| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC | ₹8.9 L | L1 | Accepted-AOC Lesser than Estimated value |
| 2 | L2₹8.9 L+₹5,535 (0.62%)Rejected-AOC | ₹8.9 L+₹5,535 (0.62%) | L2 | Rejected-AOC Greater than Estimated value |
| Sl No | Description | Qty | Unit | MR.JUSTIN PRATHEEP, CONTRACTOR L2 | MRS.N.M.PUSHPAM, CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Desilting light or sandysoil or silt from infiltration wells below water level including the charges for special T&P and air compressor etc. complete. | 121.5 | 1Cum(One Cubic Meter) | 2,510 ₹3,04,965 | 2,504 ₹3,04,236 Lowest |
| 2.00 | Dewatering using 7.5HP tdiesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete. | 48 | 1Hr (One Hour) | 860 ₹41,280 | 851 ₹40,848 Lowest |
| 3.00 | Supplying and filling up the empty cement gunny
bags with sand, stitching them, conveying the same to site and stacking as directed within a lead of 10m excluding cost of bags, Jute, Thread, needle, sans etc., (Cost os crusher sand 0.0354 X 1944.89 + Empty gunny bag 5.00 + Labour charges 10.05 (W-0115) = 84.21/Bag) | 200 | 1Cum(One Cubic Meter) | 95 ₹19,000 | 83.9 ₹16,780 Lowest |
| 4.00 | Hire charges for deploying earth moving machinery(Poclain) for earthwork including diesel, oil and labour charges etc., complete. | 21 | 1Hr (One Hour) | 2,550 ₹53,550 | 2,544 ₹53,424 Lowest |
| 5.00 | Supply and delivery of 100mm G I PIPES (MEDIUM) AS PER IS 1239/PART I/2004 including cost and conveyance to site and all other incidental charges therefore etc complete | 150 | 1RM (One Running Meter) | 1,075 ₹1,61,250 | 1,069 ₹1,60,350 Lowest |
| 6.00 | Supply and delivery of G.I. SPECIALS AS PER IS 1239/PART II including cost, conveyance and all other incidental charges therefore etc complete -For 100mm G.I. Equal Elbow plain | 12 | 1No (One Number) | 920 ₹11,040 | 915 ₹10,980 Lowest |
| 7.00 | For 100mm G.I.Flange set | 30 | 1No (One Number) | 220 ₹6,600 | 215 ₹6,450 Lowest |
| 8.00 | For 100mm G.I.Bend | 12 | 1No (One Number) | 790 ₹9,480 | 782 ₹9,384 Lowest |
| 9.00 | For 100mm M.S.Clampset | 15 | 1No (One Number) | 740 ₹11,100 | 734 ₹11,010 Lowest |
| 10.00 | Lowering GI pipes and specials in the trenches and laying to proper grade and alignment, jointing with GI Specials and as directed by the TWAD Officers | 150 | 1RM (One Running Meter) | 36 ₹5,400 | 31.8 ₹4,770 Lowest |
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
13 Aug 2026, 3:00 pmClosed
Commissioner
Kalakad Municipal Office
Desilting and Removing the silt in Infiltration well and repairs to Porus Concrte in Vadakarai Pumphouse and Supply, Delivery Submersible pump at Ward No 3in Kalakad Municipality
2026_MAWS_690852_1
1568/2026/E1
Open Tender
Maintenance Works
Works
Kalakad Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11,000
22 Sept 2026
4 Aug 2026
13 Aug 2026
4 Aug 2026
13 Aug 2026
4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Desilting light or sandysoil or silt from infiltration wells below water level including the charges for special T&P and air compressor etc. complete. | 121.5 | 1Cum(One Cubic Meter) | - | - |
| 2 | Dewatering using 7.5HP tdiesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete. | 48 | 1Hr (One Hour) | - | - |
| 3 | Supplying and filling up the empty cement gunny
bags with sand, stitching them, conveying the same to site and stacking as directed within a lead of 10m excluding cost of bags, Jute, Thread, needle, sans etc., (Cost os crusher sand 0.0354 X 1944.89 + Empty gunny bag 5.00 + Labour charges 10.05 (W-0115) = 84.21/Bag) | 200 | 1Cum(One Cubic Meter) | - | - |
| 4 | Hire charges for deploying earth moving machinery(Poclain) for earthwork including diesel, oil and labour charges etc., complete. | 21 | 1Hr (One Hour) | - | - |
| 5 | Supply and delivery of 100mm G I PIPES (MEDIUM) AS PER IS 1239/PART I/2004 including cost and conveyance to site and all other incidental charges therefore etc complete | 150 | 1RM (One Running Meter) | - | - |
| 6 | Supply and delivery of G.I. SPECIALS AS PER IS 1239/PART II including cost, conveyance and all other incidental charges therefore etc complete -For 100mm G.I. Equal Elbow plain | 12 | 1No (One Number) | - | - |
| 7 | For 100mm G.I.Flange set | 30 | 1No (One Number) | - | - |
| 8 | For 100mm G.I.Bend | 12 | 1No (One Number) | - | - |
| 9 | For 100mm M.S.Clampset | 15 | 1No (One Number) | - | - |
| 10 | Lowering GI pipes and specials in the trenches and laying to proper grade and alignment, jointing with GI Specials and as directed by the TWAD Officers | 150 | 1RM (One Running Meter) | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_830630.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_830630.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .