Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹41.9 Laccepted-aoc | ₹41.9 L | accepted-aoc |
Tender Value
₹49.4 L
EMD Value
₹83,791
Closing Date
29 Jun 2026, 9:30 pmClosed
Directorate of Municipal Administration
Riyaz Ahmed Hubballi
Construction of Road & drain in Sangollirayanna nagar, Bheemambika layout & Bhovi plot at w.no.20
DMA/2026-27/OW/WORK_INDENT58605
DMA/2026-27/OW/WORK_INDENT58605
Open
Other Works
Electronic Documents, First(One Cover)
DMA City Corporation Hubballi-Dharawada
₹1,240
₹83,791
29 Jun 2026
12 Jun 2026
22 Jun 2026
Construction of Road & drain in Sangollirayanna nagar, Bheemambika layout & Bhovi plot at w.no.20
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and te...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Providing and laying in position Cement Concrete for all Sub structures ofbuilding, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. Th...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Addendum I Additionalities for Formwork, Centering & Scaffolding for Cement Concrete Drain Walls 35% Percentage on finished rate of concrete per m3 (SL No-4)SR 2023-24 P.No.111(Volume-1)
Addendum I Additionalities for Formwork, Centering & Scaffolding for Solid Slab Super Structure 20% Percentage on finished rate of concrete per m3 (SL No-1)SR 2023-24 P.No.112(Volume-1)
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and te...
Wet Mix Macadam (Plant Mix Method)Providing, laying, spreading and compacting graded stoneaggregate to wet mix macadam specification including premixingthe Material with water at OMC inmechanical mix ...
Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential ...
Providing and laying Cement concrete pavement with 1:2:4 for commercial & residential building floors, hardpaths, footpaths using 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size...
Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bra...
Ready Mix Concrete (RMC) with Cement & Cementitious Materials. Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in al...
Centering & Shuttering :FOOTINGS: Additionalities for formwork,centering &scaffolding - Appendix I- 8% (SL No- )SR 2023-24 P.No.115 (Volume-1)
Centering & Shuttering :Earth Retaining Structures: Additionalities for formwork,centering &scaffolding - Appendix I- 10% (SL No- )SR 2023-24 P.No.115(Volume-1
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towar...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work SR 2023-24 P.No.17/3.1(Volume-3)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
58605 kw-2 doc.doc
Tender Document • 4.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .