Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance CONTRACTOR VILLUPURAM | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance NO 28 A SUNTHARA VINAYAGAR KOVIL STREET PALAYAPETTAI GANDHI NAGAR POST TIRUNELVELI 627 008 | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | 627008 | Admitted-Finance |
Tender Value
₹7.5 L
EMD Value
₹7,500
Closing Date
1 Sept 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GCC/Madurai
SE/GCC/MADURAI
Providing cable duct formation yard Melakallur 110/11 KV SS premises.
2020_EB_177145_1
SE-GCC-MDU SPEC.NO.019/2020-21
Open Tender
Civil Works
Works
90 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
THE SUPERINTENDING ENGINEER/GCC/MADURAI
₹7,500
Yes
21 Sept 2020
25 Aug 2020
2 Sept 2020
25 Aug 2020
1 Sept 2020
25 Aug 2020
180 days
Amount
Clearing scrub jungle and disposing away from the site including cost of labour, lead, lift etc complete
Dismantling R.R.masonry work, clearing away the materials from the site as per site Engineer direction
Dismantling the barbed wire fencing clearing away the materials from the site as per site Engineer direction
Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales muram, gravel, stoney earth and earth mixed with small size boulders HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20.B for foundation.
Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales muram, gravel, stoney earth and earth mixed with small size boulders MR & DMR (Not requirng blasting) Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in medium rock and dense medium rock not requiring blasting
Earthwork excavation and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales muram, gravel, stoney earth and earth mixed with small size boulders Hard rock measure in solid including blasting & stacking etc., complete
PCC 1:4:8 using 40mm HBS metal with out formwork for foundation including cost of all materials, labour, lead, lift etc., complete
PCC 1:3:6 using 20mm HBS metal with formwork for foundation including cost of all materials, labour, lead, lift etc., complete
Providing RR masonry in cement mortar 1 : 6 including cost of all material, labour, lead, lift, etc., complete
RCC 1:1.5:3 mix using 12mm to 20mm HBS metal (machine crushed) with formwork including all cost labour materials lead lift curing etc complete but excluding cost of steel reinforcement (By using mixer machine and vibrator) Precast slab
Providing Reinforcement for all R.C.C. Works including cost of steel and all lead, lift, labour for cutting, bending and Placing reinforcement as per plan and Tying with binding wire and including Cost of binding wire, labour and work at all levels etc.
PCC 1:2:4 using 12-20mm HBS metal with formwork for foundation including cost of all materials, labour, lead, lift etc., complete
Brickwork in CM 1:5 mix using IInd class chamber burnt brick of size 9"x 4 1/4"x 2 3/4" including cost of all materials labour lead lift curing etc complete.
Plastering in CM 1:5 mix, 12mm thick including cost of all materials, labour, curing, all lead, lift etc. complete
Pointing with CM 1:3 mix for RR masonry including cost of materials labour lead lift etc complete
Supplying & Fixing RCC ring 60 cm dia, 5 cm thick of height 30 cm, 2 Nos. for covering the earth pit including cost of all materials labour lead lift etc., comp-lete
Refilling with the excavated earth other than sand including watering consilidation in 150 mm layers and forming platform with excess earth etc., complete
Refilling with the gravel including watering consilidation in 150 mm layers and forming platform with excess earth etc., complete
Supplying and Spreading of 12 to 20 mm HBG metal inside yard including cost of all materials labour, lead, lift, etc complete.
Supplying, fabrication and placing in position of MS / GI angle size 50x50x6mm angle inside cable duct and 65x65x6mm for fencing post including cutting bending tying with binding wire and drilling the holes as directed by the site including transportation, labour, lead, lift, etc., complete.
Supplying and fixing of 25 mm dia PVC pipe with 15 kg for CM square pressure including cost of all materials labour, lead, lift, etc complete.
Supplying and fixing of 25 mm dia gun metal gate valve including cost of all materials labour, lead, lift, etc complete.
Colour washing with cement paint over one coat of primerof the retaining wall cable duct wall ionmcluding cosat of allmaterials labour lead lift with etc complete
Supplying fixing of curb stone of size 0.60mX0.20m with a thickness of 2"including cost of all materials, labour lead lift curing etc.,complete
Supplying and fixing of 12 gauge of best quality IOWA GI barbed wire 2ply 4 bars confirm to ISO 278 of IOWA and including of labour charges of tensioning of barbed wire asper drawing No. 168,112 of 8 rows of horizontal and 9 rows verticaly in one bay of 4.5m including cost of GI barbed wire GI binding wire all labour, lead, lift, etc.complete.
Supplying and fixing of 10mm dia eye bolts of 150mm long (Single eye) including of MS rod threading of nut washer etc complete.
Painting all exposed faces of door and windows two coats an approved enamel paint over one coat of primary coat including cost of all materials lead lift labour etc complete.
Chipping the wall surface and clearing the debries away from the site as Engineer at site
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
MAHARAJA CONSTRUCTION
M.RAMALINGAM
V ALAGUDURAI
Sp Constructions
JERALIN JERISH
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .