Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹42.8 LAccepted-Finance | ₹42.8 L | 1st | Accepted-Finance As per the comparative |
| 2 | 2nd₹44.0 L+₹1.2 L (2.82%)Accepted-Finance | ₹44.0 L+₹1.2 L (2.82%) | 2nd | Accepted-Finance As per the comparative |
| 3 | 3rd₹46.2 L+₹3.3 L (7.80%)Accepted-Finance | ₹46.2 L+₹3.3 L (7.80%) | 3rd | Accepted-Finance As per the comparative |
Tender Value
₹51.3 L
EMD Value
₹1.0 L
Closing Date
2 Dec 2020, 4:00 pmClosed
Executive Engineer RnB Div leh
Executive Engineer RnB Division Leh
Construction of compound walling at NTPHC Primary Health Centre Phyang under District Plan
2020_PWD_1561_1
E Tender 62 of RnB Division Leh
Open Tender
Civil Works - Others
Item Rate
30 days
Leh
As per NIT
5 documents required · 5 mandatory
₹2,000
Yes
Payable To Executive Engineer RnB Division Leh
₹1.0 L
Yes
17 May 2021
26 Nov 2020
4 Dec 2020
26 Nov 2020
2 Dec 2020
26 Nov 2020
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed: All kinds of soil
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers and rolling every third and top-most layer with power roller of minimun 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, guide banks etc. lead upto 50 mtr. and lift upto 1.5 mtr. in : All kinds of soil
Earth work in excavati..;n by mechanical means in trenches for foundation. All kinds of soil
Ordinary rock.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) crushed including carriage complete job
Random Rubble masonry with hard stone from qyarry in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement: 6 coarse sand: 12 graded stone aggregate 20mm nominal size) upto plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand) including carriage complete job
Providing and laying damp-proof course 5Crnm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand 4 graded stone aggregate 20mm nominal size ) crushed including carriage complete job
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand)
M/S SONAM RIGZIN
M/S SHAKIL AHMAD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .