| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96.2 LAccepted-AOC KENDRA DALURBANDH KENDRA BURDHAN BARDHAMAN BARDHAMAN 713380 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713380 | ₹96.2 L | L1 | Accepted-AOC TCR |
| 2 | L2₹98.2 LRejected-Finance PANDANESWAR BARDHAMAN BARDHAMAN 713346 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713346 | ₹98.2 L | L2 | Rejected-Finance TCR |
| Sl No | Description | Qty | Unit | SINHA ENTERPRISES L1 | SWAPAN KUMAR AKHULI L2 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 2.00 | Transportation & installation of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-624mtr @68Kg/mtr =42.43MT +11 times Tail end shifting(extension)-11MT= total weight =75.03 MT | 75.03 | MT | 26,421 ₹19,82,367.63 | 26,949 ₹20,21,983.47 |
| 3.00 | Fitting of tail end and discharge scraper. | 4 | Nos | 1,218 ₹4,872 | 1,242 ₹4,968 |
| 4.00 | Belt laying including transporting of belt, jointing, tensioning, trail run etc | 1,260 | Mtr | 558 ₹7,03,080 | 569 ₹7,16,940 |
| 5.00 | Foundation bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos | 120 | Nos | 448 ₹53,760 | 457 ₹54,840 |
| 6.00 | Cleaning of coal & unused materials before installation job | 1 | LS | 20,711 ₹20,711 | 21,125 ₹21,125 |
| 7.00 | Making, and fabrication of tail end frame | 1 | Nos | 28,981 ₹28,981 | 29,561 ₹29,561 |
| 8.00 | Making of new base frame for dual drive unit consists of 2nos motor 2 no gear 2nos drum at surface workshop with proper alignment. | 1 | Nos | 2,13,831 ₹2,13,831 | 2,18,108 ₹2,18,108 |
| 9.00 | Making and fabrication of new discharge unit | 1 | Nos | 87,960 ₹87,960 | 89,719 ₹89,719 |
| 10.00 | Making, and fabrication of Load table | 1 | Nos | 28,131 ₹28,131 | 28,694 ₹28,694 |
Tender Value
₹96.2 L
EMD Value
₹1.2 L
Closing Date
28 Oct 2024, 6:00 pmClosed
General Manager
Office of The General Manager Bankola Area, PIN-713363
Installation and commissioning of conveyor Belt in RVIIB seam for LHCM4 Package at Nakrakonda Kumardihi B Colliery under Bankola Area.(03 Nos.)
2024_ECL_318798_1
ECL/GM/BA/E TENDER/24-25/EnM/190 Dt 07.10.2024
Open Tender
Electrical and Maintenance Works
120 days
Nakrakonda Kumardihi B Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹1.2 L
5 Mar 2026
7 Oct 2024
29 Oct 2024
7 Oct 2024
28 Oct 2024
7 Oct 2024
7 Oct 2024 - 11 Oct 2024
Amount
Item Description/ Heading
Transportation & installation of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-624mtr @68Kg/mtr =42.43MT +11 times Tail end shifting(extension)-11MT= total weight =75.03 MT
Fitting of tail end and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning, trail run etc
Foundation bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos
Cleaning of coal & unused materials before installation job
Making, and fabrication of tail end frame
Making of new base frame for dual drive unit consists of 2nos motor 2 no gear 2nos drum at surface workshop with proper alignment.
Making and fabrication of new discharge unit
Making, and fabrication of Load table
Fencing of drive ,loop take up & tail end .
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables.
Dismanlting of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-624mtr @68Kg/mtr =42.43MT = total weight =64.03 MT
Taken out and coiling of belt
Cost of M.S. Nut bolts & washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame , Loop take up base & discharge base cement concrete
Transportation & installation of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-208mtr @68Kg/mtr =14.14MT+3 times Tail end shifting(extension)- 3MT= total weight =38.74 MT
Fitting of tail end , mid belt and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning, trail run etc
Foundation bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos
Cleaning of coal & unused materials before installation job
Making and fabrication of Load table
Fencing of drive ,loop take up & tail end .
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables.
Dismantling of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-208mtr @68Kg/mtr =14.14MT= total weight =35.74 MT
Taken out and coiling of belt
Cost of M.S. Nut bolts & washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame , Loop take up base & discharge base cement concrete
Transportation & installation of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-130mtr @68Kg/mtr =8.84MT+2 times Tail end shifting(extension)- 2MT= total weight =32.44 MT
Fitting of tail end , mid belt and discharge scraper.
Belt laying including transporting of belt, jointing, tensioning, trail run etc
Foundation bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos
Cleaning of coal & unused materials before installation job
Making and fabrication of Load table
Fencing of drive ,loop take up & tail end .
Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables.
Transportation & installation of complete drive drum driven drum with gear motor base frame -10.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-130mtr @68Kg/mtr =8.84M = total weight =30.44 MT
Taken out and coiling of belt
Cost of M.S. Nut bolts & washers
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame , Loop take up base & discharge base cement concrete
Total impact of GST for the purpose of CTC
SWAPAN KUMAR AKHULI (BID ID -1095143)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid