Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.8 LAccepted-AOC | ₹36.8 L | L1 | Accepted-AOC Responsive Bidder |
Updated dates
Tender Value
₹39.2 L
EMD Value
₹78,400
Closing Date
16 May 2026, 5:00 pmClosed
PMGSY Division Udhampur
PMGSY DIVISION UDHAMPUR- I UDHAMPUR
Permanent Restoration on road from Supply Morh to mangiote Pkg No JK14 359
2026_JKRRD_147557_8
e-nit 72 Permanent Restoration
Open Tender
Civil Works - Roads
25 days
PMGSY Division Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹78,400
26 May 2026
9 May 2026
18 May 2026
9 May 2026
16 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres in all kinds of soil. | 719 | Cum | 256.85 | ₹1,84,675.15 |
| 2 | Providing and laying in position cement concrete (1:4:8) including curing but excluding the cost of centring and shuttering. All work upto plinth level . aggregate. | 33.3 | Cum | 5,202.9 | ₹1,73,256.57 |
| 3 | Providing and laying in position cement concrete (1:3:6) including curing but excluding the cost of centring and shuttering. All work upto plinth level . | 163.45 | Cum | 5,733.6 | ₹9,37,156.92 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 205.83 | SQM | 286.35 | ₹58,939.42 |
| 5 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied
@ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge. | 726.48 | cum | 3,093.3 | ₹22,47,220.58 |
| 6 | Providing and laying Coping/flooring 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 60.54 | SQM | 416.5 | ₹25,214.91 |
| 7Carriage of material by mechanical transport from source to the site of work including loading/unloading and stakcing complete. | |||||
| 7.01 | Sand for an av. 50 Kms disntace. | 93.84 | Cum | 741.14 | ₹69,548.58 |
| 7.02 | Carriage of Boulder stone for gabbion from an Av. Distance from 06 KM | 726.48 | cum | 254.59 | ₹1,84,954.54 |
| 7.03 | Carriage of Stone agg. From avg 06 KM (BELOW 40MM SIZE) | 148.15 | Cum | 216.4 | ₹32,059.66 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_230288.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid