UP | BABINA | JHANSI | UP | L3 | Admitted-Finance | |
| 4 | L4₹17.7 L+₹7.2 L (68.9%)Admitted-Finance VILL PO BUNGWAN KALAN TALBEHAT LALITPUR UTTAR PRADESH 284136 | TALBEHAT | LALITPUR | UTTAR PRADESH | 284136 | L4 | Admitted-Finance | |
| 5 | Rejected-Technical | - | Rejected-Technical DOCUMENTS NOT FOUND IN ORDER. NOT ENLISTED IN CAT D(V)/DD FOR EMD AMOUNT NOT SUBMITTED |
| Sl No | Description | Qty | Unit | HARNAM SINGH ANIL SINGH L2 | M/S SHIVA TRADERS L3 | M/S A.R BUILDERS L4 | M/s Dinesh Kumar L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Disconnecting of transformer 200 to 250 KVA, 11 KV/433 volts indoor /outdoor type of any make after unscrewing nuts /bolts screws and connected accessories such as breather, conservator tank,temp gauge including removing top cover taking out core assembly draining out of Transformer oil, cleaning of tank of transformer, strip inspection of HT/LT winding taking out damaged insulation and cooling HT/LT if any, reassembling of transformer after replacing the damaged coil making necessary connection with LT/HT bushes/Tap changing gear so as to bring Transformer in to original one, filling of transformer oil, commissioning and testing complete including cork sheet 15 mm thick and tightening nuts and bolts, washers, aligned drain plug and other minor parts for repair replacement of defective accessories/defective parts(payment of defective parts to be replaced shall be measured and paid separately). Transportation of distribution Transformer to workshop for repair work and from workshop to back to the installation shall be contractors arrangement complete all as spfd and directed by EIC.
NOTE:- The cost of defective parts to be replaced as required shall be measured and paid separately under respective item of Sch 'A' . | 4 | Each Job | 5,000 ₹20,000 | 4,000 ₹16,000 | 3,000 ₹12,000 Lowest | 4,800 ₹19,200 |
| 2.00 | All as per item Srl No. 1.00 above but for transformer 160 to 100 KVA | 3 | Each Job | 4,500 ₹13,500 | 3,000 ₹9,000 Lowest | 3,000 ₹9,000 Lowest | 4,000 ₹12,000 |
| 3.00 | M&L for Rewinding in replacement of HT coil with super enamelled copper winding cores of appropriate size and nos of turns along with insulating materials like latheorised paper insulations cotton, tape/empire tape, wooden block packing and PVC sleeves soldering and varnishing with insulating varnish heating drying complete. | 550 | Kg | 800 ₹4,40,000 | 820 ₹4,51,000 | 1,040 ₹5,72,000 | 660 ₹3,63,000 Lowest |
| 4.00 | M&L for Rewinding in replacement of LT coil with super enamelled copper strip of appropriate size and nos of turns along with insulating materials like latheorised paper insulations cotton, tape/empire tape, wooden block packing and PVC sleeves soldering and varnishing with insulating varnish heating drying etc. complete all as specified & directed. | 390 | Kg | 790 ₹3,08,100 | 820 ₹3,19,800 | 1,040 ₹4,05,600 | 550 ₹2,14,500 Lowest |
| 5.00 | M&L for Rewinding in replacement of HT coil with super enamelled copper winding cores of appropriate size and nos of turns along with insulating materials like latheorised paper insulations cotton, tape/empire tape, wooden block packing and PVC sleeves soldering and varnishing with insulating varnish heating drying complete. | 385 | Kg | 800 ₹3,08,000 | 820 ₹3,15,700 | 1,040 ₹4,00,400 | 440 ₹1,69,400 Lowest |
| 6.00 | M&L for Rewinding in replacement of LT coil with super enamelled copper strip of appropriate size and nos of turns along with insulating materials like latheorised paper insulations cotton, tape/empire tape, wooden block packing and PVC sleeves soldering and varnishing with insulating varnish heating drying etc. complete all as specified & directed. | 275 | Kg | 795 ₹2,18,625 | 820 ₹2,25,500 | 1,040 ₹2,86,000 | 430 ₹1,18,250 Lowest |
| 7.00 | M&L in replacement of HT 11 KV bush suitable for indoor/outdoor type 100 KVA to 250 KVA transformer complete all as specified and directed. | 12 | Each | 400 ₹4,800 | 250 ₹3,000 | 100 ₹1,200 Lowest | 245 ₹2,940 |
| 8.00 | M&L in replacement of LT 0.433 KV bush suitable for indoor/outdoor type 100 KVA to 250 KVA transformer complete all as specified and directed. | 16 | Each | 300 ₹4,800 | 300 ₹4,800 | 100 ₹1,600 Lowest | 200 ₹3,200 |
| 9.00 | M&L in replacement of brass stud 1 set of 03, brass nuts, brass cup/washers and packing gasket suitable for HT 11 KV bush of indoor/outdoor type 100 to 250 KVA Transformer all as specified and directed. | 4 | Each Set | 450 ₹1,800 | 400 ₹1,600 | 200 ₹800 Lowest | 355 ₹1,420 |
| 10.00 | M&L in replacement for brass stud with brass nuts and washers for LT side suitable for Transformers 100 KVA to 250 KVA, indoor/outdoor including packing gasket complete all as specified and directed. | 16 | Each | 400 ₹6,400 | 400 ₹6,400 | 200 ₹3,200 Lowest | 388 ₹6,208 |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
14 Sept 2026, 6:00 pmClosed
BRIJ BIHARI, AE (CIVIL), AGE (I) TALBEHAT
AGE (I) TALBEHAT, LAKEVIEW CAMP MIL STN TALBEHAT 284125
REPAIR/MAINT OF ELECTRICAL INSTALLATIONS APFC PANELS AND SERVICE TRANSFORMERS AT MIL STN TALBEHAT
2026_MES_784115_1
AGE(I)/TBT/TOK-40/2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
Talbehat Mil. Station
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
AGE(I) Talbehat
₹20,000
Yes
25 Sept 2026
12 Aug 2026
16 Sept 2026
20 Aug 2026
14 Sept 2026
27 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Disconnecting of transformer 200 to 250 KVA, 11 KV/433 volts indoor /outdoor type of any make after unscrewing nuts /bolts screws and connected accessories such as breather, conservator tank,temp gauge including removing top cover taking out core assembly draining out of Transformer oil, cleaning of tank of transformer, strip inspection of HT/LT winding taking out damaged insulation and cooling HT/LT if any, reassembling of transformer after replacing the damaged coil making necessary connection with LT/HT bushes/Tap changing gear so as to bring Transformer in to original one, filling of transformer oil, commissioning and testing complete including cork sheet 15 mm thick and tightening nuts and bolts, washers, aligned drain plug and other minor parts for repair replacement of defective accessories/defective parts(payment of defective parts to be replaced shall be measured and paid separately). Transportation of distribution Transformer to workshop for repair work and from workshop to back to the installation shall be contractors arrangement complete all as spfd and directed by EIC.
NOTE:- The cost of defective parts to be replaced as required shall be measured and paid separately under respective item of Sch 'A' . | 4 | Each Job | - | - |
| 2 | All as per item Srl No. 1.00 above but for transformer 160 to 100 KVA | 3 | Each Job | - | - |
| 3 | M&L for Rewinding in replacement of HT coil with super enamelled copper winding cores of appropriate size and nos of turns along with insulating materials like latheorised paper insulations cotton, tape/empire tape, wooden block packing and PVC sleeves soldering and varnishing with insulating varnish heating drying complete. | 550 | Kg | - | - |
| 4 | M&L for Rewinding in replacement of LT coil with super enamelled copper strip of appropriate size and nos of turns along with insulating materials like latheorised paper insulations cotton, tape/empire tape, wooden block packing and PVC sleeves soldering and varnishing with insulating varnish heating drying etc. complete all as specified & directed. | 390 | Kg | - | - |
| 5 | M&L for Rewinding in replacement of HT coil with super enamelled copper winding cores of appropriate size and nos of turns along with insulating materials like latheorised paper insulations cotton, tape/empire tape, wooden block packing and PVC sleeves soldering and varnishing with insulating varnish heating drying complete. | 385 | Kg | - | - |
| 6 | M&L for Rewinding in replacement of LT coil with super enamelled copper strip of appropriate size and nos of turns along with insulating materials like latheorised paper insulations cotton, tape/empire tape, wooden block packing and PVC sleeves soldering and varnishing with insulating varnish heating drying etc. complete all as specified & directed. | 275 | Kg | - | - |
| 7 | M&L in replacement of HT 11 KV bush suitable for indoor/outdoor type 100 KVA to 250 KVA transformer complete all as specified and directed. | 12 | Each | - | - |
| 8 | M&L in replacement of LT 0.433 KV bush suitable for indoor/outdoor type 100 KVA to 250 KVA transformer complete all as specified and directed. | 16 | Each | - | - |
| 9 | M&L in replacement of brass stud 1 set of 03, brass nuts, brass cup/washers and packing gasket suitable for HT 11 KV bush of indoor/outdoor type 100 to 250 KVA Transformer all as specified and directed. | 4 | Each Set | - | - |
| 10 | M&L in replacement for brass stud with brass nuts and washers for LT side suitable for Transformers 100 KVA to 250 KVA, indoor/outdoor including packing gasket complete all as specified and directed. | 16 | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_878559.xls
BOQ • 0.67 MB
TENDER.pdf
Tender Documents • 0.86 MB
AMENDEMENT.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .