Tender Value
₹5.5 Cr
EMD Value
₹10.9 L
Closing Date
5 Oct 2026, 11:00 am
XEN CP3 SEC 16 CHD
O/o XEN CP3 SEC 16 CHD
CONSTRUCTION OF ADDITIONAL FLOOR OVER EXISTING GROUND FLOOR INCLUDING ALTERATION / MODIFICATION OF EXISTING GROUND FLOOR AT SPORTS COMPLEX, SECTOR-7, CHANDIGARH(COMPOSITE WORK)
2026_CHD_95555_1
CP3/2026/3118809
Open Tender
Civil Works
Percentage
120 days
SECTOR 7 CHANDIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10.9 L
17 Sept 2026
17 Sept 2026
5 Oct 2026
17 Sept 2026
5 Oct 2026
17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. : All kinds of soil | 408.35 | Cum | 172.71 | ₹70,526.13 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. : All kinds of soil. | 87.85 | Cum | 253.27 | ₹22,249.77 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 198.48 | Cum | 190.71 | ₹37,852.12 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 279.58 | Cum | 2,066.41 | ₹5,77,726.91 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 cement: 5 coarse sand (zone-Ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 570.77 | Cum | 6,342.6 | ₹36,20,165.8 |
| 6 | Making plinth protection 50 mm thick of cement concrete 1 :3:6 (1 cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75 mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 152.79 | Sqm | 729.07 | ₹1,11,394.61 |
| 7 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate I retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. : All works upto plinth level : Concrete of M25 grade with minimum cement content of 330 kg /cum | 132.08 | Cum | 9,248.12 | ₹12,21,491.69 |
| 8 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate I retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. : All works above plinth level upto floor V level : Concrete of M25 grade with minimum cement content of 330 kg /cum | 334.27 | Cum | 9,594.17 | ₹32,07,043.21 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete | 495 | Sqm | 381.56 | ₹1,88,872.2 |
| 10 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 176.79 | Sqm | 819.75 | ₹1,44,923.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 24.79 MB
BOQ_117374.xls
BOQ • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .