| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAccepted-AOC | ₹5.1 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹6.0 Cr+₹94.1 L (18.5%)Rejected-Finance NO 7Y SETHUPATHAI ROAD KRISHNARAJAPURAM MAIN THOOTHUKUDI 628002 | TUTICORIN | TAMIL NADU | 628002 | ₹6.0 Cr+₹94.1 L (18.5%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹6.4 Cr+₹1.3 Cr (25.1%)Rejected-Finance 4 324M MAIN ROAD VANNICONENDAL TIRUNELVELI DISTRICT 627951 | TIRUNELVELI | TAMIL NADU | 627951 | ₹6.4 Cr+₹1.3 Cr (25.1%) | L3 | Rejected-Finance Rejected |
Tender Value
₹5.1 Cr
EMD Value
₹2.7 L
Closing Date
13 Dec 2023, 5:00 pmClosed
Chief Engineer
Fishing Harbour Project Circle , Integrated office Complex, Animal Husbandry and Fisheries and Fishermen Welfare Department, Nandanam, Chennai35
Construction of RMS Wall at Nagore Keezhapattinachery in Nagapattinam District
2023_AHDF_397229_1
03 - 08 /DB/F.114 N/2023
Open Tender
Civil Works
Lump-sum
180 days
Nagapattinam
As Mentioned in PQ Document
4 documents required · 4 mandatory
₹0
₹2.7 L
7 Feb 2024
7 Dec 2023
14 Dec 2023
7 Dec 2023
13 Dec 2023
7 Dec 2023
Amount
Earth work open excavation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and boiling water wherever necessary and depositing the surplus earth within the compound in places shown by departmental officers with an initial lead of 10m and life of 2 m and clearing and levelling etc complete complying with standard specification
Supplying and filling of Gravel including watering tamping, etc complete as per standard specification.
Providing and Filling in foundation with Soling stone / trap broken metal 40mm to 80mm. and down size, with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift. complete as per specifications.
Formation of Filter layer for rubble mound groin with quarry run hard blue granite stone of weight 10 Kg to 50 kg having a specific gravity of not less than 2.65 as per approved design and drawing including quarrying, loading, transporting by tippers/lorries weighing in the electronic weigh bridge for measurement, dumping, placing in position to required level, profile and finishing the side slopes 1 : 2 on both sides with necessary equipment and devices as per the drawing and specification etc., complete as directed by the departmental officers. The rate is also inclusive of placing, sectioning and finishing with necessary equipment and devices and hire and operational changes of tools and plants etc ( The payment shall be made on weight basis (ie) laden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge.
Formation of Core layer for rubble mound groin with hard blue granite stone of weight ranging from 50 Kg to 100 kg having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 : 2 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the departmental officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge.
Formation of Armour layer for rubble mound groin with hard blue granite stone of weight ranging from 250 kg to 500 kg having a specific gravity of not less than 2.65 and as nearly cubical as possible as per approved design and drawing. The rate is inclusive of quarrying, loading at quarry using crane and other tools and plants as required, transporting by tippers/ lorries weighing on the electronic weigh bridge for measurement, Unloading/dumping placing in position to required level, profile and finishing the side slopes of 1 : 2 using crane and floating equipment and devices as per the drawing and specification etc., complete and as directed by the departmental officers. The rate is inclusive of placing sectioning and finishing with necessary equipments and devices and hire and operational charges of tools and plants etc. (The payment shall be made on weight basis (ie) ladden weight minus unladden weight). The contractor has to make his own arrangements for weigh bridge.
Sand gravel mix 1:1 including watering tamping,and consolidated by power roller etc complete as per standard specification.
Providing WBM For 75mm thick in Bottom layer laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per Specifications.
Providing WBM For 75mm thick in top layer laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per Specifications.
Sub Total Amount for above all items (excluding GST)
GST 18% for above SubTotal Amount
PUNITHA THANAPANDIAN
AVS CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .