| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.9 LAccepted-AOC 5 59 DR MGR NAGAR THIRUMURUGAPOONDI | TAMIL NADU | L1 | Accepted-AOC ok | |
| 2 | L2₹30.4 L+₹1.4 L (4.97%)Rejected-Finance | L2 | Rejected-Finance Reject |
Tender Value
Refer Docs
EMD Value
₹34,650
Closing Date
4 Jul 2023, 3:00 pmClosed
The Executive Officer
66, Perumal Kovil street, Olagadam
Strengthing of BT Road Ward No12 Vedikkaranpalayam Mariamman kovil street Ward No14 Vedikkaranpalayam West Street Ward No6 Chinna Karukkupalayam
2023_DTP_329726_1
95/2023
Open Tender
Civil Works - Roads
Works
180 days
Olagadam Town Panchayat Office
Class 2
2 documents required · 2 mandatory
₹0
₹34,650
Yes
Olagadam Town Panchayat office
16 Mar 2024
19 Jun 2023
4 Jul 2023
19 Jun 2023
4 Jul 2023
20 Jun 2023
23 Jun 2023
Amount
Providing and Laying Wet Mix Mecadam using 0.396m3 of 45-22.40mm graded metal, 0.528m3 of 22.40-2.36mm graded metal and 0.396m3 of 2.36 and below size graded metal premixed with water to a densemass on a prepared subgrade / base to template in uniform 15cm Consolidated thickness and consolidation with Vibratory roller of 8 to 10 tonne capacity in stages to proper grade and camber rolling with protecting edges, etc completing with MORTH specification Clause 406.
Providing and laying Prime Coat over WBM/ WMM Surface using 7Kg of Emulsion Bitumen (SSI) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying Prime Coat over WBM/ WMM Surface using 2Kg of Emulsion Bitumen (RSI) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and laying Bituminous Concrete 40mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27kgs of 60/70 Grade Bulk bitumen and 5.03 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providing and laying Well Gravel to the specified thick including cost and conveyance of Well gravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH
THIRU MURUGAN CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .