Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.6 L+₹53,818.76 (5.33%)Rejected-Finance R O AT VILL BHADIWA POST AMBA DISTT VARANASI UP 221104 | VARANASI | VARANASI | UTTAR PRADESH | 221104 | L2 | Rejected-Finance L2 | |
| 3 | L3₹10.8 L+₹71,039.16 (7.04%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹10.9 L+₹77,889.81 (7.72%)Rejected-Finance MO PATEL NAGAR ORAL | ORAI | L4 | Rejected-Finance L4 | |
| 5 | L5₹11.1 L+₹1.0 L (9.94%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹12.5 L
EMD Value
₹25,000
Closing Date
12 Jul 2023, 12:00 pmClosed
E.E. B.C.D.- 1, ORAI
E.E. B.C.D.- 1, ORAI
Estimate of construction of boundary wall of Imiliya Inspection House under Betwa Canal Division -I
2023_UPIDC_814760_19
N-21/BCD-1/1001, Date 13-06-2023
Open Tender
Civil Works
Item Rate
90 days
Estimate of construction of boundary wall of Imili
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹25,000
19 Jul 2023
7 Jul 2023
12 Jul 2023
7 Jul 2023
12 Jul 2023
7 Jul 2023
Amount
Site Clearance by Cutting heavy under growth and bushes upto 7.5 cm diameter inclunding removal of roots with removal and collection.
Earth work in Mar, Rankar and Kanker mixed soil including lift upto 1.50m and lead upto 30m with filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30m from the foundation trenches.
Lean P.C.C. 1:3:6 with Stone Grit (20-40 mm) size including all cost of material and lobour,t&p etc. for proper completion of work.
C.C 1:2:4 in foundation including laying, ramming, curing & mechanical vibration including all cost material labour and T&P etc.
Centering & Shuttering for C.C./R.C.C. work i/c rent of shuttering material, labour and T&P required for proper completion of work.
Bending, binding, cutting & placing reinforcement i/c cost of binding wire cost of steel, labour, T&P etc. required for proper completion of work.
Laying R.C.C.M-25(1:1.5:3) with cement, C-Sand and crushed hard stone grit i/c cost of all material, labours, T&P etc. required for proper completion of the work.
Fabrication of mild steel including cutting .driling .welding where necessary and fixing in positation including all cost of lead &etc.for proper completion of work . With one coat of red oxide primer . But excluding cost of cement concret fixing.
Painting two coat of synthetic enamel paint on New steel surface with superior quality approved make & mentioned including cost of all material, labour, T&P etc. required for proper completion of work.
Supplying & fixing of Precast Boundary wall of M-20 Grade(1:1.5:3) with column spacing of 1.80 m c/c including all cost material labour and T&P etc. As per instruction Of Engineer-in-Charge
P/Afor two coat of Exterior Emulsion including primer on new surface As per instruction of Engineer-in-Charge (Make Asian apex Ultima, Berger All weather Guard & equ.)
A K CONSTRUCTION COMPANY
M/S N.K. CONTRACTOR AND SUPPLIER
Sanjay Tiwari
RAJVEER CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .