| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC | L1 | Accepted-AOC AOC Issued | |
| 2 | L2₹6.0 L+₹2,121.84 (0.36%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | PRIYA L1 | Selvamuthukumar L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. (Column, Grade beam alround, Cross wall, Steps, Ramp(0.6+0.3)/2 and D/F Foundation) | 14.75 | Nos | 246 ₹3,628.5 Lowest | 250 ₹3,687.5 |
| 2.00 | Supplying and filling in foundation and basement with m.sand in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification (Column, Grade beam alround, Cross wall, Steps, Ramp(0.6+0.3)/2 and D/F Foundation) | 4.25 | Nos | 2,060.1 ₹8,755.43 Lowest | 2,100 ₹8,925 |
| 3.00 | Supplying and filling in foundation and basement with Conveyance Earth in layers not more 15 cm thick including ramming, watering and compacting etc.complete complying to standard specification (Basement ) | 11.25 | Nos | 44.1 ₹496.13 Lowest | 50 ₹562.5 |
| 4.00 | Cement Concrete 1:4:8 mix using 40 mm HBG metal for foundaion including watering wherever necessary and laid in layers of not more than 15cm thick. Compacting etc., complete complying with standard specifications and as directed by the departmental officers etc, complete. (Column, Grade beam alround, Cross wall, Steps, Ramp(0.6+0.3)/2 and D/F Foundation) | 4.25 | Nos | 5,828 ₹24,769 Lowest | 5,828.09 ₹24,769.38 |
| 5.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. (Up to Basement, Main wall alround, Cross wall, D/F Column and Steps – 1 to 6) | 7.52 | Nos | 6,050.1 ₹45,496.75 Lowest | 6,050.39 ₹45,498.93 |
| 6.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications.(Super Structure) (Alround wall, side wall(0.20+0.0)/2, Parapet Wall & Name board) | 6.4 | Nos | 6,137 ₹39,276.8 Lowest | 6,137.18 ₹39,277.95 |
| 7.00 | Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification. | 0.87 | Nos | 89,988.2 ₹78,289.73 Lowest | 89,988.6 ₹78,290.08 |
| 8.00 | Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers Lintels, Staircase waist slabs, Landing slabs, Landing beam, Portico beam etc.) (Column up to grade beam, Column up to Basement, Grade beam side alround, Grade beam Cross wall, Cross wall & plinth beam) | 27.56 | Nos | 516.5 ₹14,234.74 Lowest | 516.5 ₹14,234.74 Lowest |
| 9.00 | Column up to Lintel (seating beam & slab, beam side, Inner side, bottom beam front) | 57.79 | Nos | 1,033 ₹59,697.07 Lowest | 1,033 ₹59,697.07 Lowest |
| 10.00 | Rainforcement Cement Concrete 1:1/5:3 using 20 mm ISS HBG metal for all RCC item of works excluding cost of reinforcement and fabricating charges, centering and shuttering but icluding curing and providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary and bearing surfaces of walls, sides and bottom of the slabs, beams, etc., shall be finished smooth with cement mortar 1:3, 12mm thick and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications. Column up to Roof beam, Column footing, Column up to grade beam, Column up to Basement, Grade beam, Grade beam Cross wall and plinth beam) | 4.33 | Nos | 9,639 ₹41,736.87 Lowest | 9,639 ₹41,736.87 Lowest |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
29 Sept 2025, 6:50 pmClosed
Block Development Officer(B.P), Kumaratchi
Block Development Officer(B.P), Kumaratchi
Construction of Bus Shelter at Near High Level Bridge in Perampattu Panchayat under MLACDS 2025-2026
2025_RDTN_606832_1
MLACDS092025
Open Tender
Civil Works
Works
120 days
PU-Kumaratchi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
Yes
31 Oct 2025
22 Sept 2025
29 Sept 2025
22 Sept 2025
29 Sept 2025
22 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_725316.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .