Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L3₹2.0 Cr+₹41.5 L (26.3%)Accepted-AOC HOUSE NO 16 WARD NO 4 JORHAT ASSAM | JORHAT | ASSAM | 785001 | ₹2.0 Cr+₹41.5 L (26.3%) | L3 | Accepted-AOC proper |
| 2 | L1₹1.6 CrRejected-AOC KURUA BAHI SATRA BOKAKHAT GOLAGHAT ASSAM | BOKAKHAT | GOLAGHAT | ASSAM | ₹1.6 Cr | L1 | Rejected-AOC NOT QUALIFIED FOR AOC |
| 3 | L2₹1.6 Cr+₹7,974.25 (0.05%)Rejected-AOC P O KURUABAHI SATRA P S BOKAKHAT DIST GOLAGHAT ASSAM | GOLAGHAT | ASSAM | 785601 | ₹1.6 Cr+₹7,974.25 (0.05%) | L2 | Rejected-AOC NOT QUALIFIED FOR AOC |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
14 Oct 2020, 2:00 pmClosed
Addl. Chief Engineer, UAZ, W.R. Deptt., Dibrugarh
Addl. Chief Engineer, UAZ, W.R. Deptt., Dibrugarh
Raising and Strengthening to Brahmaputra Dyke from Negheriting to Rongagorah from Ch. 0 Km to 23th Km
2020_DoWR_18798_1
JOR/RIDF/RONGAGORAH/2020-21/1
Open Tender
Civil Works
Works
90 days
Jorhat
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
The Executive Engineer, Jorhat W. R. Division
₹4.0 L
Yes
29 Oct 2020
25 Sept 2020
16 Oct 2020
25 Sept 2020
14 Oct 2020
8 Oct 2020
Amount
Medium Jungles : Clearing medium jungles and trees up to 15cm girth including cutting, uprooting roots and stumps, removing them from the site of the work, etc. complete as diracted. (When 30% to 60% of the area is covered by shrubs, trees etc)
Cutting bamboo , uprooting roots & stumps including removing them from the site of work, etc. complete as directed.
Earth work in embankment by truck carriage in ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 22cm. thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 2.5cm cube, dressing as per design section including payment of forest royalty if any, etc. complete as directed.(10% deduction will be made from the section measured quantities of the completed and compacted on account of shrinkage)For initial lead beyond 1/2 Km and up to 4 Km and for all lifts.
Labour for ramming with cast iron rammer to proper compaction including watering if necessary , etc. complete as directed. Ordinary soil.
Supply of ordinary labour inclusive of all taxes.
Construction of temporary shed two roofed with mud plinth of 0.45m height above ground level with Bhaluka bamboo posts 1.5m apart driven at least 0.75m below ground and height above plinth 2.50m spilt Jati bamboo walls mud plastering , white washing two coats, 10 cm thick thatch roofing over bamboo rua frame placing at 0.15m clear apart fitted with bamboo kamies frame binding doors and windows with Bamboo chattai strengthening with bamboo frame binding with wire etc. complete as directed.( Using Bhaluka Bamboo at the rate of 6.00nos/Rm & Jati Bamboo at the rate of 61.00nos/Rm.)
Deben Rajkhuwa
M/S STAR CONSTRUCTIONS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .