| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.7 LAccepted-AOC | 1 | Accepted-AOC Lowest Tenderer | |
| 2 | 2₹19.8 L+₹3,338 (0.17%)Rejected-AOC | 2 | Rejected-AOC . |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
10 Feb 2021, 3:00 pmClosed
Project Director
DRDA, Theni
Construction of Drainage with culvert 4 no.s at Selayampatti Main road to Barathi School in Selayampatti panchayat at Theni Block
2021_RDTN_193849_1
2990/2019/D5 Dated 02.02.2021
Open Tender
Civil Works
Item Rate
180 days
Theni
As per tender document
3 documents required · 3 mandatory
₹0
₹20,000
21 Jun 2021
5 Feb 2021
10 Feb 2021
5 Feb 2021
10 Feb 2021
5 Feb 2021
Amount
Construction of Drainage with culvert 4 no.s at Selayampatti Main road to Barathi School in Selayampatti.
Earth work execavation abd depositing on bank with in intial lead of 10 mts and lift of 2 mts in narrow trenches for laying the pipes in all kinds of soils as directed by the departmental officers
Cement Concrete 1:4:8 Using 40 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification.
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Cement Concrete 1:3:6 Using 20 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification.
Supplying Fabricating and placing in position of HSD steel rods for reinforcement including the cost of steel and binding wire etc, complete as per standard specification.
Cement Concrete 1:3:6 Using 40 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification.
Reinforced Cement concrete1:1.5:3 mix by using 20mm HBG metal including all other labourcharges etc complete
Plastering in CM 1:5 12mm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification.
Cement Concrete 1:3:6 Using 20 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
V.Balamurugan
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .