| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.9 CrAccepted-AOC 14 BILASIPARA P O P S BILASIPARA DIST DHUBRI ASSAM PIN 783348 | DHUBRI | ASSAM | 783348 | L1 | Accepted-AOC Accepted by BEC | |
| 2 | l2₹58.5 Cr+₹60.2 L (1.04%)Rejected-Finance BADRI RAI COMPANY ARUN KUMAR RAI DULIAJAN STATION ROAD P O DULIAJAN P S DULIAJAN DIBRUGARH PIN 786602 | DULIAJAN | DIBRUGARH | ASSAM | 786602 | l2 | Rejected-Finance Rejected by BEC | |
| 3 | Not Admitted-Fee/PreQual/Technical HAIBARGAON NAGAON ASSAM | NAGAON | ASSAM | 782001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹61.6 Cr
EMD Value
₹1.2 Cr
Closing Date
3 Apr 2024, 2:00 pmClosed
CE PWD(Boarder Roads and NEC Works) ASSAM
O/o the Chief Engineer,Border Roads,PWRD Assam, Chandmari, Guwahati-03
Dibrugarh/CRIF/2023-24/02 Construction of RCC Bridge over River Buridehing at Romaighat including Approaches and Protection work in Lahowal LAC (Bridge Length 360m (6X60m).
2024_PWD_37222_1
Dibrugarh/CRIF/2023-24/02
Open Tender
Civil Works
Item Rate
730 days
Dibrugarh
Please refer Tender documents.
4 documents required · 4 mandatory
₹30,000
₹1.2 Cr
Yes
O/o the CE Boredr Roads,PWRD Assam,chandmari
16 Nov 2024
14 Mar 2024
4 Apr 2024
14 Mar 2024
3 Apr 2024
14 Mar 2024
14 Mar 2024 - 2 Apr 2024
27 Mar 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting of Trees, including Cutting of Trunks, Branches and Removal
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.
Girth above 300 mm to 600 mm | 75 | No. | 362.95 | ₹27,221.25 |
| 2 | Cutting of Trees, including Cutting of Trunks, Branches and Removal
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.Girth above 600 mm to 900 mm | - | No. | 723.52 | - |
| 3 | Cutting of Trees, including Cutting of Trunks, Branches and Removal
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.Girth above 900 mm to 1800 mm | - | No. | 1,297.1 | - |
| 4 | Cutting of Trees, including Cutting of Trunks, Branches and Removal
Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit. Girth above 1800 mm to 2700mm | - | No. | 2,365.72 | - |
| 5 | Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means, Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3.0m and lead upto 1000 m as per Technical Specification Clause 301.4. | - | Sqm | 10.71 | - |
| 6 | Clearing and grubbing road land
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned up to lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm thickness.
By Mechanical Means
In area of light jungle | 0.2 | Hac | 43,095.85 | ₹8,576.07 |
| 7 | Compacting Original Ground
Compacting original ground supporting embankment
Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 1 | Cum | 71.4 | ₹71.33 |
| 8 | Compacting Original Ground
Compacting original ground supporting subgrade
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 1 | Cum | 113.05 | ₹112.94 |
| 9 | Excavation in Ordinary Soil
Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines,grades and cross sections. | 1 | Cum | 139.23 | ₹139.09 |
| 10 | Excavation in Marshy Soil
(Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity including cutting and loading in tippers and disposal with in all lifts and lead upto 1000 metres, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections.) | - | Cum | 133.28 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_60675.xls
BOQ • 0.31 MB
141963018.pdf
Tender Documents • 4.02 MB
141963020.pdf
Tender Documents • 0.31 MB
141963023.html
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .