| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC | ₹13.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.4 L+₹16,150 (1.22%)Rejected-Finance | ₹13.4 L+₹16,150 (1.22%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | DHANAPAL CONSTRUCTIONS L2 | ARK Construction L1 |
|---|---|---|---|---|---|
| 1.00Providing Retaining wall and Single Barrier arrangements | |||||
| 1.01 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 126 | m3 | 115 ₹14,490 | 105 ₹13,230 Lowest |
| 1.02 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 7 | m3 | 1,750 ₹12,250 | 1,720 ₹12,040 Lowest |
| 1.03 | Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28) | 14 | m3 | 5,730 ₹80,220 | 5,700 ₹79,800 Lowest |
| 1.04 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 171 | m2 | 700 ₹1,19,700 | 640 ₹1,09,440 Lowest |
| 1.05 | Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone
jelly) using 20mm size hard broken stone jelly for dummy columns,etc., excluding cost
of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. ( Dummy columns should be at least 1 metre height) -Mixing by manual means | 90 | m3 | 6,640 ₹5,97,600 | 6,620 ₹5,95,800 Lowest |
| 1.06 | Providing and erecting Single sided Single Guard Metal
Beam Crash Barrier System (Type - A, “W” Single
Guard)1.80m high, comprising of 3mm thick wall “W”
beams posts and spacer channels shall be made by cold
roll forming using HR conform to IS 5986 Fe 410/360
and dip galvanized having Zinc Mass of 550gms/ sqm,
minimum 700 mm above road/ ground level fixed
on ISMC series channel vertical post 150x75x5mm
spaced 2m center to center 312mm x 83mm flange
width x 3mm thick, 4318mm long post directly embedded
in the concrete (M15) pit size 350x350x800mm for a
depth of 1100mm below ground. All fixing bolts and nuts
hot dip galvanized conforming to IS:1367 clause 4.60 all
complete as per Technical Specification of IRC 119 2015
and as directed by the Engineer-in-charge | 110 | m | 4,700 ₹5,17,000 | 4,680 ₹5,14,800 Lowest |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
15 Dec 2025, 3:00 pmClosed
Commissioner Nagercoil City Municipal Corporation
City Municipal Corporation Office Nagercoil 629001 Ph.No. 04652230984
Nagercoil Corporation Providing Retaining wall and Single Barrier arrangements in Vaithiyanathapuram at Ward no.40
2025_MAWS_628343_1
406/2025-26/AEE
Open Tender
Civil Works
Lump-sum
90 days
Nagercoil Corporation Providing Retaining wall and
Registered Contractor
3 documents required · 3 mandatory
₹0
₹16,000
7 Jan 2026
2 Dec 2025
15 Dec 2025
2 Dec 2025
15 Dec 2025
2 Dec 2025
Amount
Providing Retaining wall and Single Barrier arrangements
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28)
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38
Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 20mm size hard broken stone jelly for dummy columns,etc., excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. ( Dummy columns should be at least 1 metre height) -Mixing by manual means
Providing and erecting Single sided Single Guard Metal Beam Crash Barrier System (Type - A, “W” Single Guard)1.80m high, comprising of 3mm thick wall “W” beams posts and spacer channels shall be made by cold roll forming using HR conform to IS 5986 Fe 410/360 and dip galvanized having Zinc Mass of 550gms/ sqm, minimum 700 mm above road/ ground level fixed on ISMC series channel vertical post 150x75x5mm spaced 2m center to center 312mm x 83mm flange width x 3mm thick, 4318mm long post directly embedded in the concrete (M15) pit size 350x350x800mm for a depth of 1100mm below ground. All fixing bolts and nuts hot dip galvanized conforming to IS:1367 clause 4.60 all complete as per Technical Specification of IRC 119 2015 and as directed by the Engineer-in-charge
DHANAPAL CONSTRUCTIONS (BID ID -1532295)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_751275.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.05 MB
BOQ_751275.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .