| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 LAccepted-Finance | L1 | Accepted-Finance Low Rate | |
| 2 | L2₹22.4 L+₹4.4 L (24.2%)Rejected-Finance BADHAWAL KHAS BHOJAPUR SAKALDIHA CHANDAULI CHANDAULI UTTAR PRADESH 232108 | CHANDAULI | UTTAR PRADESH | 232108 | L2 | Rejected-Finance High Rate | |
| 3 | L3₹24.5 L+₹6.5 L (36.1%)Rejected-Finance | L3 | Rejected-Finance High Rate |
Tender Value
₹24.1 L
EMD Value
₹24,100
Closing Date
8 Apr 2023, 12:00 pmClosed
Superintending Engineer Electricity Work Circle Mi
Superintending Engineer Electricity Work Circle, Fataha, Mirzapur-231001
33 KV Line Haliya from 132 KV Sub Station Chhanvey to 33 KV Sub Station Haliya
2023_PVVNV_791644_1
06/EWC(M)/2023-24
Open Tender
Construction Works
Lump-sum
210 days
Superintending Engineer Electricity Work Circle Mi
Please Refer Tender Document
2 documents required · 2 mandatory
₹3,540
Superintending Engineer Electricity Work Circle
₹24,100
Mirzapur
12 Apr 2023
3 Apr 2023
10 Apr 2023
3 Apr 2023
8 Apr 2023
3 Apr 2023
3 Apr 2023
Amount
SUPPLY OF MATERIALS
PCC Pole 9.0 m long (Provided by Department)
ST Pole 11.0 m long (SP-55) (Provided by Department)
V-type cross arm 100x50x6 mm, M.S. Channel (7.9 Kg/M, Total Weight 14.5 Kg) (Provided by Department)
ACSR dog conductor for 11.00 Ckt Km length of line with 3% Sag & jumpering (Provided by Department)
MS Angle 65x65x6 mm, 3.2 mtr long (5.8 kg per mtr) for guarding of double pole structure with clamp N&B (Provided by Department)
MS angle iron 65x65x6mm, 4300 mm long bracing (2 no. Bracing angle & 4 clamp) (Provided by Department)
Top channel 125x65mm 3200 mm (10.70 kg/m) with clamp (Provided by Department)
33 KV disc insulator polymeric 70 KN (B&S type) (Provided by Department)
Disc fitting 70 KN (B&S type) (Provided by Department)
33 KV Pin Insulator polymeric (Provided by Department)
Complete Stay (GI stay rod 20x1800 mm, stay wire 7/8 SWG 10 kg, stay clamp, bolt, nut & washer with concret grouting (Provided by Department)
Earthing of pole by MS earthing rod of 20x2500 mm and 6 SWG earting wire etc. (Provided by Department)
GI wire 6 SWG & 10 SWG for guarding and lacing (Provided by Department)
Cable Al 3x300 Sq mm XLPE 33 KV (Provided by Department)
33 KV Cable J/Kit (3x300 Sq mm) (Provided by Department)
Cross arm holding clamp with bolts & nuts
PG clamp
E-bracket for 33 KV
F-bracket for 33 KV
Bolts, Nuts & Washers
G.I. Pipe 6 inch dia
HDPE Pipe 6 inch dia
ERECTION OF WORK
Loading unloading & Transprotion of above all material from store mzp to dump store and dump store to site
Erection grouting & plinthing of 11 mtr ST Pole / 9 mtr PCC pole including in cost of grouting material as per NORMS
Erection grouting & plinthing of 11 mtr STP / 9 mtr PCC Double Pole with fitting of all accessories including in cost of grouting material as per NORMS.
Erection grouting & plinthing of 11 mtr STP / 9 mtr PCC Try Pole with fitting of all accessories including cost of grouting material as per NORMS.
Erection grouting & plinthing of 11 mtr STP / 9 mtr PCC four Pole with fitting of all accessories including cost of grouting material as per NORMS.
Drilling/Blasting of stone for pit of 9 mtr PCC pole / 11 mtr STP
Fitting & fixing of X-arm for 33 kv line
Erection, fitting, grouting & nozelling of stay rod with grouting material
Earthing of Pole by earthing rod
Laying stringing sagging of ACSR dog cond. For construction of 33 KV line including jumpring etc
Laying sagging & lacing of G.I. wire for gaurding with fitting & fixing of gaurding Angle etc.
Laying & Dressing of Under Ground 33 KV 3x300 sq mm XLPE cable after digging of pakka/katch road including in cost of brick, Patiya & sand as per NORMS
Jointing of H.S. O/D cable jointing kit for 33 KV 3x300sq mm XLPE cable
Fitting of Cable Marker with cost of material
Hoisting of 33 kv 3x300 sq mm cable on Double Pole by G.I.Pipe of size 4' dia, 3 mtr long & its jumpring as well as covering jumper with HT tape complete
Erection grouting & plinthing of 11 mtr ST Pole / PCC including in cost of grouting material as per NORMS for Sttud / say pole
Painting of STP 11 mtr & fitting with one coat of Red-Oxide Post Man colour & two coat Al. Paints including cost of materials
Tree branch cutting
S. P. ELECTRICAL CO
SHRI SAI TRANSMISSION CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .