| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 CrAccepted-AOC | ₹6.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.8 Cr+₹23.2 L (3.51%)Rejected-AOC | ₹6.8 Cr+₹23.2 L (3.51%) | L2 | Rejected-AOC L2 |
Tender Value
₹7.0 Cr
EMD Value
₹14 L
Closing Date
26 Feb 2019, 11:00 amClosed
SE ICC MAHOBA
Office of the SE ICC, BAJARIYA MAHOBA
EARTH WORK AND PUCCA WORK OF ICHAULI MINOR IST FROM KM 0.00 TO 5.650 AT KABRAI MAIN CANAL (LOT-10)
2019_UPIDC_311539_10
12/SE/2018-19
Open Tender
Civil Works
Item Rate
180 days
MAHOBA
AS PER NIT AND TENDER DOCUMENT
2 documents required · 2 mandatory
₹2,354
EE IRRIGATION CONSTRUCTION DIVISION
₹14 L
Yes
Office of the SE ICC, BAJARIYA MAHOBA
24 May 2021
18 Feb 2019
26 Feb 2019
18 Feb 2019
26 Feb 2019
18 Feb 2019
20 Feb 2019
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work.
E/W in filling in MKR and Kankar mixed soil with lead up to 1 km including mechanical compaction, watering, leveling & dressing with required for proper completion of work etc. including all tax like Income tax, Labour cess etc but excluding G.S.T.
E/W in cutting in MKR and Kankar mixed soil with initial lead & given lift including labour T&P required for proper completion of work etc. including all tax like Income tax, Labour cess etc but excluding G.S.T.
E/W Excavation of foundation with mar, kabar,& kankar mixed soil including lead & lift with disposal of earth as per direction of site Engineer. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Supply & Laying coarse sand in foundation including all cost of material ,labour ,T&P etc. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying A40 M10 concrete by mechanical mixing and mechanical, vibrating ,cement consumption of 4.30 bags per cum. including cost of all material , labour, T&P all lead and lift for proper completion of job as per direction of Engineer -in-charge. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying A20 M15 concrete by mechanical mixing and mechanical, vibrating ,cement consumption of 6.10 bags per cum. including cost of all material , labour, T&P all lead and lift for proper completion of job as per direction of Engineer -in-charge. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying A20 M25 Reinforcement cement concrete by mechanical mixing and mechanical vibrating ,cement consumption of 11.10 bags per cum. including costof all material but excluding cost of steel , labour, T&P all lead and lift for proper completion of job as per direction of Engineer -in-charge. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying A20 M20 Reinforcement cement concrete by mechanical mixing and mechanical, vibrating, cement consumption of 7.90 bags per cum. including cost of all material but excluding cost of steel, labour, T&P all lead and lift for proper completion of job as per direction of Engineer -in-charge. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying A20 M15 Reinforcement cement concrete by mechanical mixing and mechanical, vibrating, cement consumption of 6.10 bags per cum. including cost of all material, labour, T&P all lead and lift for proper completion of job as per direction of Engineer -in-charge. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing and laying steel reinforcement including cost of steel , cutting ,bending , placing in position , binding with G I wire,& welding etc including all cost of material , labour ,T&P and all lead and lifts for proper completion of job as per direction of Engineer-in-charge. including all tax like Income tax, Labour cess etc but excluding G.S.T.
providing and fixing Centering & shuttering for RCC work including all cost of material , labour ,T&P and all lead and lifts for proper completion of job as per direction of Engineer - in - charge . including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying & fixing joint filter board 20mm including cost of sealing compound labour T&P etc required proper completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing & fixing drainage spout pipe and G. I 100mm dai including cost of material, labour, T&P etc, required for proper completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing & fixing wheel guard including cost of labour ,T&P etc required for proper completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Earth work in filling for making diversion in all type of soil including all lead & lifts ,labour charge ,T&P with mechanical compaction dressing ,proper completion of work . including all tax like Income tax, Labour cess etc but excluding G.S.T.
Supply & laying Stone ballast 25 to 50 mm over earth filling at diversion road including all cost of material ,labour , T&P ,etc including all tax like Income tax, Labour cess etc but excluding G.S.T.
supply & laying mooram over 25-50 stone ballast at diversion road including all cost of material ,labour , T&P ,etc. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Earth work in removal of diversion ramp / approach road on all type of soil including all lead and lift ,labour charges ,T&P with disposal of all type soil , dressing and manual compaction with proper completion of work. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Earth Work in Back Filling with all cost of labour T&P etc all complete etc. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Random course rubble Stone masonry in 1;4 cement , sand motar including all cost of material ,labour T& P and all lead & lifts for proper completion of job as per direction of Engineer-in-charge. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Raised or struck pointing on stone masonry 1:2 cement sand mortar including all cost of material, labour T&P and all lead & lifts for proper completion of job as per direction of Engineer-in-charge. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying A20 M20 cement concrete by mechanical mixing and mechanical, vibrating, cement consumption of 7.90 bags per cum. including cost of all material but excluding cost of steel, labour, T&P all lead and lift for proper completion of job as per direction of Engineer -in-charge. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Supply & Laying stone grit 40 mm size in inverted filter including cost of all material but excluding cost of steel , labour, T&P all lead and lift for proper completion of job as per direction of Engineer -in-charge. including all tax like Income tax, Labour cess etc but excluding G.S.T.
20 mm thick cement grouted pitching left & right side of sump including all cost of material labour T&P etc. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Construction Network India
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .